Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 1 Pre-installation and Functional Tests StartFinish  Certification of field cage………………….. 01-0403-04.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
ALICE TPC field cage status Sardinia May 2004 Michael Hoch Cern-TA2.
1 Installation of Delphi Frame  ITS Installation.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
TB Peter Glässel, Heidelberg1 TPC Status.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Assembly Scenarios Draft 1 MODEL simulation based on CXUO-CRY-AP-001.
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT1 TPC Field Cage Progress Report Project Schedule Technical Progress & Prototyping Contractual Matters.
Installation Review March ‘03 L.Simonetti – INFN Torino 1 ITS - FWD - beam pipe installation  Elements considered ITS (=SPD+SDD+SSD), FWD (=V0 R, T0 R,
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
2-3rd. September 2002TPC Collaboration Meeting1 TPC INTEGRATION & SERVICES Mini Space Frame Back Frame Cooling Systems Cables Gas Systems Items Requiring.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
ALICE TPC Status, Meeting with LHCC referees ALICE TPC – Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader:
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
1/6 ALICE GLIMOS, Marc Tavlet Hazards and Safety in ALICE - Ways to reduce the risks Presentation at the ALICE Club, Monday, December 1 st, 2003 by Marc.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
CLAS12 Drift Chamber Prototyping
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
Technical FORUM, Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel,
ATLAS closing scenario  Where we are  What is still be done before closing (ADO-PO support)  Closing scenario / Procedure / Schedule Prepared by Michel.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
Installation of the T600 at Fermilab CSN2, September 22,
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
VELO Integr - Jan06Jean-Christophe GAYDE TS/SU EDMS n° SURVEY FOR VELO INSTALLATION 1.SURVEY AT GROUND FLOOR - FIDUCIALISATION 2.SURVEY FOR INSTALLATION.
Single phase ProtoDUNE detector installation Plans and Constraints Jack Fowler Duke University 23-Feb-2016.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
Installation of the T600 at Fermilab Fermilab, February 15,
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
Kitakami Side AHCAL Assembly or anywhere in any detector.
Planning for Proto-DUNE PD Installation and Cabling at CERN
Installation of the T600 at Fermilab
The GOOFIE detector as a Ternary Mixture Monitor
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
VELO-installation meeting CERN, January 17, 2006
Pre-installation and Functional Tests
LHC Experimental Vacuum Systems Status October ‘07
TPC Field Cage Progress Report
Initial BIS installation
TPC Detector Control System
Cryomodule Assembly Plan
Presentation transcript:

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 1 Pre-installation and Functional Tests StartFinish  Certification of field cage………………… (Survey central electrode and end plates in horizontal) Close field cage (dummy chambers) Final leak test HV test in air or CO 2  Installation of readout chambers …..…… Place service support wheels on DELPHI frame Place scaffolding on both sides Mount insertion tool Installation of readout chambers (72) Tests for shorts on each chamber (20% HV, 100% Gate-V)

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 2 Service Support Wheel & ROC Mounting Tool

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 3 Pre-installation and Functional Tests StartFinish  Survey of readout chambers……………… 06/0406/04 Load TPC with dummy ITS Combine with ITS rail deflection test Incline TPC to beam angle 1-2 mbar pressure in TPC Mount “I-bar” on shaft side Survey of chambers on both TPC sides (photogrammetry) Record individual positions of chamber mounting points 3 for IROCs and 4 for OROCs (serve as reference)

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 4 Pre-installation and Functional Tests StartFinish  Trial assembly of TPC in space frame…… 07/0407/04 Survey and adjustment of TPC-Space Frame rail system Move TPC into space frame and record insertion procedure Check for stability of reference positions Move TPC back into DELPHI frame

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 5 StartFinish  Alignment of readout chambers…………… 08/0408/04 TPC inclined and compensation (I-) bar mounted New survey of TPC end plates Individual machining (shimming) of mounting points Placement of shims and final survey Fill TPC with drift gas (Ar-CO 2 ) Requires that TPC gas system is temporarily installed in SXL2  Installation of laser calibration system……. 09/0409/04 Mount beam telescopes and splitters on end plates Geometrical adjustments Tests with He-Ne-lasers Pre-installation and Functional Tests

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 6 StartFinish  Installation of electronics…………………… 10/04 01/05 Install service support wheel and scaffolding Mount front end- and readout electronics Mount DCS, LV, cooling and services Apply LV power (one 20° sector only); monitor temperature Pulser, grounding and crosstalk tests Check entire readout chain HV tests with cosmics and laser (266 nm)  Pre-commissioning of TPC………………… 02/0502/06 Sector-wise tests with cosmics and laser Full functionality of readout system Full functionality of DCS and support systems Pre-installation and Functional Tests

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 7 Pre-installation Schedule Delays prior to or during pre-installation shall be absorbed by the pre-commissioning period

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 8 Installation Procedure  StartFinish  Transfer of TPC from SXL2 to SX2……………… Lift DELPHI frame with TPC out of clean room Load both on a low-bed truck Move to SX2 by truck Unload truck in SX2  Transfer from SX2 to UX25………………………… Crane in SX2 lowers TPC to underground Crane transfer from SX2 to UX25 Connect DELPHI frame to space frame  TPC insertion….…………………………………… Survey of TPC-Space Frame rail system (theodolites!) Slide TPC into space frame General survey & alignment (theodolites)  TPC in place and aligned…………………………..June 2006

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 9 Transport To SX2

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 10 Lowering Of TPC Through Shaft

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 11 Insertion In Space Frame

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 12 Installation Procedure StartFinish  Preparation for ITS installation…………………… Installation of extension rails Removal of TPC from interaction point (IP)  TPC on stand-by during ITS installation………… Gas circulation active  Install Lasers and beam guides in UX25…………  TPC reinsertion……………………………………… Move TPC back into IP position Survey (theodolites) and inspection for damage Connection of power and services Connection of readout/DCS cables Removal of extension rails  TPC installation complete…………………………. Nov/Dec 2006

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 13 Installation Schedule

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 14 Installation Tools  Only one (major) tool used: Serves as handling, transport and installation tool. This frame is also used for the assembly of the TPC. The DELPHI Barrel RICH Frame

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 15 Survey and Alignment  TPC and service support wheels sit on sliding (friction) pads  Need CERN survey team in all phases: Photogrammetry on surface Traditional methods such as theodolites in cavern Need fiducial marks (“Taylor balls”) on end plates (6 + 6) Need identifiers (etiquettes) on service support wheel Requires perhaps special supports on service support wheel to make identifiers visible through cabling layers. Should be considered in view of frequent TPC movements Need lines of sight to Taylor balls  Space frame and rail sag Space frame sags each time another detector is mounted! --> do initial TPC survey and then a… …final survey when space frame is full.

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 16 CERN Infrastructure Use  Service & Support groups: EP-TA1 Gas working group EP-TA2Construction & assembly, installation assistance, emergency interventions EP-EDFront end electronics EST-LEAInstallation & integration Cabling from service support wheels to racks EST-SU/EXPSurvey and alignment (Task Leader: C. Lasseur) ST-CV Cooling and ventilation systems TISAuthorization for use of equipment (lasers, field cage HV)  Cranes and special vehicles Standard hall cranes One movable crane (35 t) plus driver for one day Low-bed truck (35 t) for one day and one transport Distance is only ~100 m from SXL2 to SX2!

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 17 Commissioning  DCS fully functional to take control of operation Imperative for all subsequent tasks and functions  Gas mixture and quality Detector was already filled with drift gas prior to ITS installation Gas quality (O 2 and H 2 O) checked If not okay, check for leaks. Full test of gas system and safety features  Startup of all cooling systems Electronics, resistor rods, thermal screens  Low voltage Monitor temperature Check for shorts Inspection of grounding and shielding  HV (all systems) Relies on gas quality Gradual ramp-up of all supplies and current monitoring

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 18 Commissioning (cont’d)  Readout system Check for correct cabling Check for oscillations, high pedestals, noise sources Pulse readout electronics Look for cosmic signals (if HV is operational)  Laser calibration system Power lasers Send beams to TPC Requires special safety precautions! Beam alignment and correlation Read out tracks with DAQ Do first calibration series with B = 0

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 19 Personnel and Resources  Field cage & CERN’s host responsibilities EP-AIT EP-TA1 EP-TA2 EP-ED EST-LEA EST-SU/EXP ST-CV TIS Gas-WG Front End Electr. Install. & Integr. Survey Cooling Safety FC, DCS, Installation Field Cage Constr. General continuous support

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 20 Personnel and Resources Bratislava Frankfurt GSI Heidelberg xxxx xx x 0 Electr., LV, Services, Calibr. Gating, SSW SSW, Constr. Construction Constr. & Cool. Bergen Heidelberg xxxx xxxx ALTRO PASA Copenhagen All systems  Readout chambers, cooling and services  Electronics  Laser calibration system

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 21 Risks and Concerns  Technical Commissioning period is short (but we have extensive pre-commissioning!) Stability of readout chamber position in view of frequent TPC movements Regular (yearly) TPC roll-outs for ITS maintenance and repair  Personnel Possible shortage of manpower Forecasting of resources difficult  Scheduling Slippage due to shortage of manpower Unknown delays from ITS maintenance scenario Re-commissioning of TPC

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 22 Maintenance and Access In the Future  Field Cage (low risk item): The most critical components are the resistor rods They are exchangeable but require, scaffolding, special handling tools and partial dismounting of electronics. If failure is on absorber side, TPC must be moved out of IP position, necessitating complete uncabling of the service support wheels. Un- and recabling of TPC: max. 20 work days (8 h) Repair work and debugging: 10 d  ROCs (low risk item): The most sensitive components are the wires (breakage and aging) Same arguments as for the resistor rods  Electronics and DCS: Standard maintenance at the level of the service support wheels Requires scaffolding for access  Laser Calibration System: Standard maintenance at the level of the end plates

Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 23 ITS Trial Assembly