Presentation is loading. Please wait.

Presentation is loading. Please wait.

Meadow Lane – Brandon Road Improvements Welcome!

Similar presentations


Presentation on theme: "Meadow Lane – Brandon Road Improvements Welcome!"— Presentation transcript:

1 Meadow Lane – Brandon Road Improvements Welcome!
Open House November 29, 2018

2 Project Location and Limits
INSERT MAP WITH CITINGS Meadow Lane: From E. Lake Ave to Elmwood Ave (approximately 1,300 feet) Brandon Road: From E. Lake Ave to Forest Ave (approximately 600 feet) All work to be completed within the public right-of-way Construction year: 2019

3 Scope of Work and Benefit to Residents
Replacement of existing water main with 8 inch diameter water main including 1 ½” water services and b- boxes Repair of existing storm sewer system including upsizing portions including the addition of new manholes and drainage inlets Repair of existing sanitary sewer system Removal of the existing roadway and reconstruct a new asphalt roadway Parkway restoration with sod

4 Tentative Schedule and Next Steps
Dates Steps November 29, 2018 Open House Meeting: Residents view plans and provide feedback December 2018 Finalize Design Plans and Bidding Process January 2019 Contract Award March 2019 Pre-construction Resident Meeting April 2019 Anticipated Start of Project

5 Resident FAQ’s Sections of private driveways in public easement will be replaced if damaged during construction with the exception of edging materials and brick paver driveways. If my driveway is damaged, will it be fixed or replaced? Private drives will be accessible the majority of the time during construction. If your driveway needs to be closed, notice will be provided to allow adequate time to make arrangements. Will my driveway be closed during construction? Parkway areas disturbed by construction will be restored with sod during the last stage of construction. Please note that residents are responsible for the removal of private items located within parkway such as landscaping features, fencing, boulders, sprinklers, planters, etc. These items will not be replaced if damaged. Will the parkway be restored after construction is completed?

6 Contact Us ! https://glenview.il.us/Pages/BrandonMeadow.aspx
Written comment Engineering/Capital Projects Project Information and updates will be posted on the Village of Glenview Website and Construction Blog. 2500 East Lake Avenue Glenview, IL 60026 Capital Improvement Program/Engineering Adriana Webb address: Phone: (847) Construction Tim Schwister address: Phone: (847)


Download ppt "Meadow Lane – Brandon Road Improvements Welcome!"

Similar presentations


Ads by Google