Presentation is loading. Please wait.

Presentation is loading. Please wait.

2018 Exploration & Production Winter Standards Meeting Subcommittee 10

Similar presentations


Presentation on theme: "2018 Exploration & Production Winter Standards Meeting Subcommittee 10"— Presentation transcript:

1 2018 Exploration & Production Winter Standards Meeting Subcommittee 10
January 23-25, 2018 San Antonio, TX

2 2018 Winter Standards Meeting - Subcommittee on Well Cements (SC10) Agenda

3 2018 Winter Standards Meeting - Subcommittee on Well Cements (SC10) Agenda

4 SC-10 General Meeting Agenda:
Subcommittee on Well Cements (SC10) Wednesday, January 24th, 2018: General Meeting SC-10 General Meeting Agenda: Reading & Approval of Minutes from Calgary Reports of the Task/Work Groups Old Business New Business Adjourn

5 Minutes from Calgary have been posted on the API SC-10 SharePoint Site
Subcommittee on Well Cements (SC10) Wednesday, January 24th, 2018: General Meeting Minutes from Calgary have been posted on the API SC-10 SharePoint Site

6 Motion to Accept the Minutes as Posted on the API SharePoint Site?
Subcommittee on Well Cements (SC10) Wednesday, January 14th, 2018: General Meeting Motion to Accept the Minutes as Posted on the API SharePoint Site?

7 Reports of the Task/Work Groups
Subcommittee on Well Cements (SC10) Wednesday January 18th, 2017: General Meeting Reports of the Task/Work Groups

8 Subcommittee on Well Cements (SC10) Wednesday, January 18th, 2017: General Meeting
Reports of the Task/Work Groups: WG on API RP 10F Conversion – G. Benge TG on Cooperative Testing / TG on API Monogram Program / – B. Ulrich WG on Compressive Strength – G. De Bruijn WG on Surfactant Testing – DJ Dighe WG on the Measurement of Static Gel Strength – R. Eid WG on Comparison of Conditioning Practices for Cements – L. Padilla WG on API Spec 10D Revision – J. Hebert WG on HTHP Rheology – R. Lukay WG on Well Abandonment – J. Shine WG on Triaxial Mechanical Properties of Cement – A. Bois WG on Stage Cementing Equipment – A. Sanchez Rewrite of 10TR1 – G. De Bruijn Motion to Accept Reports

9 Subcommittee on Well Cements (SC10) Wednesday, January 24th, 2017: General Meeting
Old Business

10 Subcommittee on Well Cements (SC10) Existing Document Status:
Revision of API Specification 10A, 24th Edition, December 2010, “Specification for Cements and Materials for Well Cementing” Document reaffirmed in December 2015 25th Edition Ballot closed 12 January Document is currently in the ballot comment resolution stage. Revision of API RP 10B-2, Second Edition, April 2013, “Recommended Practice for Testing Well Cements” Publication of RP 10B-2, 2nd Edition April Comments are being logged, reviewed and discussed with set path forward after “Special Work Session” on Thursday, January 21st, 2016 Future revisions to include: Stirred Fluid Loss Testing, Fluid Loss Screens and elimination of inconsistencies between API Spec 10A and RP 10B-2 New WG was formed to revise/rewrite Sections 10, 11 & 12, specifically with regards to atmospheric vs HTHP slurry conditioning requirements. Document to be finalized then reviewed by SC10 Master Editor before sending to publications. Anticipate ballot the document in 2018 We will be required to ballot to reaffirm until revision in completed

11 Subcommittee on Well Cements (SC10) Existing Document Status:
API RP 10B-3, Second Edition, January 2016, “Recommended Practice on Testing of Well Cements used in Deepwater Well Construction” No ongoing work in SC10 API RP 10B-4, Second Edition, October 2015 “Recommended Practice on Preparation and Testing of Foamed Cement Formulations at Atmospheric Pressure”, No work ongoing on RP 10B-4 Technical Report (TR) on Foam Cement Behavior under Well Conditions is the second phase of this WG charge. Pending completion of section on Mechanical Properties and ballot.

12 Subcommittee on Well Cements (SC10) Existing Documents Status:
API RP 10B-5, First Edition, April 2005, “Recommended Practice on Determination of Shrinkage and Expansion of Well Cement Formulations at Atmospheric Pressure”, Document reaffirmed in April 2015. No work ongoing within SC10 Revision of API RP 10B-6, First Edition, August 2010, “Recommended Practice on Determining the Static Gel Strength of Cement Formulations”, Document revision is underway by Work Group.

