PUBLIC INPUT SESSION OCTOBER 27, 2015 City of Asbury Sun Valley Dr. and Sun Ridge Ct. Reconstruction Project.

Slides:



Advertisements
Similar presentations
Public Informational Meeting North Street Wood Avenue to St Joseph Avenue Plan no Project Nos , , & City of Marshfield,
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
I-96 Reconstruction/Bridge Repair Project City of Livonia and Redford Township Wayne County May 10, 2013 Association of the Council of Western Wayne Yankee.
THE “INs AND OUTs” OF ALLEYS FOR THE CITY OF HOUSTON.
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
2009 Wyoming Street and Utility Improvements Neighborhood Informational Meeting December 18, :00 P.M. – 8:00 P.M. 6:00 P.M. – 8:00 P.M. Mark A. Erichson,
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
SPECIAL ASSESSMENTS JIM WAINWRIGHT AHLERS & COONEY, P.C. 100 Court Avenue, Suite 600 Des Moines, IA April 4, 2014.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
6 th Street Water Main And Street Reconstruction 2013.
City of Bloomfield Hills 2015 Road Improvement Program.
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
CBJ Planning Commission Presentation November 9, 2010 Subdivision Ordinance Revision Update.
CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Planning & Community Development Department Maranatha High School Master Plan City Council Meeting December 15, 2014.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
General Fee Schedule Annual Update Fiscal Year 2014 Finance Committee/City Council June 3, 2013.
Budget Work Session Fiscal Year July 27, 2010.
General Overview of the Functions and Responsibilities Traffic Engineering & Permits Division.
February 24, 2015 First Public Hearing 1.  Workshop proposed ULDC changes: 1/27/15  Request to Advertise: 1/27/15  First Public Hearing: 2/24/15 
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Neighborhood Meeting Falcon, 124 th, Europa, 126 th, Gallivan (Lake Air Estates/Bald Eagle Estates) Improvement Project December 13, 2010.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
3TB Project Review Tax Increment Financing (“TIF”) Overview January 25, 2013.
Annexation 480 CHELSEA ROSE ANNEXATION PUBLIC INFORMATION MEETING AUGUST 11 TH, 2015.
Neighborhood Meeting Falcon, 124 th, Europa, 126 th, Gallivan (Lake Aires Estates/Bald Eagle Estates) Improvement Project October 11, 2010.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
City of Madison Engineering Division Joylynne Drive and Douglas Trail Assessment District-2010 Pflaum Road to Tompkins Drive Joylynne Drive to Herro Lane.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
PUBLIC INPUT SESSION NOVEMBER 10, 2015 City of Asbury Birchwood Drive Reconstruction Project.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
IT’S THE 11 TH HOUR And General Engineering is … HOLDING US UP!
Marquis Hills Area Construction Update Meeting May 5, 2016.
City of Belmont Pavement Reconstruction Project October 15, 2014.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
ANNEXATION Statutory Overview July 19, 2011 David L. Yearout, AICP, CFM.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
City of Johnston East of Merle Hay Road Infrastructure Improvements Council Meeting – NW 55 th Avenue Street Special Assessment February 17, 2015.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
Heritage Park Area Construction Update July 28, 2015
Marquis Hills Area Information Meeting September 13, 2016
2016 Mill and Overlay Project
2nd Street Drainage and Paving Improvements
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
Location Map.
The Oakton Condominium Association September 12, 2017
City of Bloomfield Hills
Springbrook Estates Sewer Improvement Area Informational Meeting
SW Gage Blvd - Street Repair Project
Participatory Road Program neighborhood meeting Donahoo 174th Street
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Meadow Lake Boulevard Street Extension Project
Meadow Lane – Brandon Road Improvements Welcome!
Walker Street Reconstruction Project 25% Design Public Hearing
Harbour Island Force Main Replacement
Robincrest/Elmgate/ Linneman Improvements Welcome!
City of West Fargo special assessment forums
Special assessment Guide
Larimer County: engineering
Presentation transcript:

