PMG, June 15, 2000 Slide 1 Schedule Started ! Done Late Done Done(today)

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
The DØ Silicon Microstrip Tracker Frank Filthaut University of Nijmegen / NIKHEF NIKHEF, 4 August 2000.
Test of Pixel Sensors for the CMS experiment Amitava Roy Purdue University.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
FVTX Wedge Assembly WBS to David Winter Columbia University FVTX Wedge Manager.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
M. Gilchriese Status Report Sectors, Rings, Frame December 2002.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
Ageing … Eric Kajfasz (CPPMarseille) D0 Workshop, Beaune, June 17, 2003 DØSMT.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Production and Testing of the DØ Silicon Microstrip Tracker Frank Filthaut University of Nijmegen / NIKHEF For the DØ Collaboration NSS-MIC, October.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 17-Nov-2010.
D0 PMG 12/2/99 Fiber Tracker Status  Carbon fiber work u All support cylinders done u Some work remains on band/support pieces + work for Silicon Detector.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
Status of Hamamatsu Silicon Sensors K. Hara (Univ of Tsukuba) Delivery leakage current at 150V & 350V number of defect channels wafer thickness & full.
Mikhail Kubantsev - Kansas State University 1 Assembly of a Large Area Microstrip Silicon Tracker Some Experience of Construction of D0 SMT H- disk Silicon.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
Ronald Lipton Layer 0 Status PMG Sep Status of the Layer 0 Project – emphasis on hardware status, preproduction, and preparations for shutdown work.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
Roadmap to the next 2015 run F. Marchetto GigaTracKer Working Group meeting Dec. 9 th 2014 a)Introductory meeting on Nov. 27, 2014 b)At that meeting several.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Cost and Schedule.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
The DØ Silicon Microstrip Tracker (SMT) Breese Quinn, FNAL Vertex2001 September 24, 2001 (presented by Frank Lehner, Universitaet Zuerich) Design Production.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
ALICE SSD 20 May Yalta G-J Nooren ALICE SSD status.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications.
R. Lipton Vertex ‘98 Santorini, Greece The D0 Silicon Microstrip Tracker (D0SMT) Outline  Design  Detector Studies Coupling capacitors Radiation Damage.
Run2b Silicon Detector Design goals of Run2b Si system Stave design Silicon sensors Schedule K. Hara (U. Tsukuba)
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
CTF3 MEETING AT CERN 17/July/ PRESENT STATUS OF THE CIEMAT CONTRIBUTION TO CTF3 Luis García-Tabarés, on behalf of the Accelerators Group at CIEMAT.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
Si Sensors for Additional Tracker
Origami, PA 2015 Sep. 10 Koji Hara (KEK).
TBL, Status, Plans, Experiments
Summary of Fuse Testing for Barrel Module Fuse Boxes
Sensor probing (Summary)
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

PMG, June 15, 2000 Slide 1 Schedule Started ! Done Late Done Done(today)

PMG, June 15, 2000 Slide 2 Sensor Delivery p Axial detectors (3-chip):  All sensors in hand p 90 o detectors, DSDM (6-chip):  ~60 sensors to be delivered; current delivery 5/wk  production paced by sensor delivery  Micron delivery just in time, and remains worrisome »Fallback: Accept sensors which have one p-stop fault (noise region channels). 15 such sensors have been identified »Need to act soon on lower grade devices p 2 o detectors (9-chip)  Still to deliver (lyr2), (lyr4) sensors, which includes sensor to be returned after cleaning  226 sensors being processed at Micron (with yield of 53%), of which 94 have 4 month processing remaining  Taking processing into account, will need to purchase ~10 lower grade devices »Fallback: Accept sensors which have higher R bias, ~50 sensors have been identified p F-Wedge sensors Micron:  All 125 sensors received Eurisys:  Order of 65 sensors complete  Enough sensors on hand to build full complement of F disks  But, breakdown Voltage V at V depl =15-20 V for most  One more batch processed with improved implantation. Received 9 sensors of last batch. Quality indeed better. Requested delivery of all sensors of this batch (~20) in exchange for lower quality sensors received.

PMG, June 15, 2000 Slide 3 Sensor Delivery p H Wedges  additional 42 sensors needed which will arrive soon.  ()() ()()

PMG, June 15, 2000 Slide 4 High Density Interconnect Status p 3-chip hdi’s  done p 6-chip hdi’s  All hdi’s in hand  40 to be stuffed at Promex p 9-chip hdi’s  Last 46 hdi’s (short tail) on order; delivery next week  40 hdi’s at Promex for stuffing, 46 to go p F-wedge hdi’s  All hdi’s in hand  ~35 to go for stuffing at Promex p H-wedge hdi’s  All hdi’s in hand  75 to go for stuffing at Silitronics

PMG, June 15, 2000 Slide 5 Ladder and Wedge Production p Axial detectors (3-chip):  Ladder production has started again at rate 1/day  No problems foreseen p 2 o detectors (9-chip):  Production lagging due to availability of hdi’s »Reorder hdi’s »Problems with surface mounting components (Promex); e.g. problems with 27 hdi’s of one type (short tails)  Production slowly proceeding p 90 o detectors (6-chip):  Paced by Micron delivery, 107 sensors built so far p F Wedges (14-chip):  Production proceeding at adequate pace  Sensor and hdi availability not a problem  Recently received most Eurisys detectors with low V depl  Testing sensors is cumbersome p H Wedges (6-chip):  180 half wedges produced to date  Half wedge production proceeding adequately  Glued 39 full wedges of which ~21 detector grade  Encapsulation and full wedge production is slow but not limiting process

PMG, June 15, 2000 Slide 6 Production Status and Projection p Projected rates: assumed yieldcapacity  9-chip: 9.0/week 80% 15/wk  6-chip: 5.4/week 85% 10/wk  H-wedge: 6.2 week 85% 10/wk  F-wedge: 4.3/week 90% 15/wk Nov 1, 00 Aug 10, 00 today 50% line

PMG, June 15, 2000 Slide 7 Production Status for first half cylinder p Last dates for detector production keeping original schedule with completion August 1:  F Wedges: June 26, 2000  6/9-chip ladders: June 12, 2000 p 4 flavors of 9-chip ladders; current status: “short tails” Delay of ~ 3 weeks with respect to schedule

PMG, June 15, 2000 Slide 8 Production Rate

PMG, June 15, 2000 Slide 9 Barrel / Disk Assembly p First barrel (barrel 6) completed May 18 p Grounding problems observed in first barrel, coherent noise  barrel will be moved to address these problems p Second barrel (barrel 5) completed June 13 p Work on third barrel started p Third F disk encountered set back  remeasurement of alignment showed discrepancies of ~100  m  Probably due to mislabeling of files  OGP measurements performed today and disk should be completed today. p Next F disks, one of end disk assemblies, being prepared p Wedge production proceeding adequately for future assembly p H-disk still awaiting ORC sign-off for electrical tests

PMG, June 15, 2000 Slide 10 Silicon Support p Silicon Support Cylinder  Fabrication of support at z=o  Adding fiducials to end rings  Finished installing H disk kinematic mounts  Finished installation of adapter ring  Add reinforcements to cylinder feedthroughs  …...  June 26 move CFT to DAB