Presentation is loading. Please wait.

Presentation is loading. Please wait.

To The For The. CITY OF GLENDALE, CA Community Meeting, January 9, 2016 Ocean View Blvd. Looking South Intersection Verdugo Road and Ocean View Blvd.

Similar presentations


Presentation on theme: "To The For The. CITY OF GLENDALE, CA Community Meeting, January 9, 2016 Ocean View Blvd. Looking South Intersection Verdugo Road and Ocean View Blvd."— Presentation transcript:

1 To The For The

2 CITY OF GLENDALE, CA Community Meeting, January 9, 2016 Ocean View Blvd. Looking South Intersection Verdugo Road and Ocean View Blvd. Intersection Broadview Drive and Ocean View Blvd. Intersection Sunview Drive and Ocean View Blvd.

3 ANTICIPATED CONSTRUCTION START DATE: Spring 2016 PROJECT DURATION: 115 Calendar Days barring any unforeseen conditions MEETING AGENDA MEETING AGENDA Project Scope of Work and Locations Sewer Point RepairsIntersection Improvements Concrete and Pavement Repairs Street TreesSignal ModificationsConstruction Phasing /Scheduling Public Notification Process Questions / Comments

4 RESOURCEFUL FACTS -R&R (Remove & Replace) -ARHM (Asphalt Rubber Hot Mix) -AC (Asphalt Concrete) -PCC - Portland Cement Concrete (for Sidewalks, Curbs, etc.) -ADA (Americans with Disabilities Act)

5 LOCATION MAP LOCATION MAP

6 Sewer Main Point Repair(Ocean View Blvd. and Side Streets) Repair of Damaged/Cracked Pipes at Various Locations 2-3 Day Work at Specific Locations Working Hours: 9am – 3pm

7 BUMP-OUT CONSTRUCTION AND TRAFFIC SIGNAL MODIFICATIONS AT OCEAN VIEW BLVD. AND BROADVIEW DRIVE

8 BUMP-OUT CONSTRUCTION AT OCEAN VIEW BLVD. AND SUNVIEW DRIVE

9 STREET ALIGNMENT IMPROVEMENTS AND TRAFFIC INSTALLATION AT OCEAN VIEW BLVD. AND VERDUGO ROAD

10 HONOLULU AVENUE AND MARKET STREET BUS STOP MODIFICATION

11 RUBBERIZED (ARHM) PAVEMENT OVERLAY Improves the Ride and Structural Integrity of the Roadway Place 1.5 ” ARHM Overlay Over Existing Base Pavement Eco Friendly (Uses Tires) Begins NEW Service Life for Pavement Quieter and Smoother Ride Better Road Friction

12 CONCRETE Remove and Replace Uplifted/Broken/Damaged: Sidewalks, Curb Ramps, Driveway Aprons Curb/Gutter, Cross Gutters

13

14 Trees Plantings (Possible 4 to 5) Pink Trumpet Tree (tabebuia impetiginosa) Removals Three Tree Removals at Verdugo Road Median

15

16 Public Notification Community Meeting (Today) City Website (Bid Advertisement) Director’s Letter (1-2 months ahead) Contractor’s Notification Letter (2~3 weeks ahead) 3-Day Door Hanger (Concrete/AC R&R) (3 days) City Website (Construction Progress)

17

18 For questions or general information, please contact: Armond SimonianYvonne Guerra PW Project ManagerPW Community Outreach (818) 937-8250(818) 548-3945 or email: asimonian@gledaleca.gov


Download ppt "To The For The. CITY OF GLENDALE, CA Community Meeting, January 9, 2016 Ocean View Blvd. Looking South Intersection Verdugo Road and Ocean View Blvd."

Similar presentations


Ads by Google