1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, RAL, 19-22 nd October 2008.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
1 UKNF/MICE Oversight Committee Open session Integration of the MICE project Background & local history Progress since 2007 Schedule & planning considerations.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 RF Power infrastructure Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
1 Infrastructure issues Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
1 Implications Of Infrastructure Build The Infrastructure Project is bigger than anyone thought, but now it’s understood The cost was underestimated, but.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
1 MICE Video Coference Project Manager Report Contents: Technical organisation of project Target and upstream beamline Muon beamline Infrastructure and.
1 MICE CM32 Summary Scheduling and planning; aims for this year Schedule update Main schedule drivers Keeping us on schedule Comment on Steps V & VI Detail.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
1 Hall & Beamline Installation Richard Apsimon, Andy Nichols, Willie Spensley MICE Collaboration Meeting, th Feb 2008.
1 Technical Co-ordination, Phase One The shared post of PM/TC has worked quite well Six months ago there was much for us to learn:  Revised the WBS 
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
UKNF/MICE PSAG, 3/5/11 Spectrometer solenoids: –Repair plan still ‘in approval’, already two months late –Workshop/mini review at LBNL 10 th /11 th May.
Infrastructure Update As at 11 th March 2009 Remaining four plates now fitted to North shield wall North & South walls and all galleries are considered.
1 MICE PM Report Phase One installations to date Problems with target & decay solenoid and rolling platforms Phase One remaining items Progress with Phase.
1 MICE PSAG PM report Brief overview Re-planning the project Solenoids, decay and spectrometer Open issues and worries Andy Nichols, STFC, PSAG, 5/5/10.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
Project manager report paul drumm CM16 October 2006.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
1 MICE CMPB Contents: Progress to date Project management things Plans for the May shutdown Steps towards Phase Two Problems and open issues summary Andy.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, DL, 4 th -7 th June 2008.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Spectrometer solenoid 2. Magnetic shielding 3. Next Collaboration meeting.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
1 MICE PM Report Outcome of Reviews held at CM22 –Motivation for holding them –Outcomes & actions –Observations & follow-ups MICE Video Conference, 20.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
1 MICE PM Report Summary since CM21 Decay solenoid Infrastructure progress Step One Installation Worries MICE Video Conference, 19 th June, 2008.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
1 MICE CM27 PM Report Re-defining the UK project this FY Schedule things Apologies and accommodation Andy Nichols, STFC 7 th July, 2010.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
1 MICE PM Report Phase One installations to date Some problems with target & Decay Solenoid Phase One remaining items, schedule & milestones Progress with.
1 MICE PM Report General Update –Phase I nearing completion –MICE Power –Actions for Decay solenoid & target –Follow-ups from last VC –Conclusions MICE.
1 MICE PM Report Infrastructure/integration progress Electrical work AFC, diffuser, etc Help with project control & staffing issues Worries & problems.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
Tuesday 9 th January Project Status Report Project Achievements Project Schedule Issues Finance Summary Risk Register Photos.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
1 MICE CM29 Engineering Summary Cooling channel moving platforms – Norbert Floor Beams and plates – Andy L Magnetic modelling – Mike RF Engineering – Andy.
1 MICE CM25 Engineering Session Summary Contents: Infrastructure Diffuser Coupling Coils Radiation Shutter AFC module EMR Andy Nichols, STFC, 4-7 th November.
MICE CM28 Engineering Session Summary (On behalf of Wing)
Status of the MICE Construction Project
MICE CM31 Schedule summary
MICE PM Report Progress with the Infrastructure A few problems
Presentation transcript:

1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008

2 Contents: Achievements since CM21 Target, decay solenoids Infrastructure Cooling channel elements Preparations for Phase Two Project Organisation Open issues and concerns

3 Achievements since CM21 Briefly: –DSA PPS system is operational –Main Hall PPS plan has been agreed – ‘green light’ for implementation’ –Very significant progress with the Infrastructure project –TOF0 is in its rightful place and working –A physical start has been made on the Focus Coil project with Tesla –A framework for the Phase Two project is becoming clearer –A steady stream of visitors to MICE for running shifts and installation - seems to be working well –A MICE Liaison/admin Officer will start on 29 th October –A slding beamstopper is ready to install and authorisation to use it is in place –Tracker #1 is ready to integrate –Good progress with the DL RF project

4 Target & Solenoids Target: –The installed ISIS target remains reliable, drive system and controls are robust and are now well understood –Link between ISIS BLMs and dip depth now being studied, problems with signal cables, etc now fixed –But, Offline target has failed badly (seized shaft/bearings) earlier this year – has compromised our agreement with ISIS –After this weekend, we have about 30K cycles left – need to do serious running at end of January, so need to re-establish the on-offline running regime with ISIS. What are we doing? Accept that we only have time to understand and refine the shaft/bearing interface Strengthen the engineering input – Jason Tarrant has started in this area Weekly detailed meetings are held Suspicion that magnetic and mechanical axes are out of line Result, unforseen lateral forces and maybe heat build-up on bearings Magnetic modelling (Paul Smith/Tom Bradshaw/Goran Skoro) Mechanical FEA re-visited (Wing/Stephanie)

5 Target & Solenoids Decay Solenoid –Linde fridge has been working reliably –During solenoid powering test, discovered one normally- conducting coil in downstream (coils 6-10) –Every ‘non-intervention’ fix has been tried so we are: Going to remove end cap of cryostat in October shutdown (starts today!) Need to move dipole and rig small hoist Experts, including PSI, make investigation, instrumentation is reinforced Then we close up and re-cool for further diagnosis Then in the December shutdown, we remove cold-mass half- way to fix the problem – can do this without dismantling shield wall Rails and support stand are being designed now –But we are also facing up to taking out the whole cryostat - very uncomfortable, but we might have to

6 Target & Solenoids Spectrometer Solenoid –Problems discovered with magnet #1 at supplier –Cooling to rad shield and anomaly with vent system pipework –Both these need mechanical fix –Decided to intercept them on magnet #2 and shift priority to that – it effectively becomes magnet #1 –MICE EB decided to stick to original plan of field map at FNAL before shipment to RAL – this was the right thing to do –Combination of the above means magnet #2 arrives at RAL around mid-January ‘09 –More detail from Mike & Steve later I’m sure.

7 Infrastructure South Shield Wall –All plates are on, including floor plates –LH2 gallery is mostly made and is next to be installed North Shield wall –Support structure complete –Over half the plates now on Mound excavation –It’s done, ducts are fitted and mound is backfilled False floor –Off-site fabrication underway, quench reaction block cast this week, then floor steel can start Aiming for completion by early December, small celebration on 12 th December in R5.2; you are all invited of course! This sets the date after which tracker readout can be installed

8 Infrastructure July September South Shield Wall Early photo of mound excavation – now done!

9 Cooling channel elements Focus Coils –Preliminary design review at Tesla in August was unsatisfactory –More work needed on mechanical and thermal calculations and quench protection design –This was fed back to Tesla by Wing – appears to have had desired affect: Another design review scheduled for 3 rd November FC delivery schedule unaffected so far RF Coupling Coils –Good progress with test coil –Production readiness review this week LH2 system –Mound excavation not a hurdle anymore! –Overall we’re late with prototype system – hard to see it working before Feb next year Decay solenoid has diverted effort –Next step is Hazop 2 review – Nov/Dec?

10 Preparations for Phase Two Recent History: –The UK Phase Two project contains the Focus Coils, but the infrastructure and installations are also a very significant part and are very easy to under-estimate –STFC asked for a bottom up estimate of the above to Step Five only –This has been done, but inevitably it came to more than can be afforded –It looks like we have to make a four year rather than three year project. –Mike, Alain, Ken & me spent some time earlier this year discussing how this might look –Reviews of major subsystems this week are vital input to costs and milestones for the final project plan – your help here is crucial –UK agreed Phase One deliverables, with exception of LH2 system are on target to be signed off this December

11 Project Organisation Not much to say here: –Been doing the job for a year now –I like the friendly and constructive atmosphere –There has been some highly visible progress in the Hall and elsewhere; a large number of people should take the credit for this –All the aspects appear to have strong teams with few weak links MICE does need to formalise safety policy decision process –Some suggestions will be put to EB later this week –Currently we are a bit vulnerable in local (RAL) framework MICE Liaison Officer has been appointed –She is called Rose Hayes, based in R1 –She starts on 29 th October –Already has a long list of jobs, accommodation and transport at the top !

Open Issues & Concerns For Step Five, MICE needs major Electrical supply upgrade It’s a non-MICE cost (£600K), but the lead time is two years Given a year to worry about how we (STFC) pay for it, we are already late…… We have to invent a way of parallel working on the LH2 plant, decay solenoid and focus coil integration…… We have some very good technical staff – must hold them together, within funding limitations, for Phase Two……. Worries about Decay solenoid, target & TOF1 I regard as relatively minor, as the right people are working on agreed solutions 12