PUBLIC INPUT SESSION OCTOBER 27, 2015 City of Asbury Sun Valley Dr. and Sun Ridge Ct. Reconstruction Project

Agenda Introduction Project Overview Burr Oak Reconstruction Easements Assessment Policy Steps of a Special Assessment Funding Q&A and FAQs

Project Overview

Sun Valley Drive

Sun Ridge Court

Project Overview Reconstruct both Sun Valley Drive between Whitetail and Springreen and Sun Ridge Court to current City standards for residential roadways – 31’ wide with curb & gutter 4’ sidewalks along both sides of the new roadway with 4’ of grass between sidewalk and roadway Replace water main, storm sewer and rehab or replace sanitary sewer depending condition

BEFORE Narrow road, barely provided enough room for two-way traffic, deteriorating quickly due to the poor subgrade upon which the existing roadway was built Burr Oak Reconstruction

AFTER A quality asphalt paved roadway built on a sturdy stone subbase Added curb-and-gutter, storm inlets and created roadway profile and cross-section to manage runoff Sidewalks provide easy, safe access to the public park and ball diamond Burr Oak Reconstruction

Easements Permanent  Very limited permanent easements may be necessary for storm water inlets, piping and outfalls Temporary  Some properties will require temporary construction easements for grading mowable slopes and patching driveways

Assessment Policy Adopted in 2006, amended 2007 to address retaining walls and fences amended 2013 for sidewalks and 2015 for assessment for street construction more than once in a five year period. 100 % of the cost of storm sewers and street lights are paid by City. 25% of the cost of a 31’ residential street is assessed to the property owner and 75% is paid by the City. Sidewalks costs assessed not to exceed 50% for residential and collector roadways.

Assessment Policy If a 3:1 slope cannot be constructed without impacting an existing structure then 100% of the cost of retaining walls and fences is paid by City. If a property owner does not grant a temporary easement, then drastic slope to limit disturbance to right-of-way or 100% of the cost of necessary retaining walls will be assessed to property owner. 25% of the cost of the water main and 100% of the water services lateral cost may be assessed to the property owner. Water main reconstruction Projects that are not in conformance with City Code. The City shall pay 100% of the cost of reconstruction of the public water main less than 6” in diameter that is in service as of the date Resolution is approved.

Assessment Policy If a property owner is assessed for street reconstruction more than once in a five year period, then the property owner may receive an abatement of only the street reconstruction as follows:  1-2 years20% of street reconstruction  2-3 Years15% of street reconstruction  Zero to 1 Year25% of street reconstruction  3-4 Years10% of street reconstruction  4-5 Years 5% of street reconstruction  Greater Than 5 Years No Reduction

Sequence of Events in a Special Assessment 1. Informational Meeting with property owners to gather background and provide schedule for project process (November 13, 2014) 2. City Council to adopt “Preliminary Resolution” containing: description of project location of project direct Engineer to prepare preliminary plans and specifications general description of property to be benefited 3. Prepare Preliminary Special Assessment Plat and Schedule (October 12, 2015) 4. City Council to walk project corridor and review impact and benefit to individual properties. (October 12, 2015)

Sequence (Continued) 5. Prepare and introduce proposed Resolution of Necessity. Public Hearing date to be set on November 10, Clerk notifies affected property of public hearing regarding Resolution of Necessity and Preliminary Assessment Values. (following public hearing) 7. Hold public hearing, Council to adopt or amend and adopt Resolution of Necessity. (December 8, 2015) 8. Engineer to prepare Final Plans, Specifications, Estimate of Cost and Notice to Bidders. (January 2016)

Sequence (continued) 9. Council sets date of public hearing regarding Plans, Specification and Estimate of Cost 10. Hold public hearing regarding Plans, Specification and Estimate of Cost 11. Open bids 12. Council awards project 13. Contractor completes project 14. Engineer inspects and certifies project 15. Council accepts work

