1 Pre-installation and Functional Tests
Start Finish Certification of field cage………………… (Survey central electrode and end plates in horizontal) Close field cage (dummy chambers) Final leak test HV test in air or CO2 Installation of readout chambers …..…… Place service support wheels on DELPHI frame Place scaffolding on both sides Mount insertion tool Installation of readout chambers (72) Tests for shorts on each chamber (20% HV, 100% Gate-V) Thomas C. Meyer/EP-AIT

2 Service Support Wheel & ROC Mounting Tool
End Plate ROC Thomas C. Meyer/EP-AIT

3 Pre-installation and Functional Tests
Start Finish Survey of readout chambers……………… 06/04 06/04 Load TPC with dummy ITS Combine with ITS rail deflection test Incline TPC to beam angle 1-2 mbar pressure in TPC Mount “I-bar” on shaft side Survey of chambers on both TPC sides (photogrammetry) Record individual positions of chamber mounting points 3 for IROCs and 4 for OROCs (serve as reference) Thomas C. Meyer/EP-AIT

4 Pre-installation and Functional Tests
Start Finish Trial assembly of TPC in space frame…… 07/04 07/04 Survey and adjustment of TPC-Space Frame rail system Move TPC into space frame and record insertion procedure Check for stability of reference positions Move TPC back into DELPHI frame Space Frame TPC in DELPHI Frame Thomas C. Meyer/EP-AIT

5 Pre-installation and Functional Tests
Start Finish Alignment of readout chambers…………… 08/04 08/04 TPC inclined and compensation (I-) bar mounted New survey of TPC end plates Individual machining (shimming) of mounting points Placement of shims and final survey Fill TPC with drift gas (Ar-CO2) Requires that TPC gas system is temporarily installed in SXL2 Installation of laser calibration system……. 09/04 09/04 Mount beam telescopes and splitters on end plates Geometrical adjustments Tests with He-Ne-lasers Thomas C. Meyer/EP-AIT

6 Pre-installation and Functional Tests
Start Finish Installation of electronics……………………10/04 01/05 Install service support wheel and scaffolding Mount front end- and readout electronics Mount DCS, LV, cooling and services Apply LV power (one 20° sector only); monitor temperature Pulser, grounding and crosstalk tests Check entire readout chain HV tests with cosmics and laser (266 nm) Pre-commissioning of TPC………………… 02/05 02/06 Sector-wise tests with cosmics and laser Full functionality of readout system Full functionality of DCS and support systems Thomas C. Meyer/EP-AIT

7 Pre-installation Schedule
Delays prior to or during pre-installation shall be absorbed by the pre-commissioning period Thomas C. Meyer/EP-AIT

8 Installation Procedure
Start Finish Transfer of TPC from SXL2 to SX2……………… Lift DELPHI frame with TPC out of clean room Load both on a low-bed truck Move to SX2 by truck Unload truck in SX2 Transfer from SX2 to UX25………………………… Crane in SX2 lowers TPC to underground Crane transfer from SX2 to UX25 Connect DELPHI frame to space frame TPC insertion….…………………………………… Survey of TPC-Space Frame rail system (theodolites!) Slide TPC into space frame General survey & alignment (theodolites) TPC in place and aligned………………………….. June 2006 TPC in DELPHI Frame Magnet Space Frame Thomas C. Meyer/EP-AIT

9 Transport To SX2 TPC in DELPHI Frame Thomas C. Meyer/EP-AIT

10 Lowering Of TPC Through Shaft
Thomas C. Meyer/EP-AIT

11 Insertion In Space Frame
Magnet Space Frame Thomas C. Meyer/EP-AIT

12 Installation Procedure
Start Finish Preparation for ITS installation…………………… Installation of extension rails Removal of TPC from interaction point (IP) TPC on stand-by during ITS installation………… Gas circulation active Install Lasers and beam guides in UX25………… TPC reinsertion……………………………………… Move TPC back into IP position Survey (theodolites) and inspection for damage Connection of power and services Connection of readout/DCS cables Removal of extension rails TPC installation complete…………………………. Nov/Dec 2006 Thomas C. Meyer/EP-AIT

13 Installation Schedule
Thomas C. Meyer/EP-AIT

14 The DELPHI Barrel RICH Frame
Installation Tools Only one (major) tool used: Serves as handling, transport and installation tool. This frame is also used for the assembly of the TPC. The DELPHI Barrel RICH Frame Thomas C. Meyer/EP-AIT

