Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | www.townofchapelhill.org Proposed Resurfacing FY16 and FY17 (Spring/Summer 2016)

Similar presentations


Presentation on theme: "Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | www.townofchapelhill.org Proposed Resurfacing FY16 and FY17 (Spring/Summer 2016)"— Presentation transcript:

1 Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | www.townofchapelhill.org Proposed Resurfacing FY16 and FY17 (Spring/Summer 2016)

2 Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | www.townofchapelhill.org Review and Approval Process Pavement Condition Evaluation

3 Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | www.townofchapelhill.org Alligator Cracking (7.9%) Reflective Cracking (0.0%) Block Cracking (4.9%) Pavement Distresses Rutting (3.0%)

4 Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | www.townofchapelhill.org Patching (9.0%)Ride Quality (14.6%) Bleeding (0.0%) Pavement Distresses Raveling (0.7%)

5 Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | www.townofchapelhill.org Review and Approval Process Pavement Condition Evaluation Priority Consideration Given to –Council and Community Interests –Multi-Modal Streets and Collector Streets –Projects that Leverage Funds and Return Coordination with Internal Staff and Other Entities Very Good100-91 Good90-81 Fair80-66 Poor65-51 Very Poor50-0

6 Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | www.townofchapelhill.org Coordination with Other Entities

7 Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | www.townofchapelhill.org Review and Approval Process Street Evaluation Priority Consideration Given to –Council and Community Interests –Multi-Modal Streets and Collector Streets –Projects that Leverage Funds and Return Coordination with Internal Staff and Other Entities Transportation and Connectivity Advisory Board TMT Review and Recommendations Council Approval for FY17 Resurfacing– June 13

8 Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | www.townofchapelhill.org FY16 and FY17 Funding

9 Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | www.townofchapelhill.org Completed Projects Plum Ln. Highland Woods Rd. (Ronald McDonald House to Old Mason Farm Rd.) Approved Projects Ridge Rd. (Manning Dr. to Boshamer Stadium) Friday Center Dr. (Town-Maintained Portion) Rosemary St. (Henderson St. to Merritt Mill Rd.) Ramsley Subdivision and Chapel Hill Watch Connector Road

10 Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | www.townofchapelhill.org FY16 Street Resurfacing STREETFROMTORATING Copperline Dr.Kildaire Rd. 47Very Poor Elliott Rd.Curtis Rd.Franklin St.58Poor N. Lakeshore Dr.Brookview Dr.S. Lakeshore Dr.28Very Poor Market St.Brookgreen Dr. 56Poor Holly Ln.Willow Dr.Cul-de-sac0Very Poor Multi-Modal Collector Estimated costs exclude curb and gutter and ADA improvements, unless otherwise noted. *Market Street cost includes traffic calming tables. **Holly Lane cost includes curb and gutter work.

11 Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | www.townofchapelhill.org FY17 Street Resurfacing STREETFROMTORATING Edgewater Cir.Arlen Park Dr.Copperline Dr.52Poor Pebble Springs RdCul-de-sac 22Very Poor Ridge Rd. Boshamer Stadium Country Club Rd.62Poor Sage Rd.Fordham Blvd.Erwin Rd.47Poor Stateside Drive Martin Luther King Jr BlvdDead End21Very Poor Sprunt St. Meadowmont Ln.Old Barn Ln.40Very Poor Swift RunPerry Creek Dr.Cul-de-sac19Very Poor Country Club Rd.Raleigh Rd.Raleigh St.58Very Poor Multi-ModalCollector

12 Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | www.townofchapelhill.org Other Lowest Rated Streets STREETFROMTORATING 1Tenney CircleGlenburnieTenney Cir.20 2Blue Granite Ct.Pitch Pine Ln.cul-de-sac22 3Chesapeake Waycul-de-sac 22 4N. Columbia St.Longview St. 22 5Pinehurst Dr.Burning Tree DriveDead end22 6Nuttree Ln.Cobble Ridge Dr.Rossburn Way22 7Rosemary St.Hillsborough St.Boundary St.23 8Brookstone Dr.Homestead Rd.Northfield Dr.23 9West University Dr.Ransom St.Westwood Dr.24 10Crest Dr.Merritt Mill Rd.Johnson St.24 11Roberson St.Rosemary St.Mitchell Ln.25 12Columbia Place W.Columbia Place Dr.cul-de-sac26 13Shady Lawn Rd.Kenmore Rd.Boulder Ln.28 14Birch Cir.Hemlock Dr.cul-de-sac28 15Columbia Place Dr.N. Colmbia St.Columbia Place E.28 16Bolinwood Dr.Whistling Tree Ct.Hillsborough St.31 17Hemlock Dr.Cypress Rd.Long Leaf Dr.32 18Boundary St.Franklin St.Rosemary St.34 19Weaver Dairy Road Ext.Begin MedianRowe Rd.44 20Cameron Ave.Pittsboro St.Merritt Mill Rd.46 Multi-Modal Collector

13 Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | www.townofchapelhill.org Sage Road – PCR 47 Sage Rd – PCR 47 Elliott Rd. – PCR 58 Plum Ln Holly Lane – PCR 0 N. Lakeshore Dr. – PCR 28 Pebble Springs Rd. – PCR 22 Swift Rn. – PCR 19 Stateside Dr. – PCR 21

14 Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | www.townofchapelhill.org

15 Country Club Rd. – PCR 58 Market St. – PCR 56 Sprunt St. –PCR 40 Ridge Rd. – PCR 0 Edgewater Cir. – PCR 52 Copperline Dr. –PCR 47

16 Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | www.townofchapelhill.org Questions/ Concurrence?

17 Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | www.townofchapelhill.org Pavement Life Cycle

18 Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | www.townofchapelhill.org Declining Trend in Pavement Condition Rating Chapel Hill Pavement Condition Survey Results Estimated Cost for Routine Maintenance & Resurfacing Needs (in Millions)

19 Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | www.townofchapelhill.org

20 Achieve an Average Paving Cycle of 14 Years by FY22


Download ppt "Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | www.townofchapelhill.org Proposed Resurfacing FY16 and FY17 (Spring/Summer 2016)"