Global Design Effort - CFS 10-26-11 ILC Source/RTML/BDS + MDI Technical Baseline Review 24-27 October 2011 1 ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.

Similar presentations


Presentation on theme: "Global Design Effort - CFS 10-26-11 ILC Source/RTML/BDS + MDI Technical Baseline Review 24-27 October 2011 1 ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE."— Presentation transcript:

1 Global Design Effort - CFS 10-26-11 ILC Source/RTML/BDS + MDI Technical Baseline Review 24-27 October 2011 1 ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE REVIEW CFS REQUIREMENTS for ELECTRON SOURCE CONVENTIONAL FACILITIES AND SITING V. Kuchler

2 Global Design Effort - CFS 10-26-11 ILC Source/RTML/BDS + MDI Technical Baseline Review 24-27 October 2011 Overview Criteria Development Criteria Development Drawings Drawings Mechanical and Electrical Criteria Mechanical and Electrical Criteria Remaining Issues Remaining Issues 2

3 Global Design Effort - CFS 10-26-11 ILC Source/RTML/BDS + MDI Technical Baseline Review 24-27 October 2011 Criteria Development Some Meetings were Held Some Meetings were Held  CFS Weekly Webex Meetings  Numerous Email Exchanges  Parallel Sessions at Major Workshops Criteria Document has been Developed for the e- Source Criteria Document has been Developed for the e- Source Mechanical and Electrical Criteria were Taken Primarily from those Contained in the RDR Mechanical and Electrical Criteria were Taken Primarily from those Contained in the RDR Full Mechanical and Electrical Design will be Available by December 2011 Full Mechanical and Electrical Design will be Available by December 2011 3

4 Global Design Effort - CFS 10-26-11 ILC Source/RTML/BDS + MDI Technical Baseline Review 24-27 October 2011 4 Plan View Upstream and at the Electron Source

5 Global Design Effort - CFS 10-26-11 ILC Source/RTML/BDS + MDI Technical Baseline Review 24-27 October 2011 5 Plan View Upstream of Electron Source

6 Global Design Effort - CFS 10-26-11 ILC Source/RTML/BDS + MDI Technical Baseline Review 24-27 October 2011 6 e- 1 NC Tune Up Dump e- 1 NC Tune Up Dump Plan View at Electron Source

7 Global Design Effort - CFS 10-26-11 ILC Source/RTML/BDS + MDI Technical Baseline Review 24-27 October 2011 7

8 Global Design Effort - CFS 10-26-11 ILC Source/RTML/BDS + MDI Technical Baseline Review 24-27 October 2011 8 Plan View at ELTR/Damping Ring

9 Global Design Effort - CFS 10-26-11 ILC Source/RTML/BDS + MDI Technical Baseline Review 24-27 October 2011 9 Cover Sheet for the CFS Mechanical and Electrical Design Criteria Document Cover Sheet for the CFS Mechanical and Electrical Design Criteria Document

10 Global Design Effort - CFS 10-26-11 ILC Source/RTML/BDS + MDI Technical Baseline Review 24-27 October 2011 10 Mechanical & Electrical – Electron Source We Don’t have Detailed Information Other than the Total 4.3MW Load from RDR. This Accounts for About 2% of the Total ILC Technical LoadWe Don’t have Detailed Information Other than the Total 4.3MW Load from RDR. This Accounts for About 2% of the Total ILC Technical Load There are No Requirements for Tight Space Temperature Stability. Space Temperature is Expected to be About 85FThere are No Requirements for Tight Space Temperature Stability. Space Temperature is Expected to be About 85F The CFS Electrical Service Terminates at Panelboards Equally Distributed in the Service TunnelThe CFS Electrical Service Terminates at Panelboards Equally Distributed in the Service Tunnel The CFS Process Water Terminates with Valves at the Pipe Header, with Equally Sized Skids Located in the Service Tunnel Based on Combined Loads in the Central RegionThe CFS Process Water Terminates with Valves at the Pipe Header, with Equally Sized Skids Located in the Service Tunnel Based on Combined Loads in the Central Region

11 Global Design Effort - CFS 10-26-11 ILC Source/RTML/BDS + MDI Technical Baseline Review 24-27 October 2011 11

12 Global Design Effort - CFS 10-26-11 ILC Source/RTML/BDS + MDI Technical Baseline Review 24-27 October 2011 12 CFS Positron Summary In General Electron Source Criteria is Well UnderstoodIn General Electron Source Criteria is Well Understood  RDR Criteria Remains Fundamentally Unchanged  Overall Equipment Layout  Mechanical and Electrical Criteria There Remain Details that Still Need ClarificationThere Remain Details that Still Need Clarification  Specific Boundary Points Between Adjacent Area Systems  Physical Size of Lower Energy Dumps  Verification of Enclosure Size for Muon Walls  Location, Physical Size and Density of e- Source Equipment in BDS and Service Tunnel At This Time, Changes to the Mechanical and Electrical Criteria are not AnticipatedAt This Time, Changes to the Mechanical and Electrical Criteria are not Anticipated Final Updates to CFS Drawings will be Completed Prior to the CFS BTR In March at CERNFinal Updates to CFS Drawings will be Completed Prior to the CFS BTR In March at CERN TDR Drawings and Criteria will be Entered into EDMS After Validation at the CFS BTRTDR Drawings and Criteria will be Entered into EDMS After Validation at the CFS BTR


Download ppt "Global Design Effort - CFS 10-26-11 ILC Source/RTML/BDS + MDI Technical Baseline Review 24-27 October 2011 1 ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE."