03-12-2008 Stephane Deghaye (AB/CO). 03-12-2008 2 The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop Motivations & Objectives.

Similar presentations


Presentation on theme: "03-12-2008 Stephane Deghaye (AB/CO). 03-12-2008 2 The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop Motivations & Objectives."— Presentation transcript:

1 03-12-2008 Stephane Deghaye (AB/CO)

2 03-12-2008 2 The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop Motivations & Objectives Scope Planning Work Packages Human Resources & Budget Summary Conclusions

3 03-12-2008 Reduce effort duplication Homogenise the solutions deployed across the accelerator complex. Reduce the number of specific applications needed by providing high-level services. Reduce maintenance cost Suppress remaining 30+ X-Motif applications Renovate & redefine some (obscure) PS specific parts. Improve Controls system performance Tackle the performance, scalability and reliability problems experienced in the PS complex. Provide sound technical solutions to common problems badly handle due to architecture limitations. 3 The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop

4 03-12-2008 All accelerators except LHC. SPS only for some components (Timing) Most of the CO high-level software components Generic/specific applications General services (control, acquisition and configuration) Data model and data access Timing (aiming at a complete integration) Some low-level components (to ensure vertical coherency) FESA framework services and class guidelines CMW services 4 The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop

5 03-12-2008 5 The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop First two phases completed  Architecture validated during several MDs Release 1.0 with minimal set of feature end of summer 09 (or end of the 09 run). Version 1.0 not to replace existing system (reduced functionality) Transition phase from mid 2010 (early estimation)

6 03-12-2008 6 The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop

7 03-12-2008 7 The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop

8 03-12-2008 8 The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop

9 03-12-2008 9 The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop

10 03-12-2008 10 The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop

11 03-12-2008 11 The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop

12 03-12-2008 2008200920102011 FTEkCHFFTEkCHFFTEkCHFFTEkCHF Application4.71456.52006.52103.572 Data model1.60 0 0 0 Timing0.90 0 0 0 FESA0.30 0 0 0 Com. & Infra0.2100.2200.2200.220 TOTAL CO7.71559.52209.52306.592 Documented in APT from 2008 to 2011 Doesn’t take into account the OP effort for: Domain expert (+/- 0.5 FTE) System configuration (+/- 0.5 FTE) Specific application development (+/- 6 FTEs available) 12 The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop

13 03-12-2008 13 The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop Project well on the way (Architecture validated) Homogenise the high-level control system across the accelerators while keeping the specific ways of operating +/- 9 FTEs & 200 kCHF per year needed over 4 years

14 03-12-2008 Thank you for your attention! 14 The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop


Download ppt "03-12-2008 Stephane Deghaye (AB/CO). 03-12-2008 2 The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop Motivations & Objectives."