High Speed 2 The decision and next steps. Background As per the Coalition commitment, the Government developed a proposed strategy for a high speed rail.

Slides:



Advertisements
Similar presentations
Using High Speed Rail to Achieve Connectivity and Integration Prof Andrew McNaughton.
Advertisements

CityCo, Piccadilly Hoteliers Forum
High Speed Two: Engine for Growth Peter Fry Public Affairs Manager – HS2 Ltd.
RTS Re-fresh North East Transport Consultative Forum Tuesday 30th October 2012.
HS2 – Ecclesfield Parish Council – 19 November 2013 Rachael Blake and David Orr-Ewing HS2 Ltd.
The independent campaign for a better bigger railway.
HS2 and Airports Peter Fry, Public Affairs Manager HS2 Ltd CIC Economic & Policy Forum 17 Feb
Priorities for Rail Investment in the East Midlands Andrew Pritchard Director of Policy & Infrastructure February 2012.
SCALES OF PLANNING MARTIN SIMMONS (TCPA) RSA Research Network Governing Metropolitan Regions within a Localist Agenda University of Westminster, 21 September.
1West of England Area Rail Studies - David Crockett 08/02/2012 West of England Area Rail Studies Outline Summary This presentation summarises the work.
MTF Rail Development Forum
HIGH SPEED UK..connecting the nation Colin Elliff BSc CEng MICE Civil Engineering Principal, HSUK
HS2 A National Strategy for High Speed Rail Prof Andrew McNaughton.
Is the expenditure on the ‘HS2’ rail route to Birmingham justified? To see more of our products visit our website at Mark Evetts, Cheltenham.
Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2.
SNH PERSPECTIVE ON PLANNING AND THE ENVIRONMENT Derek Manson Planning Adviser.
Presentation to the Executive of the Carlisle Partnership 13 July 2009.
High Speed 2 The decision and next steps Jonathan Mitchell.
High Speed Rail for Nottingham Nottingham City Council June /9/20151.
25th November 2014 PTRC London 1 Jim Steer Director Greengauge 21 Director HSR Industry Leaders HS2 – more than a railway HS2: Building in the benefits.
 A high speed rail link from London to Yorkshire  Phase 1 is from London to Birmingham  Phase 2 is to Manchester and Leeds  The Institute of Economic.
Rail and the West Midlands Economy EMTA Conference Birmingham, 11/11/11 Peter Sargant Head of Rail Development, Centro.
HS2 Steve Rodrick Chief Officer. Preferred Route The Misbourne Valley.
TRANSPORT INNOVATION FUND Stephen McFarlane Regional & Local Transport Delivery - DfT.
 Scotland’s National Transport Strategy A Consultation.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
Strategic Priorities of the NWE INTERREG IVB Programme Harry Knottley, UK representative in the International Working Party Lille, 5th March 2007.
West Anglia Rail Services Hertfordshire County Council Scrutiny Panel 20 May 2010 Geraint Hughes Stakeholder Manager.
CHESHIRE & WARRINGTON SUBREGIONAL TRANSPORT STRATEGY Delivering & Sustaining a £35bn Economy.
1 Northern Hub – the business case Duncan Law 26 June 2012.
Transport Update Chris Carter Transport Strategy Manager.
National Planning Framework 3 Planning and Architecture Division.
Planning for the future of our district Core strategy options Presentation to C4B Associates February 2010.
The Regional Transport Strategy Transport for Regional Growth Conference Edinburgh 5 November 2015 John Saunders SEStran.
9th November 2010 ICEA 1 Jim Steer Director, Greengauge 21 Director, Steer Davies Gleave ICEA 9 th November 2010 The case for High Speed Two (and three.
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
Salford Core Strategy Eccles Political Executive Briefing 14 November 2008.
An area of significant change and identified as: Placeshaping in West Hampstead Area of Intensification in the London Plan Work completed and underway:
UK Working Group: Territorial Cohesion. Territorial Description: London.
Gerald Jennings President Leeds Chamber of Commerce 18 th February 2016 HS2 Leeds The right place for the station in Leeds.
Nottingham Workplace Parking Levy Sue Flack Director for Planning and Transport.
April 2016 HSR Workshop York 1 Jim Steer Director Greengauge 21 HS2 Objectives “what are the economic, operational (especially capacity and connectivity)
The Natural Capital City – a blueprint for the future? Ecobuild 2014 The Natural Capital City Tool (NCCT) Oliver Hölzinger Consultancy for Environmental.
HIGH SPEED UK..connecting the nation Colin Elliff BSc CEng MICE Civil Engineering Principal, HSUK  Quentin Macdonald BSc(Eng) CEng MIET FIRSE.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
November 30 th London/Spain Webminar: Railway Infrastructure in the UK Spanish construction and railway industry 1 Jim Steer Director & Founder, Steer.
High Speed Two Ltd responsible for developing and promoting the UK’s new high speed rail network
Andrew Pritchard Director of Policy & Infrastructure East Midlands Councils 24 TH FEBRUARY 2016.
HS2 in the East Midlands Stephen McFarlane HS2 Ltd Greater Nottingham Transport Partnership Forum 24th February 2016.
PowerPoint Title Sub heading if required Northern Powerhouse Rail Freight meeting 17 th May 2016.
Scotland Route Utilisation Strategy. Slide 2 What is a RUS? A blueprint for the future of the route  Provides a series of options that funders may choose.
March 2016 Helen Smith Freight in the City Greater Manchester Logistics & Environment.
Invest in Renfrewshire Partnership Conference on Employment & Economic Development 16 June 2016 City Deal and our Role in the Regional Economy Mary Crearie.
Maria Machancoses Programme Director
High Speed Rail Some Development Principles
West of England Joint Transport Study
A Position Statement 14th October 2016
HS2 - What tests should be applied in evaluating the final business case ? Chris Nash.
The Freight RUS - a draft for consultation
Midlands Connect: A Pan Midlands Strategic Transport Partnership
Initial Strategic Business Plan July 2006
A future benefit for the South Cheshire infrastructure
Regeneration - Enquiry Question 3
A future benefit for the South Cheshire infrastructure
Connecting the South East
New Public Transport Infrastructure
Why build this new link to Heathrow?
Presentation to LEP Performance and Investment Committee 16 May 2018
KEYNOTE STAGE SPONSOR.
Life Cycle Costing.
Presentation transcript:

High Speed 2 The decision and next steps

Background As per the Coalition commitment, the Government developed a proposed strategy for a high speed rail network in the UK Ran a 5 month public consultation process which closed at end July 2011, and extensive public engagement 41 days of road shows along the proposed London to West Midlands line of route 7 regional seminars across the UK Consultation received almost 55,000 responses Select Committee inquiry – generally supportive of the Government’s proposals for HS2

The need for HS2 Capacity Britain’s railways are becoming more and more crowded, and the demand for rail travel, will continue to grow. We need to provide for this demand to support the needs of the public. A combination of new high speed lines and released capacity on the current network can support growth across all key markets – long distance, commuter, regional and freight. Growth The economic geography of the UK needs to change to address the wealth divide in the UK. Major cities other than London need to be able to operate competitively as unique markets on a global stage. Carbon Rail is comparatively less carbon intensive as road and air travel. We need to encourage modal shift onto rail if we are going to meet our targets.

The decisions National high speed rail network linking London, Birmingham, Manchester and Leeds, with stops in the East Midlands and Sheffield, and direct links to HS1 and Heathrow Deliver network in phases: phase 1 links London and the West Midlands, and phase 2 extends the lines to Manchester and Leeds, with a spur to Heathrow The network will link into the existing East and West Coast main lines to serve places not on the HS2 network through ‘classic compatible’ running, including Scotland The route corridor proposed in the consultation for the London to West Midlands line is the right one – but we have tweaked detail of the route in light of consultation responses to further reduce its impacts

The line of route We have made changes to the consulted route which have significantly enhanced sustainability: Moved the line further from Middleton Shallower cutting and more green tunnelling at Burton Green Mitigation of impacts at Balsall Common Route moved slightly further east to avoid Kenilworth Golf Club, lowered into cutting through the National Agriculture Centre, and introduced a retained cutting through South Cubbington Wood (ancient woodland) Longer green tunnel past Chipping Warden and Aston le Walls, and route curved to avoid heritage sites at Edgcote Lower alignment and introduce green tunnel past Greatworth, and short green tunnel at Turweston Altering alignment to take it further from Twyford Lower alignment past Aylesbury and Stoke Mandeville Longer green tunnel at Wendover and an extension to the green tunnel at South Heath Longer, continuous tunnel from Little Missenden to the M25 through the Chilterns AONB Introduce a 2.75 mile bored tunnel along the Northolt corridor Increase the clearance over the Trent and Mersey Canal near Lichfield Introduce a longer bored tunnel at Long Itchingham Wood Benefits of changes Less than 2 miles of line at surface level through the Chilterns AONB – more than half of the line would be in tunnel or cutting 170 fewer properties at risk of demolition – almost half that of the consulted route 1600 fewer properties would experience noticeable noise - around a third less than the consulted route Significantly reduced impacts on heritage sites, and on ancient woodlands

Next Steps

Property and Blight Further consultation on property blight proposals in spring 2012, and a decision on the final deal will be agreed later in London to West Midlands HS2 Ltd will be working with those communities affected by the line in order to consider local views and discuss proposals to inform the Environmental Impact Assessment. This includes a national environmental forum, planning framework forums, and community forums. Manchester and Leeds legs March 2012 HS2 Ltd preparing advice on proposed routes north of Birmingham Autumn 2012 DfT to publish preferred routes Engagement on Y leg proposals 2014 Public consultation We need to start thinking about how HS2 and wider city and spatial planning work together – both for the London to West Midlands line, and the Y legs. Engagement

Questions