Sequence (continued) Engineer prepares Final Assessment Schedule 16. Council to fix and adopt Final Assessment Values and set interest rate for unpaid assessments 17. Clerk notifies affected property owners regarding Final Assessment Value 18. Property Owners have 30 days to pay assessment in full or in part without interest 19. Unpaid assessments are added to the County Treasurer property tax rolls and 1/10 of the assessment are due to be paid plus interest annually for 10 years on the same schedule as property taxes with all delinquent interest and penalties as ordinary taxes

Frequently Asked Questions

FREQUENTLY ASKED QUESTIONS TREE/LANDSCAPING REMOVAL – WILL MY TREE STAY OR WILL IT REQUIRE REMOVAL? ANSWER - SOME TREES WILL HAVE TO BE REMOVED. THE PROJECT DESIGN WILL INCLUDE PROVISIONS FOR SIDEWALK (4 FT BOULEVARD & 4 FT SIDEWALK). BASED ON CURRENT CURB LOCATIONS, TREES AND OTHER OBJECTS WITHIN THE ROW (9.5 FEET BEHIND THE EXISTING CURB) WILL REQUIRE REMOVAL. A LIMITED NUMBER OF TREES THAT ARE OUTSIDE OF THE ROW CURB MAY REQUIRE REMOVAL AS WELL, DEPENDING ON THE MAGNITUDE OF CHANGE FROM EXISTING TO PROPOSED FINSH GRADES.

FREQUENTLY ASKED QUESTIONS ANSWER – MANY RESIDENTS ALONG SUN VALLEY DRIVE AND SUN RIDGE COURT CURRENTLY HAVE PLASTIC OR NON-COMPLIANT WATER SERVICE LINES. RESIDENTS WILL BE ASSESSED FOR REPLACEMENT OF ALL NON- COMPLIANT SERVICES TO THE ROW. RESIDENTS WILL HAVE THE OPTION DURING CONSTRUCTION TO REPLACE WATER SERVICE LINES BETWEEN THE ROW AND THEIR HOMES, WHEN APPROPRIATE, AT A COST TO BE NEGOTIATED WITH THE CONTRACTOR OR PRIVATE PLUMBER AT THAT TIME. WATER SERVICE INSTALLATION – WILL I BE REQUIRED TO INSTALL A NEW WATER SERVICE LINE?

SPECIAL ASSESSMENT POLICY – WATER LATERALS A. Private Laterals. a. The property owner shall pay 100% of all costs associated with the construction of the private lateral from the dwelling to the curb stop located at or near the right-of-way (ROW). b. The property owner shall pay 100% of all costs associated with the construction of the private lateral from the right of way to the connection at the water main.

ACCESS DURING CONSTRUCTION – WILL I HAVE VEHICLE ACCESS TO MY HOME AT ALL TIMES, AND IF NOT, HOW LONG WILL I BE WITHOUT ACCESS AND WHERE SHOULD I PARK? ALL RESIDENTS WILL LOSE VEHICLE ACCESS TO THEIR DRIVEWAY AT VARIOUS TIMES DURING THE CONSTRUCTION PROCESS. THE MOST COMMON TIMES BEING DURING ROADWAY CORE OUT, PAVING, AND DRIVEWAY PLACEMENT. DURING CORE OUT, VEHICLE ACCESS IS TYPICALLY UNAVAILABLE FOR A RANGE OF A FEW HOURS TO A DAY. PAVING OFTEN LEAVES RESIDENTS WITHOUT DRIVEWAY ACCESS FOR UP TO 4 – 7 DAYS WITH CONCRETE, AND 1-2 DAYS WITH ASPHALT. DRIVEWAYS OFTEN REQUIRE THE SAME DURATION. PARKING IN ALTERNATIVE LOCATIONS WILL BE REQUIRED DURING THE CORE OUT AND PAVING PROCESSES. LOCATIONS WILL BE DETERMINED AS THE CONSTRUCTION PROGRESSES, AND DIRECTIONS FOR PARKING WILL BE PROVIDED TO RESIDENTS IN A TIMELY MANNER. OFTEN TIMES RESIDENTS ARE ABLE TO PARK ON THE STREET DURING THE DRIVEWAY PLACEMENT, WHEN THIS IS NOT POSSIBLE, AN ALTERNATIVE PARKING LOCATION WILL BE DETERMINED. FREQUENTLY ASKED QUESTIONS

