Presentation is loading. Please wait.

Presentation is loading. Please wait.

API SC 10, Work Group Update:

Similar presentations


Presentation on theme: "API SC 10, Work Group Update:"— Presentation transcript:

1 API SC 10, Work Group Update:
Revision of 10 TR1, Cement Sheath Evaluation Sub-Committee 10 January 2016 1

2 Agenda: Wed, January 20th (2:00 PM – 2:30 PM)
WG Charge WG Membership Topics from the floor? 10TR1 Table of Contents Adjourn

3 Update 10TR1 Cement Sheath Evaluation:
Work Group Charge: Update 10TR1 Cement Sheath Evaluation: Include latest logging technology Include cement job execution data interpretation Include cement evaluation log data interpretation Include other evaluation techniques 3

4 Additional volunteers?
WG Volunteers: Gunnar DeBruijn (Schlumberger) Abe Vereide (BP) Glen Benge (Benge Consulting) Pavel Shaposhnikov (Schlumberger) Erick Cunningham (BP) David Stiles (ExxonMobil) Polina Khalilova (Schlumberger) Shailesh Dighe (Baker) Antonio Bottiglieri (Baker) Alan Parlipiano (Hess) Joe Shine (Aramco), Kris Ravi (Halliburton) Doug Patterson (Baker) Loran Galey (Apache) Keith Fisher (Southwestern) Gary Frisch (Halliburton) Glenn Donovan (Shell) Dan Mueller (ConocoPhillips) James Reid (Oxy) Luis Padilla (Chevron) Jerry Calvert Additional volunteers?

5 Topics from the floor?

6 Framework – Put Cement Sheath Evaluation in Perspective
Table of Contents (first draft) Introduction Scope Framework – Put Cement Sheath Evaluation in Perspective Objective of the Cement Job Zonal Isolation Casing Support Objective of Evaluation Methodology – based on objective of cement job, evaluation tools available Overall process flow Methodology for each evaluation dataset (lift pressure, show test, acoustics, temperature Available data sets …. Attached word document

7 Adjourn

8 Minutes Minutes of the WG Session for the update to 10TR1, Jan 20, 2pm
1. Reviewed the WG charge Work Group Charge: Update 10TR1 Cement Sheath Evaluation: Include latest logging technology Include cement job execution data interpretation Include cement evaluation log data interpretation Include other evaluation techniques Moved by Rick Lukay, 2nd by Glen Benge - carried 2. Reviewed Work Group members and solicited members (included on membership slide) 3. Discussion about topics not currently in 10TR1: consider topics Formation collapse, formation/casing interaction, and non-cementicious materials 4. Reviewed draft table of contents comments: do not discuss remedial or zonal isolation discussion on risk and reliability, should be linked back to objectives Thank you for the useful discussion 5. Adjourned at 2:20 pm


Download ppt "API SC 10, Work Group Update:"

Similar presentations


Ads by Google