Global Design Effort - CFS 11-18-09 ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.

Similar presentations


Presentation on theme: "Global Design Effort - CFS 11-18-09 ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS."— Presentation transcript:

1 Global Design Effort - CFS 11-18-09 ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status Report V. Kuchler, J. Osborne, A. Enomoto

2 Global Design Effort - CFS 11-18-09 ILC CFS and Global Systems Meeting Overview Status of Drawings Status of Drawings Status of Cost Estimates Status of Cost Estimates Status of CFS Portion of AD&I Proposal Document Status of CFS Portion of AD&I Proposal Document 2

3 Global Design Effort - CFS 11-18-09 ILC CFS and Global Systems Meeting Status of Drawings Beamline Layout Received from N. Collomb in Mid-October Based on Available Lattice and Beamline Information Beamline Layout Received from N. Collomb in Mid-October Based on Available Lattice and Beamline Information CFS Drawings are Based on this Beamline Information with the Addition of the Dimension to Equalize Timing Issues CFS Drawings are Based on this Beamline Information with the Addition of the Dimension to Equalize Timing Issues This Layout is Established as the Baseline for the AD&I Proposal Document and Cost Estimates This Layout is Established as the Baseline for the AD&I Proposal Document and Cost Estimates FNAL Has Completed: FNAL Has Completed:  A Complete 2D Machine Layout Drawing in AutoCAD Format in Small Scale  A Drawing Set, at Intermediate Scale, of the Central Region  A Revised Version of the Overall RDR Schematic Machine Layout Drawing  A Revised Beamline “Arrow Diagram” 3

4 Global Design Effort - CFS 11-18-09 ILC CFS and Global Systems Meeting Status of Drawings cont. All Drawings will be Posted to the EDMS System for Review by Area and Technical Systems All Drawings will be Posted to the EDMS System for Review by Area and Technical Systems The 2D Machine Layout Drawing will be the Basis for the 3D CFS Enclosure Drawing that will be Developed by the CFS Effort at CERN Using the European Cavern Configuration The 2D Machine Layout Drawing will be the Basis for the 3D CFS Enclosure Drawing that will be Developed by the CFS Effort at CERN Using the European Cavern Configuration The 2D Machine Layout Drawing will also be the Basis for the 3D Support Utility Drawings that will be Developed by the CFS Effort at FNAL (M+W Zander) The 2D Machine Layout Drawing will also be the Basis for the 3D Support Utility Drawings that will be Developed by the CFS Effort at FNAL (M+W Zander) When Completed, 3D Drawings will be Forwarded to DESY for Inclusion into the Complete ILC 3D Model When Completed, 3D Drawings will be Forwarded to DESY for Inclusion into the Complete ILC 3D Model The CFS Goal is to have the 3D Drawings Completed in Time for the AD&I Meeting at DESY The CFS Goal is to have the 3D Drawings Completed in Time for the AD&I Meeting at DESY 4

5 Global Design Effort - CFS 11-18-09 ILC CFS and Global Systems Meeting Status of CFS Cost Estimates The Americas Region has Developed the Following Cost Estimates and Provided Them to the Cost Group: The Americas Region has Developed the Following Cost Estimates and Provided Them to the Cost Group:  Full Cost Estimate Based on the Machine Layout Developed for the ALCPG 09 Meeting in Albuquerque  Main Linac Klystron Cluster High Power Option  Main Linac Klystron Cluster Low Power Option  Main Linac DRFS High Power Option  Main Linac DRFS Low Power Option  Main Linac Tunnel Alternative Study The Full Cost Estimates, Based on the New 2D Machine Layout Drawing and Both Klystron Cluster and DRFS (High and Low Power) has been Completed and Provided to Peter Garbincius The Full Cost Estimates, Based on the New 2D Machine Layout Drawing and Both Klystron Cluster and DRFS (High and Low Power) has been Completed and Provided to Peter Garbincius The Asian Region has Developed a Preliminary Cost Estimate for the DRFS High Power Option The Asian Region has Developed a Preliminary Cost Estimate for the DRFS High Power Option 5

6 Global Design Effort - CFS 11-18-09 ILC CFS and Global Systems Meeting Status of CFS AD&I Proposal Document Text for the CFS Portion of the AD&I Proposal Document has been Developed, Reviewed and Iterated. Text for the CFS Portion of the AD&I Proposal Document has been Developed, Reviewed and Iterated. Version 4 will be Provided to the N. Toge and the Project Managers this Week Version 4 will be Provided to the N. Toge and the Project Managers this Week Version 4 will Include the Following Drawings: Version 4 will Include the Following Drawings:  Asian Region Main Linac Tunnel Cross Section  Americas Region Main Linac Tunnel Cross Section  European Region Main Linac Tunnel Cross Section  3D Drawing Example  Schematic Machine Layout Drawing  Beamline “Arrow Diagram” 6