Nov, 30 2006F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.

Slides:



Advertisements
Similar presentations
AB / CO Review1 PS Complex Software for 2006 PS Complex Operation Teams & S. Pasinelli.
Advertisements

FESA 3 Implementation Status Stephane Deghaye BE/CO On behalf of the FESA team and many users.
WG on possible controls restructuring 1 Controls activities of the AB equipment groups A. Butterworth E. Carlier, R. Losito, A. Masi, JJ. Gras, Q. King.
FESA Vs 2.0 AB/CO TC - 12 Feb July 2004 FECOMSA FESA2 2.0β.
LabVIEW Basic I with RADE introduction A. Raimondo (EN/ICE)
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Rapid Application Development Environment based on LabVIEW A. Raimondo (AB/CO) ATC/ABOC Days, January 2008.
Chapter 9 – Software Evolution and Maintenance
Controls renovation WorkshopFE Software 1 Front-end software C.H.Sicard.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
Controls Renovation for AB-BI Outline: Reminder of AB-BI-SW mandate History of controls renovation Renovation work-packages (-> 2012) – Projects known.
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Timing upgrades after LS1 Jean-Claude BAU BE-CO-HT1.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
Stephane Deghaye (AB/CO) ATC/ABOC days.
Access zones and Training Steve Hutchins BE-ASR IEFC workshop 7/3/2012.
Draft for approval in ABMB, 4 Feb 08 Andy Butterworth Claude-Henri Sicard for the Controls Coordination Committee (CO3) 22 Jan 20081ATC/ABOC Days.
Application Development for Operations in the Coming Years Mike Lamont.
Controls for RF equipment AB/CO Review 22/9/2005 Andy Butterworth on behalf of AB/RF.
Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE  Questions? RADE Applications EN-ICE-MTA.
Controls renovation workshop Standardized Hardware Modules Javier Serrano, AB-CO-HT MJD
Systems Analysis and Design in a Changing World, 6th Edition
CERN Control Standards Front-End Computer Layer Stéphane Deghaye BE/CO/FE
25/01/2001 PS days - Evian Application software Status and trends Marine Pace Marine Pace.
CERN Raul Murillo Garcia BE-CO LS1 review – TE-EPC feedback BE-CO LS1 review TE-EPC feedback Raul Murillo Garcia on behalf of TE-EPC Daniel Calcoen Stephen.
FESA FRONT-END SOFTWARE ARCHITECTURE [FESA] Michel Arruat, Leandro Fernandez, Stephen Jackson, Frank Locci, Jean-Luc Nougaret, Maciej Peryt, Anastasiya.
Review of MPE activities during LS1 and outlook for LS2/LS3 View from BE/CO V.Baggiolini, M.Vanden Eynden On behalf of the BE/CO APS, DA, DO and FE Sections.
26 Jan 06Marine Pace - AB/CO1 LEIR Controls : Gain of Experience for the Running-in of LHC Marine Pace on behalf of AB/CO and LSA.
1 Object-Oriented Analysis and Design with the Unified Process Figure 13-1 Implementation discipline activities.
Jan 23rd, 2008M.Vanden Eynden on behalf of the AB-CO Group1 AB-CO MTTR & Spare Part Policy for the LHC Injectors, Experimental Areas & other Facilities.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
BE-CO Presentation FESA and O/S Support Post-ACCOR renovations until LS2 Front-End Platforms BE-BI TB, May 21 st, 2015 M.Vanden Eynden on behalf of BE-CO.
Feedbacks from EN/STI A. Masi On behalf of EN-STI Mathieu Donze` Odd Oyvind Andreassen Adriaan Rijllart Paul Peronnard Salvatore Danzeca Mario Di Castro.
POST-ACCOR renovations until LS2 – DEBRIEFING – Marine Pace, CO3 – 17 September 2015 Input from Chris, Marc, Stephen, Stephane, Wojtek.
The ACCOR Project Status Report and Outlook for 2010 and beyond M.Vanden Eynden on behalf of the ACCOR Project Team 1M.Vanden Eynden (BE/CO) - IEFC Workshop,
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
22/09/05CO Review: FESA IssuesJJ Gras [AB-BDI-SW] 1/18 AB-CO Review FESA  The Functionality  The Tools  The Documentation  The Support  Maintenance.
Standby Services or Reliance on Experts for Accelerator control? Claude-Henri Sicard AB/CO ATC/ABOC Days 2007.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
Stephane Deghaye (AB/CO) The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop Motivations & Objectives.
– Machine Controls Coordinators (MCC): team and role – Overview of renovations during LS1 – Proposal for after-LS1 Commissioning organization ACCOR PROJECT.
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS implementation in ISOLDE Sebastien Blanchard TE/VSC Interlocks, Controls.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.
Proposal: Use of ECRs for “Controls” Changes and Renovations Rende Steerenberg, Samy Chemli, Marine Gourber-Pace, Klaus Hanke, Verena Kain, Bettina Mikulec,
The OP Viewpoint on the Accelerator Complex Controls Renovation R. Steerenberg on behalf of the OP group Accelerator Complex Controls Renovation Workshop.
Industrial Control Engineering Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE 
Software tools for digital LLRF system integration at CERN 04/11/2015 LLRF15, Software tools2 Andy Butterworth Tom Levens, Andrey Pashnin, Anthony Rey.
ADE Alessandro Raimondo (ICE/MTA) ICE workshop, 23 th April 2009.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
H2LC The Hitchhiker's guide to LSA Core Rule #1 Don’t panic.
LS1 Review BE-CO-SRC Section Contributions from: A.Radeva, J.C Bau, J.Betz, S.Deghaye, A.Dworak, F.Hoguin, S.Jensen, I.Koszar, J.Lauener, F.Locci, W.Sliwinski,
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
AB-CO Review Controls for BDI
FGClite Feedback from BE-CO & SUWG(Smooth Upgrades)
V4.
Accelerator Controls Renovation Project “ACCOR”
Controls & software Andy Butterworth.
Status and Plans for InCA
The Development Process of Web Applications
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
Presentation transcript:

Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end proposal presented at CO3 on Nov 2, 2006

Nov, F. Di Maio, M.Vanden Eynden2 Contents Foreword CO proposal for FE Software PS FE software Inventory Evolution

Nov, F. Di Maio, M.Vanden Eynden3 Foreword Four aspects to CO3 concerning Front-ends responsibilities FE Software (this presentation) FE Hardware (in progress …) FE Configuration Management (not started) FE First-line Responsibility (not started) A clarification towards a department wide strategy rather than a “Big Bang”

Nov, F. Di Maio, M.Vanden Eynden4 CO Proposal for FE Software CO Responsibility System Level SW O/S definition, installation, support and evolution (LynxOS and LINUX SLC-x) Device drivers and libraries for the list (to be CO3 …) of standard/generic HW modules (CTR-x, GFAs, DAC, ADCs, MIL-1553, WorldFIP, RS-232 line drivers, OASIS boards, etc) Clear commitment from CO to keep strong homogeneity and to offer a complete and well supported set of generic FE controls solutions

Nov, F. Di Maio, M.Vanden Eynden5 CO Proposal for FE Software CO Responsibility FESA Framework Specification, design, release (up to 3/year) and support of the framework, with full CO3 level Strong support to developers during all development phases Training: regular tutorials and hands-on for new developers Design and coding: advice on implementation issues Commissioning and quality insurance: code reviews, correct framework usage, etc (non-mandatory) Operation: strong diagnostic tools and on-line support during normal working hours Strong commitment from CO to develop and offer extended support for FESA, as the agreed AB department front-end solution

Nov, F. Di Maio, M.Vanden Eynden6 CO Proposal for FE Software CO Responsibility FESA Software Software for the support of the list of standard/generic HW modules Projects under full CO responsibility (BIC, OASIS) Legacy GM Software Classes under PS/CO responsibility only Maintenance limited to corrections and adaptation (environment changes), no evolution. Deployment of new instances CO remains responsible for the development and support of a significant amount of generic and project-based Front-end software

Nov, F. Di Maio, M.Vanden Eynden7 CO Proposal for FE Software Equipment Groups Responsibility FESA Software Develop software for the support of their specific hardware and instruments Decide, in agreement with AB-OP, about the operational deployment of their software Use CO support during all phases of development Legacy GM Software Replace with new FESA software when required (cf. next slides) Equipment groups are responsible for the development and operation of their front-end software

Nov, F. Di Maio, M.Vanden Eynden8 PS Front-end Software Inventory Source is the configuration DB Each class: A description A creator (the initial author) An “ABGroup”: the group in charge of the equipment. To be updated All instances (FEC, accelerator) Note: GM adaptor classes can be identified

Nov, F. Di Maio, M.Vanden Eynden9 PS Front-end Software Inventory An excel file (here) with the ABGroup field initializedhere To be checked and updated by the groups Once done → configuration DB

Nov, F. Di Maio, M.Vanden Eynden10 PS Front-end Software Inventory Number of FECs LIN PSB LN3 LEI CPS SPS ADE ISO CTF ABGroupClassNameCreatorDescription 1 ABPPSRCE-VW. HEINZE Control of PS proton source with the CAN bus 1 ATBACTADU.RAICH Acceptance< measurement AD SATBBEAMSTF.BERLIN Reads status of beam stoppers 1ATBCGUNL.MERARDCTF control du gun Clio 2 ATBGASPL.MERARDIsolde gas control via PLC 1 ATBINTDUMPU. RAICHPs internal dumps 1 ATBISOMOVEPL.MERARD Concrete PLC-controlled movep device at Isolde “Shared” (more than one accelerator) Group in charge of the equipment Changes from the DB

Nov, F. Di Maio, M.Vanden Eynden11 PS Front-end Software Inventory ABP1 ATB12 BI32 BT3 CO44 OP3 PO7 RF16 AT-VAC7 Total125

Nov, F. Di Maio, M.Vanden Eynden12 PS Front-end Software Inventory LINPSBLN3LEICPSADEISOCTF GM GM specific FESA “specific” classes: only on one accelerator GM+FESA in the period Remark: figures not corrected by removing FESA GM adapter classes

Nov, F. Di Maio, M.Vanden Eynden13 PS Front-end Software Evolution Phase I GM->FESA when: New equipment New interface New software required (problems or extension planned)  Renovate equipment and interfaces  Reverse the balance GM/FESA Phase II  Homogenize / accelerator  Suppress GM I II ?

Nov, F. Di Maio, M.Vanden Eynden14 PS Front-end Software Evolution Transition I → II to be defined Phase I : new FESA classes Phase II : GM-> FESA migration FTE / FESA class with temporary staff (experience in BI & CO) Number of FESA classes is not the current number of GM classes

Nov, F. Di Maio, M.Vanden Eynden15 Conclusion A practical proposal (clarification) for Front-End software responsibility and support An inventory of the PS Front-End software and its possible evolutions Feedback from each equipment group (CO3) is the next step towards a global agreement, especially concerning the PS complex Next aspects to address: Front-End Hardware Front-End configuration management Front-End first-line of responsibility