Global Design Effort - CFS 08-04-10 ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.

Slides:



Advertisements
Similar presentations
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Advertisements

Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Central Region Discussion Power and Cooling GDE Beijing-CFS.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas CFS AD&I Status Report Conventional.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
SLAC_OCT07 BDS-KOM-CFS 1 Beam Delivery System & Interaction Region KOM Conventional Facility & Siting Overview Fred Asiri/SLAC Acknowledgment: Atsushi.
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
1 Status of SB2009 Rebaselining Proposal Document and Preview of Feedback from PMs + Editor Draft C N.Toge.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP IWLC10.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Conventional Facilities and Siting Global Group (ARCFS)
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Americas KlyCluster Cost Analysis Overview
CONVENTIONAL FACILITIES presented by Peter H. Garbincius
Yamamoto WG3: ML-SCRF Parallel Session,
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
ILC CFS AD&I Daresbury Lab Summary
Tom Lackowski Revised 10/12/2011
Overview of Day One – 29 Feb 2016
ILC - Global Design Effort
Presentation transcript:

Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Summary V. Kuchler, J. Osborne, A. Enomoto

Global Design Effort - CFS ILC CFS and Global Systems Meeting Main CFS Focus CFS Workshop at Daresbury Laboratory, UK CFS Workshop at Daresbury Laboratory, UK  July 12-13, 2010  Focus on Mechanical and Electrical Criteria Update  Area Systems, e+ Source, Damping Ring, Beam Delivery System and MDI/Detectors CFS Workshop at SLAC Laboratory, US CFS Workshop at SLAC Laboratory, US  August 2-3, 2010  Focus on Mechanical and Electrical Criteria Update  Area Systems, e- Source, RTML, Main Linac and MDI/Detectors CFS Group Prepared a Set of Questions and Spreadsheets that were Distributed to Area Systems Representatives Prior to the Meetings CFS Group Prepared a Set of Questions and Spreadsheets that were Distributed to Area Systems Representatives Prior to the Meetings 2

Global Design Effort - CFS ILC CFS and Global Systems Meeting Daresbury Attendees Project Management Project Management  M. Ross, N. Walker, E. Paterson, P. Garbincius (via Webex) CFS CFS  V. Kuchler, L. Hammond, R. Wielgos, A. Enomoto, M. Miyahara, M. Terunuma, M. Gastal e+ Source e+ Source  J. Clarke, N. Collomb Damping Ring Damping Ring  S. Giuducci (via Webex), M. Palmer BDS BDS  D. Angal-Kalinin MDI and Detectors MDI and Detectors  A. Seryi, P. Burrows 3

Global Design Effort - CFS ILC CFS and Global Systems Meeting Daresbury Progress e+ Source e+ Source  Base Criteria was Reviewed and Some Adjustments were Made  The Issue of Number and Size of Dumps Needs to be Re- Evaluated and Finalized Damping Ring Damping Ring  Existing Criteria is Correct However There are New Requirements for a Water-Cooled Buss System  Criteria will be Developed for the New Power Distribution Requirements and it’s Effect on the Tunnel Cross Section Configuration  CFS Needs to Study Alternative Ambient Tunnel Temperatures (94F and 77F)  Basis of CFS Tunnel Design should be Large Enough to Accommodate One Electron Ring and Two Positron Rings 4

Global Design Effort - CFS ILC CFS and Global Systems Meeting Daresbury Progress cont. BDS BDS  Spreadsheets for Power Supplies, Magnet Numbers and Magnet Power Need to be Updated  A. Seryi will Update “Environmental Requirements in BDS”  CFS will Investigate the Most Sensitive Areas of the BDS and Determine if Segmenting with Respect to Ambient Temperature is the Right Approach  N. Collomb will Develop a Spreadsheet with BDS Magnet Information MDI/Detectors MDI/Detectors  M. Gastal Provided an Update of CLIC Detector Hall Design Progress  P. Garbincius Provided an Overview of Items Included in the Detector Estimates  P. Burrows Presented a Criteria Spreadsheet for the SiD for CFS Criteria 5

Global Design Effort - CFS ILC CFS and Global Systems Meeting SLAC Attendees Project Management Project Management  M. Ross, A. Yamamoto, E. Paterson, P. Garbincius (via Webex) CFS CFS  V. Kuchler, L. Hammond, R. Wielgos, A. Enomoto, T. Lackowski (via Webex) e- Source e- Source  A. Brachman, J. Sheppard RTML RTML  N. Solyak (via Webex) Main Linac Main Linac  C. Adolphsen, C. Nantista, S. Fukuda and T. Shidara (via Webex) MDI and Detectors MDI and Detectors  SiD - M. Breidenbach, M. Oriunno T. Markiewicz  ILD – K. Sinram, Y. Sugimoto, T. Sanuki 6

Global Design Effort - CFS ILC CFS and Global Systems Meeting SLAC Progress e- Source e- Source  Base Criteria is the Same as RDR Except for a 5% Increase Due to Geometry Changes  The Issue of 5 Hz to 10 Hz Operation will Increase the Electrical Power and Heat Loads for the e- Source  Issues on the Number of Dumps Needs to be Revisited  e- Source will Not be the Driver for Temperature Stability in the BDS Enclosures RTML RTML  Some Discrepancies were Noted in the Criteria Tables and will be Corrected  6 of the Original 42 Cryomodules will Remain in the RTML  The Remaining 36 Cryomodules will be Added to the Main Linac  Again the Issue of the Number of Dumps was Noted as Needing Review 7

Global Design Effort - CFS ILC CFS and Global Systems Meeting SLAC Progress cont. MDI/Detectors MDI/Detectors  Frank and Productive Discussions Helped to Identify Fundamental Issues That Need to be Addressed  Shielding Around the Beampipe During Commissioning  Regional Geological Constraints and Characterization  Dimensional Differences Between the Two Detectors  Platform Requirements for the ILD Detector  No Platform Required for SiD  Unique Requirements for a Mountain Site  M. Oriunno Needs Geologic Information to Complete Vibration Modeling for Detectors – CFS Will Help to Compile  CFS Will Develop a Design for a Flat, Post-Tensioned Floor for the IR Hall  No Shielding Wall is Required Between the Detectors  Mechanical Heat Loads and Electrical Requirements are in Line with Current CFS Design 8

Global Design Effort - CFS ILC CFS and Global Systems Meeting SLAC Progress cont. Main Linac Main Linac  Surface Building Configuration Studies for the Klystron Cluster RF Alternative were Presented  Marx Modulator Configuration was Shown to Reduce the Equipment Footprint Required – CFS will Adjust Surface Building Studies to Reflect Marx Configuration  C. Nantista will Update Criteria for Main Linac  DRFS Tunnel Diameter is Now 5.7 M Diameter  Americas Region will Review Tunnel Cross Sections and Provide Uniform Dimensioning for all Tunnel Components and Clearances Required and Provide to all Regions for Consistent Tunnel Cross Section Development  A Tour of the Marx Modulator Configuration was Provided 9