RTF Management Update Jennifer Anziano Regional Technical Forum June 16, 2015.

Slides:



Advertisements
Similar presentations
New MT Houses with Ground Source Heat Pumps Energy Savings and Costs June 2 nd, 2009 Regional Technical Forum 1.
Advertisements

Sunset Date Extension: Manufactured Homes HVAC Measures Regional Technical Forum November 18 th, 2014.
SEEM Calibration: Revisited Revising the regression to use continuous heat loss variable Regional Technical Forum December 17, 2013.
Residential Refrigerators and Freezers UES Measure Update Regional Technical Forum October 14, 2014.
Residential Single Family Clothes Washer UES Measure Update Christian Douglass Regional Technical Forum February 18, 2015.
Residential Refrigerators and Freezers UES Measure Update Regional Technical Forum October 14, 2014.
Oregon Energy Star Homes Measure Update New Measure Proposal April 22nd,
UES Measure Sunsets Regional Technical Forum December 17, 2013.
Deeming Savings for Ductless Heat Pumps in Manufactured Homes Regional Technical Forum January 4 th, 2011.
SEEM Tool Overview Regional Technical Forum Member Orientation January 22, 2013.
Residential New Construction Montana House: UES Measure Update Adam Hadley Regional Technical Forum April 14, 2015.
Implementer’s Group April 2015 Meeting Debrief and Upcoming Meeting Prep April 24, 2015.
HPWH UES Measure Initial Review 16 April Agenda Provisional Measure Review Method Overview Prelim Findings Measure Development Approach Simulation.
New Measure Proposal Review and Prioritization Jennifer Anziano, Adam Hadley, Mohit Singh-Chhabra, Christian Douglass Regional Technical Forum February.
Implementer’s Group January Meeting Debrief and Upcoming Meeting Prep January 29, 2015.
RTF Small / Rural Subcommittee Quarterly Meeting Tuesday, April 28, :00 am – 10:30 am 1.
RTF 2015 Mid-Year Progress Report and 2016 Work Plan Jennifer Anziano Regional Technical Forum July 21, 2015.
Residential Single Family HVAC UES Measures Proven and Planning UES Measure Proposals Adam Hadley Regional Technical Forum December 16, 2014.
RTF Staff, Subcommittee and Work Updates October 23, 2012.
Applying SEEM Updates, Calibration, and Measure Interaction Decisions to: Manufactured Homes Weatherization UES Measures Regional Technical Forum June.
RTF Work Plan Mid-Year Re-Programming July 15, 2014.
Sunset Date Extension Requests Jennifer Anziano Regional Technical Forum August 18, 2015.
RTF Management Update Jennifer Anziano Regional Technical Forum April 14, 2015.
Oregon ENERGY STAR Homes Measure Update Adam Hadley Regional Technical Forum March 17, 2015.
Heat Pump Water Heater Request for Feedback on a proposal to add UES measures with a “Retail – any installation location” delivery mechanism Regional Technical.
Implementer’s Group February 2015 Meeting Debrief and Upcoming Meeting Prep February 26, 2015.
RTF Staff, Subcommittee and Work Updates November 1, 2011.
QC Follow-up for Single Family SEEM Calibration, HVAC UES Measures, and Weatherization Measures Adam Hadley Regional Technical Forum May 12, 2015.
RTF Management Update Jennifer Anziano Regional Technical Forum May 12, 2015.
Analysis of Weatherization Measures Options for Savings Methodology and Presentation of Costs from 6 th Plan Regional Technical Forum May 4 th, 2010.
N ETWORK PC P OWER M ANAGEMENT June 28, 2011 Regional Technical Forum Presented by: Bob Tingleff SBW Consulting, Inc.
RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015.
Path for Multi-Family (MF) Weatherization and NC Measures Christian Douglass 8/18/2015.
Applying SEEM Updates, Calibration, and Measure Interaction Decisions to: Single Family Weatherization and HVAC UES Measures Follow-up from August RTF.
RTF Management Items December 16, Contract Analyst Selection Technical Portion of Scope: Hadley Rushton Ptarmigan Research Research and Evaluation:
RTF Management Updates Jennifer Anziano Regional Technical Forum September 22, 2015.
Northwest Power and Conservation Council Residential Conservation Resource Assessment Overview of Analytical Process and Major Assumptions April 21, 2009.
Research Strategy Review: Advanced Power Strips MH HVAC Related Measures Jennifer Anziano RTF R&E Subcommittee August 6, 2015.
Integration Issues for RTF Guidelines: Savings, Lifetimes and Cost/Benefit October 24, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
Implementer’s Group July 2015 RTF Meeting Debrief and Upcoming Meeting Prep July 29, 2015.
Implementer’s Group June 2015 RTF Meeting Debrief and Upcoming Meeting Prep June 23, 2015.
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
Residential New SF Energy Star Homes Idaho and Montana UES Measure Updates: Energy Star Homes, DHP TCO Homes, and BOP2 Homes March 18 th, 2014.
Residential New SF Energy Star Homes UES Measure Update December 17th, 2013.
Implementer’s Group May 2015 Meeting Debrief and Upcoming Meeting Prep May 19, 2015.
PTCS Commissioning, Controls & Sizing Update of UES Measure Category and/or Status Regional Technical Forum July 15, 2014.
RTF Management Updates Jennifer Anziano Regional Technical Forum October 20, 2015.
Working Towards Better Savings Estimates for HVAC and Weatherization Measures Regional Technical Forum September 16, 2014.
RTF Administrative Measure Decisions November 14, 2012.
Applying SEEM Updates, Calibration, and Measure Interaction Decisions to: Manufactured Homes Weatherization UES Measures Regional Technical Forum December.
RTF Management Update Jennifer Anziano Regional Technical Forum August 18, 2015.
RTF Management Updates Jennifer Light Regional Technical Forum December 8, 2015.
RTF Delivery Verification Guidance Batch 2 Jennifer Anziano Regional Technical Forum September 22, 2015.
Idaho and Montana Residential Single Family New Construction Measures Mohit Singh-Chhabra Regional Technical Forum October 20 th, 2015.
D EEMED M EASURE U PDATES May 3, 2011 Regional Technical Forum Presented by: Bob Tingleff SBW Consulting, Inc.
Planning UES Measures: SF New Construction Heat Pump Upgrades (9.0 HSPF and VCHP) Heat Pump Commissioning Controls and Sizing Adam Hadley Regional Technical.
RTF Management Updates Jennifer Light Regional Technical Forum January 21, 2016.
Research and Evaluation Subcommitee – 2014 Plans Regional Technical Forum January 22, 2014.
Planning UES Measures: Prescriptive Duct Sealing SF Performance-based Duct Sealing SF Performance-based Duct Sealing MH Adam Hadley & Josh Rushton Regional.
RTF Management Update Jennifer Anziano Regional Technical Forum July 21, 2015.
Implementer’s Group December Meeting Debrief and Upcoming Meeting Prep January 6, 2015.
RTF Management Update Jennifer Anziano Regional Technical Forum March 17, 2015.
Implementer’s Group October 2015 RTF Meeting Debrief and Upcoming Meeting Prep October 29, 2015.
RTF Management Updates Jennifer Light Regional Technical Forum February 17, 2016.
RTF’s Engagement with Research Jennifer Light RTF Policy Advisory Committee February 19, 2016.
Ductless Heat Pumps (DHP) in Single Family Homes with Zonal Electric Heat UES Measure Update Regional Technical Forum June 17, 2014.
Proven UES: Residential Dishwasher Proposal to Deactivate Jennifer Anziano Regional Technical Forum November 10, 2015.
RTF Delivery Verification Guidance Batch 3 Jennifer Light Regional Technical Forum November 10, 2015.
Manufactured Homes: Heat Pump Related Measures Regional Technical Forum Presentation August 18 th, 2015.
Presentation transcript:

