MARCH 18, :00 A.M. CITY COUNCIL CHAMBERS 2016 TRAFFIC SUMMIT HOSTED BY: CITY OF LANSING DEPARTMENT OF PUBLIC SERVICE
Welcome and Introductions DEAN JOHNSON, P.E. CITY ENGINEER
The City Construction Map or Available on the City’s website!
Lansingmi.gov Departments Public Service Projects
Interactive Construction Map Project Type Key Pop-up box with specific construction information Select project
lansingmi.gov/TrafficAdvisorySignUp Additional Information Available: City of Lansing Public Service Department
Project Engineer Phone: ANN PARRY, P.E.
Major Street Rehabilitation Projects
Martin Luther King, Jr. Mill and Resurface Beginning June 6, 2016 Complete in 3 weeks Complete Closure Local Access Only Northbound Detour Southbound Detour Project Area MLK Blvd. Allegan St. Ottawa St. Walnut St. Pine St. Saginaw St. Oakland Rd. Project Area
Aurelius Road Mill and Resurface Beginning June 13, 2016 Complete in 2 weeks Jolly Rd. Cavanaugh Rd. Collins Rd. Forest Rd. Aurelius Rd. North/Southbound Aurelius Rd. Detour Detour Project Area
Aurelius Road Mill and Resurface Beginning June 13, 2016 Complete in 2 weeks Jolly Rd. Cavanaugh Rd. Pennsylvania Ave. Mt. Hope Ave. Aurelius Rd. East/Westbound Cavanaugh Rd. Detour Detour Project Area
2016 Major Street Rehabilitation Project Bid May 6, 2016 Anticipate Mid-June Start Complete by October 1, 2016
2016 Major Street Rehabilitation Project Clemens Ave. – Michigan Ave. to Kalamazoo St. Clemens Ave. – Kalamazoo St. to I-496 Jolly Rd.- Wise Rd. to Waverly Rd. Lowcroft Ave. – Holmes Rd. to Cavanaugh Rd. Greenlawn Ave. – Washington Ave. to Cedar St.
Clemens Ave. from Michigan Ave. to Kalamazoo St. Project Area E. Kalamazoo St. S. Pennsylvania Ave. E. Michigan Ave. Mill and Resurface Up to 4 week duration Detour Project Area
Clemens Ave. from Kalamazoo St. to I-496 Truck Detour Regular Detour Project Area E. Kalamazoo St. E. Mt Hope Ave. Pennsylvania Ave. S. Cedar St. Mill and Resurface Up to 4 week duration Project Area
Jolly Rd. Mill and Resurface Curb replacement south side between Wexford Rd. & Wise Rd. Sewer spot repairs Complete by September 2, 2016 Up to 6 weeks duration from Wise Rd. to S. Waverly Rd. Project Area
Jolly Rd. from Wise Rd. to S. Waverly Rd. Stage 1 Two Way Traffic Maintained Stage 1 Two-Way Traffic Stage 2 Two-Way Traffic Stage 3 EB LOCAL TRAFFIC ONLY Stage 2 One Lane Each Way Open Stage 3 Through Traffic Detoured Local Traffic EB Only
Jolly Rd. from Wise Rd. to S. Waverly Rd. Project Area Waverly Rd. Miller Rd. Wise Rd. Stage 3 Detour Through Traffic Detoured Local Traffic Eastbound ONLY Local Traffic ONLY Detour Project Area
Lowcroft Ave. From W. Holmes Rd. to W. Cavanaugh Rd. Project Area Cavanaugh Rd. S. MLK Blvd. W. Holmes Rd. Mill and Resurface Water main replacement from Holmes Rd. to Mason St. Curb replacement west side Holmes Rd. to Rouse St. Duration 2 months Detour Project Area
Greenlawn Ave. from S. Washington Ave. to Cedar St. Project Area S. Washington Ave. E. Mt. Hope. Ave. S. Cedar St. Mill and Resurface Beginning mid-August Up to 4 weeks Emergency Access Maintained from Washington Ave. Detour for Milling and Resurfacing – 4 days Max. McLaren Greater Lansing Detour Project Area
Additional Major Street Rehabilitation Streets To Be Determined
Sewer Rehabilitation Projects
Quincy Lane Sewer Rehabilitation Construction after July 1 Local Street Closure Local Traffic Only Sewer Replacement Road Reconstruction
Louisa St. Sewer Rehabilitation Project Area S. Cedar St. S. Pennsylvania Ave. Sewer spot repairs Road reconstruction Local Street Closure Local Traffic Only
Christiansen Rd. Sewer Rehabilitation Project Area Reo Rd. Pleasant Grove Rd. Sewer Replacement Water main Replacement Road Reconstruction Local Street Closure Local Traffic Only Jolly Rd.
Wood St. Sewer Rehabilitation Project Area Lake Lansing Rd. Replacing Sewer East of the roadway May need lane closure
Forest Glen Storm Sewer Project Area Tecumseh River Drive Reroute Storm Sewer Local Street Closure Local Traffic Only
Project Engineer Phone: DAN DANKE, P.E.
2016 Local Street Overlay Paving StreetFrom:To: Carey StreetSaginaw StreetNorth Genesee Drive Kingsley CourtMartin Luther King, Jr. Blvd.Riddle Street Eighth StreetMichigan AveVine Street Pulaski StreetMartin Luther King, Jr. Blvd.Birch Street Braman StreetMartin Luther King, Jr. Blvd.Fletcher Street Balmoral DriveGlenburne Blvd. Bayview DriveSheffield Blvd.Windward Drive Ingham StreetJolly RoadREO Road Reo RoadMartin Luther King, Jr Blvd.Burchfield Ave Rockingham DriveTruxton LaneBridgeport Drive
2016 Local Street Paving Additional Streets to be Determined After the Spring Thaw SEND HELP!
2016 Local Street Rehabilitation StreetFrom:To: Genesee StreetPine StreetButler Blvd. Andrea DriveGrand River AveVine Street Bedford StreetVictor AveWoodview Drive Holly WayPleasant Grove RoadChatham Road Lochmoor DriveWaverly RoadBrighton Drive Rouse StreetCedar StreetDonald Street Hunter BlvdCedar StreetRidgewood Ave Rosemont StreetMaplehill AveHunter Blvd. Catherine StreetHolmes RoadGlenbrook Drive Pettis StreetMoores River DriveBlair Street S. Dexter DriveEllen AveParkview Ave Holmes RoadS. Dexter Drive
2016 Local Street Rehabilitation Additional Streets to be determined
Sidewalk Repair Project