15 Survey and Alignment TPC and service support wheels sit on sliding (friction) pads Need CERN survey team in all phases: Photogrammetry on surface Traditional methods such as theodolites in cavern Need fiducial marks (“Taylor balls”) on end plates (6 + 6) Need identifiers (etiquettes) on service support wheel Requires perhaps special supports on service support wheel to make identifiers visible through cabling layers. Should be considered in view of frequent TPC movements Need lines of sight to Taylor balls Space frame and rail sag Space frame sags each time another detector is mounted! --> do initial TPC survey and then a… …final survey when space frame is full. Thomas C. Meyer/EP-AIT

16 CERN Infrastructure Use
Service & Support groups: EP-TA1 Gas working group EP-TA2 Construction & assembly, installation assistance, emergency interventions EP-ED Front end electronics EST-LEA Installation & integration Cabling from service support wheels to racks EST-SU/EXP Survey and alignment (Task Leader: C. Lasseur) ST-CV Cooling and ventilation systems TIS Authorization for use of equipment (lasers, field cage HV) Cranes and special vehicles Standard hall cranes One movable crane (35 t) plus driver for one day Low-bed truck (35 t) for one day and one transport Distance is only ~100 m from SXL2 to SX2! Thomas C. Meyer/EP-AIT

17 Commissioning DCS fully functional to take control of operation
Imperative for all subsequent tasks and functions Gas mixture and quality Detector was already filled with drift gas prior to ITS installation Gas quality (O2 and H2O) checked If not okay, check for leaks. Full test of gas system and safety features Startup of all cooling systems Electronics, resistor rods, thermal screens Low voltage Monitor temperature Check for shorts Inspection of grounding and shielding HV (all systems) Relies on gas quality Gradual ramp-up of all supplies and current monitoring Thomas C. Meyer/EP-AIT

18 Commissioning (cont’d)
Readout system Check for correct cabling Check for oscillations, high pedestals, noise sources Pulse readout electronics Look for cosmic signals (if HV is operational) Laser calibration system Power lasers Send beams to TPC Requires special safety precautions! Beam alignment and correlation Read out tracks with DAQ Do first calibration series with B = 0 Thomas C. Meyer/EP-AIT

19 Personnel and Resources
Field cage & CERN’s host responsibilities 2004 2005 2006 2007 EP-AIT EP-TA1 EP-TA2 EP-ED EST-LEA EST-SU/EXP ST-CV TIS 3 0.25 0.5 0.6 0.1 18 4 Gas-WG Front End Electr. Install. & Integr. Survey Cooling Safety FC, DCS, Installation Field Cage Constr. General continuous support 0.01 3.5 1 0.2 Thomas C. Meyer/EP-AIT

20 Personnel and Resources
Readout chambers, cooling and services Electronics Laser calibration system 2004 2005 2006 2007 Bratislava Frankfurt GSI Heidelberg x 1.5 Electr., LV, Services, Calibr. Gating, SSW SSW, Constr. Construction Constr. & Cool. Bergen Heidelberg x ALTRO PASA Copenhagen 0.1 All systems Thomas C. Meyer/EP-AIT

21 Risks and Concerns Technical Personnel Scheduling
Commissioning period is short (but we have extensive pre-commissioning!) Stability of readout chamber position in view of frequent TPC movements Regular (yearly) TPC roll-outs for ITS maintenance and repair Personnel Possible shortage of manpower Forecasting of resources difficult Scheduling Slippage due to shortage of manpower Unknown delays from ITS maintenance scenario Re-commissioning of TPC Thomas C. Meyer/EP-AIT

22 Maintenance and Access In the Future
Field Cage (low risk item): The most critical components are the resistor rods They are exchangeable but require, scaffolding, special handling tools and partial dismounting of electronics. If failure is on absorber side, TPC must be moved out of IP position, necessitating complete uncabling of the service support wheels. Un- and recabling of TPC: max. 20 work days (8 h) Repair work and debugging: 10 d ROCs (low risk item): The most sensitive components are the wires (breakage and aging) Same arguments as for the resistor rods Electronics and DCS: Standard maintenance at the level of the service support wheels Requires scaffolding for access Laser Calibration System: Standard maintenance at the level of the end plates Thomas C. Meyer/EP-AIT

23 ITS Trial Assembly TPC ICV Rails Thomas C. Meyer/EP-AIT