Presentation is loading. Please wait.

Presentation is loading. Please wait.

WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.

Similar presentations


Presentation on theme: "WG3: Main Linac H. Hayano, C. Nantista, C. Pagani."— Presentation transcript:

1 WG3: Main Linac H. Hayano, C. Nantista, C. Pagani

2 Main Linac session (blue part) : Time chart

3 March 27, Saturday Tunnel Layout (Joint with CFS) HLRF (Joint with CFS) Main Linac Integration (Joint with Beam Dynamics) CFS Tunnel StatusT. Lackowski Klystron Cluster EquipmentC. Nantista DRFS EquipmentS. Fukuda General Installation EquipmentI. Ruehl DRFS DevelopmentShigeki Fukuda Power supply for DRFSMitsuo Akemoto LLRF consideration for DRFSShinichiro Michizono KCS DevelopmentChris Natista HOM's and Gradient SpreadChris Adolphsen discussion w/ CFS(V. Kuchler) Flash overviewNicholas Walker Analysis of FLASH Beam on Gradient Stability DataShilun Pei 9mA FLASH Workshop SummaryShinichiro Michizono Update of RTML, FNAL BPM and Split SC QuadNikolay Solyak Split SC QuadNikolay Solyak Lorents Force Detuning Studies at STFYasuchika Yamamoto Linac Beam Dynamics UpdateKiyoshi Kubo ( DRFS, Klystron cluster ) ( Flash, others )

4 March 28, Sunday Cavity Cavity Integration Summary of understanding of quench limit in 9-cell cavities using T- mapping and optical inspection Yasuchika Yamamoto, Sebastian Aderhold Latest 9-cell cavity testing results from FNALJoe Ozelis Recent cavity test results from KEKEiji Kako New results on field emission suppressionRongli Geng Comparison EP procesing parameters at KEK and JLABTakayuki Saeki IHEP high gradient efforts on 1.3 GHz 9-cell cavity for ILCJie Gao Efforts on the R&D of SRF cavity at Peking UniversityKe-Xin Liu Replica-method and local grinding repairKen watanabe Review of plans for upcoming cavity processing and testingCamille Ginsburg Review on ACD topics (new shape, large-grain cavity,vertical EP etc)Zack Convey, Fumio Furuta Update on global cavity database and yield evaluationYasuchika Yamamoto, Camille Ginsburg Status report of DESY activitiesEckhard Elsen discussion Operational Gradient re-evaluation discussions ILC Gradient R&D status and challengesRongli Geng Gradient strategy proposalA. Yamamoto discussion Test facility status, tuner&coupler plug-compatibility discussions Status of NMLBob Kephart Status of STFHitoshi Hayano R&D status in INFN Pisa Carmine Elvezio Pagliarone discussion Plug-compatibility documentH. Hayano Joint with BDS for 10Hz operation (HLRF, Cryo people) ( Operational gradient re-evalution, Test facilities)

5 March 29, Monday Cryomodule, Cryogenics Industrialization S1-G Cryomodule assembly statusNorihito Ohuchi S1-G Cavity assembly statusEiji Kako S1-G RF preparationShigeki Fukuda Proposal of experiment schedule of S1-G cryomodule Hitoshi Hayano Cavity test planEiji Kako RF test planShinichiro Michizono Cryomodule thermal test planNorihito Ohuchi Preparation of Industrialization, R&D plan FNAL industrialization study statusBob Kephart India industrialization study statusShekhar Mishra KEK industrialization study statusH. Hayano Status of XFEL module assembly facility at Saclay Olivier Napoly For IPAC indutrialization sessionJim Kerby ( S1-Global experiment )

6 2 nd floor, room 202: Main Linac session


Download ppt "WG3: Main Linac H. Hayano, C. Nantista, C. Pagani."

Similar presentations


Ads by Google