RTF Management Update Jennifer Anziano Regional Technical Forum June 16, 2015

Topics for Today NC ENERGY STAR Multifamily QC Updates – Res Clothes Washer – SF Existing Home HVAC and Weatherization Enhanced RCP Upcoming subcommittee and meeting topics 2

New Construction ENERGY STAR Multifamily Measure Background: In August 2012, the RTF approved the NW ENERGY STAR Multifamily Home UES measure as Proven, Active with a sunset date of October 1, 2017 (or upon substantive change to state energy codes) When entering in database, the sunset date was entered as October 2014 In October 2014, the RTF changed the measure status Under Review and extended the sunset date to August 2015 to give time to pursue new SEEM MF calibration Question: Original intention was to not revisit measure until October 2017 or until a substantive change in the energy codes, yet the RTF will be revisiting the question of MF calibration soon Do we want to keep the existing sunset date, OR correct the error in database by extending sunset date until October 2017? 3

QC Updates – Res Clothes Washers Three errors found during QC 1.RMC in clothes should not have embedded waste water energy associated with it 2.Lifetime was incorrect (14 instead of 14.2) 3.CEE Tier 2 min IMEF was incorrect (2.76 instead of 2.74) Also a cell reference error in the lookup table – Correction does not change results, but does correctly match results to the right measures 4

5 QC Updates – Res Clothes Washers

Another Error Found in Wx & HVAC SEEM Runs #9: Prototype weightings – Rows mixed up between FAF and Zonal Houses. (Thank you to Bob Tingleff for finding this error.) Changed savings for FAF and Zonal measures. HP measures unaffected. – DHP’s Savings fluctuated by 5% or less – Weatherization Electric FAF – Savings fell by an average of 10% – Range: reduction of 24% to reduction of 1% Zonal and DHP – Savings increased by an average of 10% – Range: Reduction of 5% to increase of 30% – Performance-based Duct Sealing for Electric Forced Air Furnaces Savings fell by about 10% Updated measure workbooks are posted to the measure web pages

Changes to Cost-Effectiveness (DHP and Duct Sealing unchanged) Changed for some weatherization measures

Enhanced RCP RTF is about ready to release its annual RCP survey This year we will be seeking measure/end use level data (rather than sector level) – This is the same data provided to the Six Going on Seven project previously Continue to report utility data at the sector level, allowing for a review period 9

Upcoming Meeting Topics Anticipated for July MH HVAC Measure Updates (updated based on calibration) Heat Pump Water Heater (Planning UES – adding a Tier 3) Thermostatic Restriction Valve (new Planning UES) Low-e Storm Windows (new UES) CVR/VO (Under Review SP) Grocery Display Case LEDs (update to proven UES) Delivery Verification (feedback from 30-day review period) 10

Upcoming Meeting Topics (cont) Items on radar for August and beyond Prescriptive Duct Sealing (Planning UES) New Construction MH measures (updating per MH calibration) Behavior SP (Under Review; will start to develop path for this one) Multifamily Weatherization (last OOC measure) Res Advanced Power Strips (Planning UES) Res Heat Pump Upgrades NC (Proven UES update) Also, working on longer term measures, such as: Non-Residential Lighting Code Compliant (new SP) New Homes Standard Protocol (new SP) Guidelines Updates 11