Civil Air Patrol Command Council Meeting 1-2 March 2013 Arlington, VA.

Slides:



Advertisements
Similar presentations
United States of America (USA) Plans for ADS-B Briefing for Seminar on Implementation of Data Link and SATCOM Communications November 2003 Bangkok,
Advertisements

Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
1 Northeast Corridor Cost Benefit Assessment Status Mark Kipperman SAIC July 14, 2003.
NextGen GA Fund, LLC A Fund to Accelerate NextGen Equipage Benefits for the General Aviation Operator Community.
Automatic Dependent Surveillance – Broadcast (ADS-B) What is it, and how can it help improve operations in Micronesia? Captain Rocky Stone Chief Surveillance.
Federal Aviation Administration Presented to: Network Centric Demonstrations and Prototypes Technical Interchange By: Deborah Young Date: November 4, 2009.
1st ASAS-Thematic Network 2 Workshop Malmoe 26th-28 th September 2005 “Implementation planning and future packages” Session Moderator: Giorgio MATRELLA.
Federal Aviation Administration Next Generation Air Transportation System (NextGen) Briefing to COMSTAC Kelvin Coleman May 16, 2008.
ADS-B What is it? What it means to us 1. ADS-B aka Shooting at a moving target 2.
Federal Aviation Administration Navigation Services Overview Briefing to Air Traffic Management Bureau of the Civil Aviation Administration of China (CAAC)
Delivering NextGen June 5, 2015 Maryland Airport Managers Association Presented by Carmine Gallo, Eastern Regional Administrator Federal Aviation Administration.
Develop a lightweight system that will accommodate most aircraft to: Reduce Runway Incursions Increase Safety Enhance situational awareness Alleviate.
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
EDEP as Tool for ADS-B Validation eDEP User Group, 9 June 2008 Leo van der Hoorn, CASCADE Programme.
Future of Surveillance in the National Airspace System
Traffic Alert and Collision Avoidance System TCAS
ENJJPT SC #68 T-6A Programs Mr. Patrick Frye AFLCMC/WLZ (JPATS) Air Vehicle Lead (Deputy) XX September 2014.
ADS-B Update As of 6 April 2015 EAA Chapter 1457.
B.PRADHAN,IAS CVO,AAI. Structure of Presentation  Background  Why need Next Gen ATS  What is Next Gen ATS  Benefits of Next Gen Systems  Conclusion.
CNS/ATM Overview Aramco 4/21/2017 1:46 AM
Peter Cassidy May 15,  When to equip?  How to equip?
The Narrowband Transition A Primer. Narrowband Transition What is it? What is it? A nation-wide move to new VHF/FM frequencies A nation-wide move to new.
Joint University Program 5 April 2001 Steven Aab, Graduate Research Associate Avionics Engineering Center Ohio University Advisor: Dr. Michael F. DiBenedetto,
AIR TRAFFIC CONTROL Presented by S.SUMESWAR PATRO Regd no:
Presented to: PNT Advisory Board By: JC Johns, Director Navigation Services Date: May 14, 2009 Federal Aviation Administration GNSS Program Status WAAS,
Presented to: Aerospace Control and Guidance Systems Committee By: Stan Pszczolkowski, Manager, System Analysis Team Date: October 11, 2006 Federal Aviation.
St Louis Flying Club I 2008 Annual Meeting 2008 Annual Meeting.
India GAGAN – Adoption within Asia Pacific Region Plan/Opportunities.
ICAO Flight Plan 2012 Workshop ARE YOU READY? Durban 24 August 2012.
GSA Fleet: Remarketing and Fleet Solutions Daniel Reichmann and Scott Stockton.
NTAS NextGen Videos  Satellite Based navigation  ADS-B ◦ In / Out  Performance Based Navigation ◦ RNP/RNAV  TBO  Data Link Communications.
FIT Aviation, LLC – College of Aeronautics Welcome!
Rocky Mountain Section General Meeting December 10, 2009.
Emerging Issues for Air Navigation Service Providers Rudy Kellar Vice President, Operations NAV CANADA September 2007.
FAA System-Wide Information Management Program Overview for SWIM-SUIT Public Lauch Donald Ward Program Manager FAA SWIM Program April 2007.
Presented to: NAS-Wide Simulation Workshop By: Kimberly Noonan, FAA NextGen and Ops Planning Date: January 28, 2010 Federal Aviation Administration NextGen.
International Data Link Symposium st October 2003, Newbury, UK FEASIBILITY STUDY FOR CIVIL AVIATION DATA LINK FOR ADS-B BASED ON MIDS / LINK16 Bob.
Civil Air Patrol Command Council Meeting 1-2 March 2013 Arlington, VA.
NextGen & ADS-B Presentation to Aviation Accreditation Board International (AABI) Industry/Educator Forum July 18, 2013 Kansas City, MO.
WORLD-WIDE CNS/ATM SYSTEMS IMPLEMENTATION CONFERENCE Agenda Item : Financial Matters Agenda Item : Financial Matters 3:
What Is Multilateration Triangulation System Uses Aircraft Transponder Multiple Ground Receivers Central Computer Calculates & Displays Aircraft Position.
Civil Air Patrol Command Council Meeting 1-2 March 2013 Arlington, VA.
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
ADS-B Technology Overview
2 nd Workshop, April 2006 Session 4: Integrating ASAS in an evolving ATM system.
Civil Air Patrol Command Council Meeting 1-2 March 2013 Arlington, VA.
C-17 Program Description Three Contracts (All Solicited prior to 1 Jan 04) – Development – Production – Sustainment 180 Aircraft by Aug 08/126 currently.
Federal Aviation Administration FPAW October Delivering NextGen Next Generation Air Transportation System Presented to: FPAW By: Alfred Moosakhanian,
1 Overview of JPDO and the Weather IPT Mark Andrews Weather IPT Lead July 13 th, 2006.
Civil Air Patrol Command Council Meeting 1-2 March 2013 Arlington, VA.
ENJJPT SC #69 T-6A Programs Mr. Patrick Frye AFLCMC/WLZ (JPATS) 17 February 2015.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
Federal Aviation Administration Presented To: IPACG/39 Presented By: Dennis Addison, FAA Date: February 5-6, 2014 IP06: ADS-B In-trail- Procedure (ITP)
INTEGRATION OF UNMANNED AIRCRAFT SYSTEMS Into the New York Terminal Area Christopher Kennedy Anthony Peri.
ADS-B for NH Wing Lt Col G. Skip Guild 28 April 2016.
Navigation Technology
CITY OF LEMON GROVE RECREATION SERVICES FOCUS GROUP Lemon Grove City Council March 1, 2016.
1 © The MITRE Corporation This is the copyright work of The MITRE Corporation and was produced for the U.S. Government under Contract Number DTFA01-01-C
Pacific Aviation Investment Program. US$125 m Adaptable Program Loan Phase 1 Phase 2, 3, 4 Objective: improve operational safety and oversight of international.
Public Speaker Automation System BCC Work Session CEDS Department March 15, 2016.
Digital In The Skies Simon Daykin NATS Chief Architect.
Presented to: By: Date: Federal Aviation Administration Rotorcraft VFR Part 91 Operations Pilot Certification & Operating Rules Aircraft Electronics Association.
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
Graphic showing EGPWS Activation
Huber Air Park Meeting April 2017, ADS-B
Runway Incursion JJ Johnson May 2011
Safe Flight 21 and Capstone Weather Applications
QUICK GUIDE TO GETTING COMPLIANT
Outreach & Communications Committee Task Force Update
2019 CAP SUMMER CONFERENCE Aircraft Management
Presentation transcript:

Civil Air Patrol Command Council Meeting 1-2 March 2013 Arlington, VA

Automatic Dependent Surveillance- Broadcast (ADS-B) Implementation Mr. Desmarais & Col Murrell

What is ADS-B? What is ADS-B? How does ADS-B Work? How does ADS-B Work? Where will ADS-B be Required? Where will ADS-B be Required? Ground Stations & Coverage Ground Stations & Coverage 2013 Coverage Expansion 2013 Coverage Expansion Tentative CAP ADS-B Plans Tentative CAP ADS-B Plans Overview

Automated Dependent Surveillance-Broadcast (ADS-B) is a key part of the FAA NextGen transformation Automated Dependent Surveillance-Broadcast (ADS-B) is a key part of the FAA NextGen transformation ADS-B will allow air traffic controllers & pilots to see the location of every equipped aircraft ADS-B will allow air traffic controllers & pilots to see the location of every equipped aircraft Pilots will also have real-time access to weather and flight information (ADS-B In) Pilots will also have real-time access to weather and flight information (ADS-B In) ADS-B Out is currently mandated for implementation by 1 January 2020, though that may be extended due to delays in rollout ADS-B Out is currently mandated for implementation by 1 January 2020, though that may be extended due to delays in rollout What is ADS-B?

How does ADS-B Work?

Where will ADS-B be Required?

Ground Stations & Coverage

2013 Coverage Expansion Current 2013

Begin Installations in FY15 Begin Installations in FY15 Why not now? Why not now? Funding: Equipment and installations cost is expected to be $6K to $8K in G1000s, or $15 to $18K for older aircraft because of the need for the large MFD Funding: Equipment and installations cost is expected to be $6K to $8K in G1000s, or $15 to $18K for older aircraft because of the need for the large MFD Vendors have indicated that software changes may take place forcing costly updates to current equipment Vendors have indicated that software changes may take place forcing costly updates to current equipment Options are changing and prices are dropping as more choices come to market Options are changing and prices are dropping as more choices come to market Tentative CAP ADS-B Plans

Initial Focus will be on G1000 equipped aircraft, and others already outfitted with large MFDs Initial Focus will be on G1000 equipped aircraft, and others already outfitted with large MFDs Add into procurement contracts if possible Add into procurement contracts if possible Retro-fit existing aircraft Retro-fit existing aircraft Next will be older aircraft expected to be in the fleet for an extended period (Time TBD) Next will be older aircraft expected to be in the fleet for an extended period (Time TBD) Finally, portable ADS-B units will be used to fill gaps for aircraft not expected to remain in the fleet long enough to warrant procurement Finally, portable ADS-B units will be used to fill gaps for aircraft not expected to remain in the fleet long enough to warrant procurement Tentative CAP ADS-B Plans