Endcap Integration Workshop: June 11-14, 20011 CSC Commissioning Andrey Korytov.

Similar presentations


Presentation on theme: "Endcap Integration Workshop: June 11-14, 20011 CSC Commissioning Andrey Korytov."— Presentation transcript:

1 Endcap Integration Workshop: June 11-14, 20011 CSC Commissioning Andrey Korytov

2 Endcap Integration Workshop: June 11-14, 20012 CMS schedule v31CMS schedule v31 EMU scheduleEMU schedule EMU installation windowsEMU installation windows Shipping containerShipping container Tests on arrival at CERNTests on arrival at CERN Quick pre-installation testQuick pre-installation test Installation/commissioning sequenceInstallation/commissioning sequence On-disk local commissioningOn-disk local commissioning Station commissioningStation commissioning CMS schedule v31CMS schedule v31 EMU scheduleEMU schedule EMU installation windowsEMU installation windows Shipping containerShipping container Tests on arrival at CERNTests on arrival at CERN Quick pre-installation testQuick pre-installation test Installation/commissioning sequenceInstallation/commissioning sequence On-disk local commissioningOn-disk local commissioning Station commissioningStation commissioningOutline

3 Endcap Integration Workshop: June 11-14, 20013 V31: March 2001

4 Endcap Integration Workshop: June 11-14, 20014 V31: May 6, 2001 Muon system installation windows v31: Austin Ball, May 6, 2001 ENDCAP: ========================================================================================= startfinishcomments ========================================================================================= YE-123 Jul 0214 Oct 02free access YE-122 Oct 0223 Apr 03share with YB- (no YB- work planned) YE-123 Apr 0315 Sep 03shared with vac tank & coil YE-112 Jan 0418 Feb 04free access YE-112 Jul 0403 Dec 04crane shared with UX supply YE-218 Jun 0214 Oct 02free access YE-222 Oct 0223 Apr 02share with YB- (no YB- work planned) YE-223 Apr 0315 Sep 03shared with vac tank & coil YE-212 Jan 0418 Feb 04free access YE-212 Jul 0410 Dec 04crane shared with UX supply YE-309 Jul 0214 Oct 02free access YE-322 Oct 0223 Apr 02share with YB- (no YB- work planned) YE-323 Apr 0315 Sep 03shared with vac tank & coil YE-312 Jan 0418 Feb 04free access YE-312 Jul 0417 Dec 04crane shared with UX supply ========================================================================================= YE+127 Jan 0315 Nov 03free access YE+117 Dec 0302 Mar 03free access YE+112 Jul 0430 Aug 04crane shared with UX supply YE+214 Oct 0215 Nov 03free access YE+217 Dec 0302 Mar 03free access YE+212 Jul 0402 Sep 04crane shared with UX supply YE+328 Oct 0215 Nov 03free access YE+317 Dec 0302 Mar 03free access YE+312 Jul 0415 Sep 04crane shared with UX supply =========================================================================================

5 Endcap Integration Workshop: June 11-14, 20015 V31: May vs. March 2001

6 Endcap Integration Workshop: June 11-14, 20016 FNAL--UC/UF Schedule

7 Endcap Integration Workshop: June 11-14, 20017 PNPI Schedule

8 Endcap Integration Workshop: June 11-14, 20018 IHEP Schedule

9 Endcap Integration Workshop: June 11-14, 20019 EMU Installation/Commissioning March V31 version

10 Endcap Integration Workshop: June 11-14, 200110 Shipping Containers –stacks of 5 boxes (easily re-stackable) –chambers are assembled and tested with electronics: once cover is taken off, one can connect and readout all electronics without extracting a chamber –HV and Gas connectors accessible without opening boxes: test for gas leaks test for broken wires and HV disconnections in air test dark current at nominal HV and nominal gas mixture

11 Endcap Integration Workshop: June 11-14, 200111 CSCs will arrive to ISR Gas pipes?

12 Endcap Integration Workshop: June 11-14, 200112 Handling on Arrival 1) Truck enters here 2) Unloading Stacks of 5 CSCs 3) Stacks are moved to the tunnel Semi-clean rooms?

