Presentation is loading. Please wait.

Presentation is loading. Please wait.

Global Design Effort - CFS 11-05-08 ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,

Similar presentations


Presentation on theme: "Global Design Effort - CFS 11-05-08 ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,"— Presentation transcript:

1 Global Design Effort - CFS 11-05-08 ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler, J. Osborne, A. Enomoto

2 Global Design Effort - CFS 11-05-08 ILC Global Systems Meeting 2 Report from CLIC 08 Workshop Participated in the Technical Issues, Integration & Cost Working Group Parallel Sessions Participated in the Technical Issues, Integration & Cost Working Group Parallel Sessions Several Very informative Talks on Conventional Facilities Aspects of CLIC Design from CES Group Members Including: Several Very informative Talks on Conventional Facilities Aspects of CLIC Design from CES Group Members Including: – Module Layout and Support – magnet Stabilization ans Test Stands – Tunnel layout and Cross Section – Tunnel Cooling and Ventilation – Module Transport and Installation – Safety Issues for Underground Structures – Common CLIC/ILC Note on Tunnel Safety – Radiation Requirements – Module Alignment – CLIC Project Management – Cost Estimating Tools and Requirements

3 Global Design Effort - CFS 11-05-08 ILC Global Systems Meeting 3 Planning for ILC 08 Agenda for CFS Parallel Sessions has been Finalized and will be Posted This Week Agenda for CFS Parallel Sessions has been Finalized and will be Posted This Week Parallel Session Topics Include: Parallel Session Topics Include: – Process Cooling Water and HVAC Review – Klystron Cluster Design – ILC Collaborative Efforts – Minimum Machine Design – Alternate Site and Tunnel Configuration Room Assignment has been Finalized Room Assignment has been Finalized

4 Global Design Effort - CFS 11-05-08 ILC Global Systems Meeting 4 Planning for ILC/XFEL Collaboration Mtg. Still in Preliminary Stages Still in Preliminary Stages Draft Agenda will be proposed prior to ILC 08 and Finalized in Parallel Session Draft Agenda will be proposed prior to ILC 08 and Finalized in Parallel Session Probable Session Topics: Probable Session Topics: – Construction Management Process – XFEL Tunnel Design – Process Cooling Systems – HVAC Systems – Safety Issues, Fire Hazards and Egress Planning – Cost Estimate vs. Actual Construction Tenders/Cost – Tour of XFEL Tunnel Mock-up Confirmed Attendees, V. Kuchler, T. Lackowski, L. Hammond, J. Osborne, A. Enomoto and M. Ross Confirmed Attendees, V. Kuchler, T. Lackowski, L. Hammond, J. Osborne, A. Enomoto and M. Ross

5 Global Design Effort - CFS 11-05-08 ILC Global Systems Meeting 5 Update on GSPI/Dubna Little Direct Contact with JINR Representatives Little Direct Contact with JINR Representatives Breakdown of Costs has been Provided to E. Elsen and Distributed Breakdown of Costs has been Provided to E. Elsen and Distributed Schedule of Work is Unknown to CFS Group Schedule of Work is Unknown to CFS Group JINR is Scheduled to Provide a Report at ILC 08 JINR is Scheduled to Provide a Report at ILC 08 Still Need More Comprehensive Preliminary Design Work and Cost Estimate Back-up Information Still Need More Comprehensive Preliminary Design Work and Cost Estimate Back-up Information


Download ppt "Global Design Effort - CFS 11-05-08 ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,"

Similar presentations


Ads by Google