13 Subcommittee on Well Cements (SC10) Existing Documents Status:
Revision of API Specification 10D, Sixth Edition March 2002, “Specification for Bow Spring Casing Centralizers” Document reaffirmed April 2015. Document revision currently underway by Work Group to include performance testing requirements for centralizers that are to be used in applications where they are run through restrictions that are smaller than the hole size in which they are to be set. API RP 10D-2, 1st Edition, “Recommended Practice for Centralizer Placement and Stop Collar Testing”, August 2004 Document reaffirmed in April 2015. No work ongoing within SC10

14 Subcommittee on Well Cements (SC10) Existing Documents Status:
Revision of API RP 10F, 3rd Edition, April 2002 “Performance Testing of Cementing Float Equipment” Document reaffirmed in April 2015. WG will publish rewrite as API Specification 10F, 4th Edition which will replace and make obsolete API RP 10F, 3rd Edition. This document will include required specifications and the associated performance testing protocols for the manufacturing of Cement Float Equipment. Document was balloted and is currently in publication the queue.

15 Subcommittee on Well Cements (SC10) Existing Documents Status:
Revision of API Technical Report 10TR1 Second Edition, September 2008, “Cement Sheath Evaluation” WG established and document is currently under revision. Publication of API Technical Report 10TR2 First Edition, July 1997, Shrinkage and Expansion in Oilwell Cements Reaffirmed September 2002 No work ongoing within SC10 Publication of Technical Report 10TR6, “Evaluation and Testing of Mechanical Cement Wiper Plugs”, 1st Edition, July 2015 Publication of API 10TR7 on “Mechanical Behavior of Cement” Published December 2017 No work ongoing with in SC10

16 Subcommittee on Well Cements (SC10) Existing Documents Status:
Revision of API RP 65-1, 1st Edition, “Cementing Shallow Water Flow Zones in Deepwater Wells”, September 2002 Reaffirmed 2012. Document is currently in page proof expected publishing date February or March, 2018 as API Standard 65-1. API Standard 65-2, 2nd Edition, December 2010, “Isolating Potential Flow Zones During Well Construction”, Reaffirmed November 26th 2016. No work ongoing within SC10 Revision of API Bulletin E3, 1st Edition, Environmental Guidance Document, January 1993, “Well Abandonment and Inactive Well Practices for U.S. Exploration and Production Operations” Reaffirmed 2000, revision is currently in the API publication queue.

17 Subcommittee on Well Cements (SC10) Existing Documents Status:
Creation of API RP 65-3, 1st Edition, “Well Abandonments.” Document creation underway by Work Group.

18 Subcommittee on Well Cements (SC10) Wednesday, January 24th, 2018: General Meeting
New Business

19 Subcommittee on Well Cements (SC10) Wednesday, January 24th, 2018: General Meeting
New Business: SC10 Standards Meeting Agenda ISO Workfront(s) – Awareness New Work Items John Buflod – API

20 Awarness: ISO/TC 67/SC 3/WG 2 – Work Plan

21 Subcommittee on Well Cements (SC10) Wednesday, January 24th, 2018: General Meeting
New Business: SC10 Standards Meeting Agenda ISO Workfront(s) – Awareness New Work Items John Buflod – API

22 Subcommittee on Well Cements (SC10) Wednesday, January 24th, 2018: General Meeting
Next Meetings: 2018 E&P Summer Standards Meeting: June 11-15, Denver, CO 2019 E&P Winter Standards Meeting: January 21-25, 2019, Hyatt Regency San Antonio, San Antonio, Texas 2019 E&P Summer Standards Meeting: June , 2019, New Orleans, LA

23 Subcommittee on Well Cements (SC10) Wednesday, January 24th, 2018: General Meeting
Any Other New Business?

24 Subcommittee on Well Cements (SC10) Wednesday, January 24th, 2018: General Meeting
Motion to Adjourn Note: Tomorrow's session in Frio Room 25

25 Thank you - Have a safe journey home! 2018 Exploration & Production
Winter Standards Meeting Subcommittee 10 January 23-25, 2018 San Antonio, TX January 17-19, 2017 JW Marriott Austin Austin, TX Thank you - Have a safe journey home!


Download ppt "2018 Exploration & Production Winter Standards Meeting Subcommittee 10"

Similar presentations


Ads by Google