13 Endcap Integration Workshop: June 11-14, 200113 ISR: storage hall 5) Pre-installation Test: –dark current test (nominal mix) –un-stack, spread, and open –use portable mini-FAST DAQ: LVDB mezzanine board ALCT self-test CFEB connectivity CFEB noise CFEB calibration AFEB connectivity AFEB noise ALCT/CLCT Self-trigger Glue alignment pads (?) –close and stack again –gas: Ar+CO 2 Notes: Italic--we may want to skip later ME1--may require pre-installation tests conducted twice (on arrival and before installation) 4) HV and Leak Test in boxes 4*) Broken CSCs go to semi- clean room for repair

14 Endcap Integration Workshop: June 11-14, 200114 SX5: installation/commissioning: tentative sequence under scrutiny ME2 (example): 36+18=54 CSCs –deliver to SX5 30 chambers (6 stacks) = (5 days) –(gas leak in FY02-03 when we have time) = (6 days) –burst of installation of “back” chambers @ 4 CSC/day= 7 days XY –check for gas leak, in parallel with –burst of cabling/piping for back chambers @ 4 CSC/day = 7 days Y –commission “back” CSCs @ 4 CSC/day (portable HV and DAQ)= 7 days Y –at the same time deliver to SX5 another 30 chambers= (5 days) –burst of installation of “front” chambers @ 4 CSC/day= 7 days XY –check for gas leak, in parallel with –burst of cabling/piping for “front” chambers @ 4 CSC/day = 7 days Y –commission gas/water for the station= 1 day Y –commission “front” CSCs @ 4 CSC/day (portable HV and DAQ)= 7 days Y –alignment photogrametry = 2 days Y ------------- = 45 days –after that maintain Ar+CO 2 gas flow, monitor gas leaks, test HV periodically X - need for crane, Y - need for cherry picker

15 Endcap Integration Workshop: June 11-14, 200115 Commissioning Tests to be based on FAST site DAQ MINIMAL COMMISSIONING TESTS are in BOLD 1 Assembly 2 Water leak 3 LV electronics turn-on 4 HV turn on (current and cabling) 5 ALCT self-test 6 AFEB Noise test 7 AFEB Connectivity & Alive 8 AFEB Threshold and Analog Noise 9 AFEB Time Delay 10 CFEB Noise 11 CFEB Connectivity and Alive 12 CFEB Calibration 13 Comparator Noise 14 Comparator Threshold 15 Left/Right Comparator Logic 16 Left/Right Comparator Offset 17 Neighbor Comparator Offset 18 Comparator Timing 19 Chamber gain map 20 ALCT self-trigger on cosmics (need gas+HV) 21 CLCT self-trigger on cosmics (need gas+HV) 22 High-statistics cosmics (strip analysis) 23 Performance vs HV 24 High-rate test

16 Endcap Integration Workshop: June 11-14, 200116 Commissioning Manpower Overall Coordination:1 FTE (senior) DAQ Expert:1 DAQ software expert ISR:1 expert, 2 techs –Receiving, quick check on arrival –Pre-installation tests –Repairs, replacement of boards SX5:2 experts, 2 techs –Signal cable dressing/tests (on disks) –Service cables (HV, LV, slow control), pipes, hoses… –Post-installation commissioning

17 Endcap Integration Workshop: June 11-14, 200117 Summary: 2001-2002 2001: –next 6 mo:start forming a core of CERN-residing physicists define all steps and procedures both at ISR and SX5 2002: –January:First 10 CSCs will arrive to CERN-ISR –January:Portable DAQ and Equipment at CERN-ISR Test environment (gas, outlets, Ethernet, etc.) Working place (desks, phones, cabinets, etc.) CSC test and repair tooling, clean room –Jun-Aug:Pre-installation tests of 36 ME23/2 and 18 ME2/1 –June:One more portable DAQ and Equipment at SX5 Test and work environment –August:Finish YE-2 infrastructure –Sep-Dec:Installation/commissioning of ME-2

18 Endcap Integration Workshop: June 11-14, 200118 Summary: 2003-2004 2003: –Jan-Feb:Pre-installation tests of 36 ME23/2 and 18 ME2/1 –Mar-Apr:Installation/commissioning of ME+2 –May-Jun:Pre-installation tests of 36 ME23/2 and 18 ME3/1 –Jul-Aug:Installation/commissioning of ME-3 –Sep-Oct:Pre-installation tests of 36 ME23/2 and 18 ME3/1 –Nov-Dec:Installation/commissioning of ME+3 2004: –Jan:Pre-installation tests of 18 ME4/1 –Feb:Installation/commissioning of ME+4/1 –Mar-Jun:Pre-installation tests of 74 ME1/2, 54 ME1/3, 18 ME4/1 (Magnet test at SX5) –Jul-Aug:Installation/commissioning of ME+1/2 and +1/3 –Sep:Installation/commissioning of ME-4/1 –Sep:Pre-installation tests of 18 ME1/3 –Oct-Nov:Installation/commissioning of ME-1/2 and -1/3


Download ppt "Endcap Integration Workshop: June 11-14, 20011 CSC Commissioning Andrey Korytov."