MAIL DELIVERY AND TRASH PICKUP – HOW WILL I GET MY MAIL DURING CONSTRUCTION, AND WHAT SHOULD I DO WITH MY TRASH? AT THE BEGINNING OF THE CONSTRUCTION PROCESS, THE CONTRACTOR WILL BE REQUIRED TO RE-LOCATE RESIDENT’S MAILBOXES TO A LOCATION NEAR THE PROJECT SITE THAT CAN BE ACCESSED BY THE MAIL CARRIER. RESIDENTS WILL BE INFORMED OF THIS LOCATION IN A TIMELY MANNER. THE PROJECT CONTRACTOR WILL BE RESPONSIBLE FOR TRASH REMOVAL SHOULD THE TRASH COLLECTION ENTITY NOT HAVE ACCESS TO PLANNED COLLECTION POINTS. RESIDENTS WILL NOT BE REQUIRED TO CHANGE THEIR NORMAL ROUTINE FOR TRASH COLLECTION.

FREQUENTLY ASKED QUESTIONS WHAT TIME WILL CONSTRUCTION BEGIN IN THE MORNING, AND WHEN WILL THE CONTRACTOR END WORK FOR THE DAY? CONSTRUCTION HOURS WILL BE THE SAME AS NORMAL WORKING HOURS, WITH A FEW EXCEPTIONS. DURING THE PAVING PROCESS, WORKING HOURS ARE OFTEN LONGER AS THE CONTRACTOR BEGINS EARLY IN THE MORNING AND ENDS LATER AT NIGHT. WITH CONCRETE PAVING, JOINTS ARE OFTEN SAWED IN THE LATE HOURS OF THE EVENING. THE SAWING PROCESS MUST BE COMPLETED WITHIN A CERTAIN TIMEFRAME, AS UNCONTROLLED CRACKING OF THE PAVEMENT MAY OCCUR. IT IS SOMETIMES NECESSARY FOR CONTRACTORS TO WORK ON WEEKENDS AND POSSIBLY HOLIDAYS DEPENDING ON THE WEATHER DURING CONSTRUCTION.

FREQUENTLY ASKED QUESTIONS DRIVEWAY ADDITIONS/SIDE PROJECTS – I MIGHT LIKE TO REPAIR SOME OF MY DAMAGED DRIVEWAY, BUT IT IS NOT WITHIN THE PROJECT BOUNDARIES. CAN THE CONTRACTOR DO THIS FOR ME? OFTEN TIMES RESIDENTS DECIDE TO REPAIR OR ADD ON TO THEIR DRIVEWAYS DURING CONSTRUCTION. THIS IS A GREAT TIME TO MAKE REPAIRS, AS THE CONTRACTOR IS ALREADY ON SITE. IF RESIDENTS WOULD BE INTERESTED IN CONCRETE/ASPHALT REPAIRS OR ADDITIONS THEY SHOULD CONTACT THE MSA FIELD ENGINEER WHO WILL BE ONSITE DURING CONSTRUCTION. THE ENGINEER WILL COMMUNICATE THE RESIDENT’S PLAN TO THE CONTRACTOR, WHO WILL THEN PROVIDE A QUOTE FOR THE COST OF THE WORK TO THE RESIDENT.

THANK YOU Q & A