Straw Electronics status and preparation for the technical run NA62 workshop Siena.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
Target Controller Electronics Upgrade Status P. Smith J. Leaver.
Walls crates cables gas chambers electronics CERN adb.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 BLM SystemComments LINAC2 8 movable detectors.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
S.Sergeev, JINR, Dubna. This is just an example of what could be done Could be extended to needs of any NA62 sub- detector requiring a lot of analog measurements.
NA62 straws Status and plan. Content Module assembly and preparation Electronics Testing, design, procurement Stacking Shipping Technical run Excitation.
ZTF Interconnecting Scheme Stephen Kaye
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
Straw electronics Straw Readout Board (SRB). Full SRB - IO Handling 16 covers – Input 16*2 links 400(320eff) Mbits/s Control – TTC – LEMO – VME Output.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
1 Outer Tracker Front-End Layout Distribution of Signals and Bias NIKHEF/HeidelbergOctober 2002.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
1 PreFPIX2 Inner board and test beam triggering Gabriele Chiodini Fermilab - Jan 07, 02.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Status of NA62 straw electronics Webs Covers Services Readout.
TPC electronics for ILD P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 24, 2013.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
Straw electronics status  Signal generation and formation in straw  Webs + Cover  Backend  TTC  Services + DCS  New engineer on VIA program Georgios.
Peter LICHARD CERN (for NA62) 1 NA62 Straw detector read-out system Introduction to NA62 NA62 layout Straw detector Requirements for straw detector electronics.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
FW and HW Status TDAQ WG 10/6/2015. Hardware MPOD: ◦ HV was NOT floating   Sensibility of current limit to external devices  Particularly for chamber.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
New digital readout of HFRAMDON neutron counters Proposal Version 2.
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
Plans for the 2015 Run Michal Koval, Peter Lichard and Vito Palladino TDAQ Working Group 25/3/2015.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM June 2008 Electronics WG Report TOTEM Electronics’ Status.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Electronics and DAQ status Frontend - covers – Preparation of the final cover version and production Design finished Mounting of RJ45 verified using selective.
Status of NA62 straw electronics and services
Status of NA62 straw readout
LKr status R. Fantechi.
RD51-WG X June test beam experience: useful information for October
Injectors BLM system: PS Ring installation at EYETS
DCH FEE 28 chs DCH prototype FEE &
T1 Electronic status Conclusions Electronics Cards:
COVER Full production should arrive today
FEE Electronics progress
Presentation transcript:

Straw Electronics status and preparation for the technical run NA62 workshop Siena

Contents Web circuits HV for webs Covers LV – Power supply – Patch panel HV – Power supply – Patch panel – Connectors and cables Readout Racks

Webs New web with improved pads and layout for coaxial HV cable – Pigtail with miniature HV LEMO should be assembled before mounting on the chamber – HV filter moved on the web – HV is now passing through cover using HV pass-through connector without connecting to cover ground 8 pieces of each type are now in assembly workshop – Ready in a week 32 pieces of each type in production – Ready end of September

Webs on module 0 Older type – Must be assembled for new HV connector and coax cable – What about HV filter ‘hanging’ in the air? – We have 10 samples of HV pigtails but with thicker coax cable (5mm instead of 3 mm) Mount them on module 0 – Lab? – ECN3 ? » Need correct working place

Cover New cover design now in review – The modification of LV power supply connector. – Move of tracks shorted by screws’ head. – Move of writings on seal area. – Replacement of PT package with – Removal of HV components. – Addition of hole for HV LEMO connector. – Move of gas connector. – Removal of SPI/I2C jumper, direct connection to the correct potential. – Removal of R26 and R29. – Improvement of ground plane around CH7. – Move of DAC output vias around CH15 protection resistor. Not included in new design – Doubling FPGA outputs to increase cable length between chamber and rack – Not so simple modification Will order 10 of each type Components ordered For technical run we will use 6 of each (we can read 12 boards using all SRBs)

LV power supply New version of MPOD in September Tests in ESE If OK, could be used in Technical run – If not, we use standard LVPS LV patch panels – produced and tested – 4 pieces

HV power supply and Patch panel MPOD (as for LV) if ready – If not, standard HV PS HV patch panel designed HV relay tested – 150mT without shield – ~450mT with shield – Direction dependent – Consider PCB mounted version replaced by wire soldering version

HV connectors ALL connectors are now HV industrial from LEMO Pass-through vacuum tight connector mounted on cover HV filter moved from cover to web Pigtail with miniature right-angle connector mounted on webs Order placed First 32 pigtails with preferred delivery time beginning of October

Readout We have 3 SRBs – Capable of reading 12 covers – NIM, LVDS and optical inputs interface to external world – NIM used during testbeam to synchronise with SPS and Micromegas Technical run – Use optical input to synchronize with other detectors – The same principle as for the testbeam SOB resets timing counters to ‘0’, resets data buffers and enables TDC measurement – SOB is crucial for synchronization with others EOB disables TDC measurement Data written to files with time stamp Possible to use PC emulating TEL62 TEL62 mezzanine for final application to interface to ‘standard’ DAQ – Probably not ready for the technical run Need to repair material broken at the dry run – 1 SRB with broken FPGA – 1 SRB with broken optical connector – 1 cover with broken ethernet connector and damaged PCB – already repaired

Racks Electrical Requirements Type of CrateWiener VMEWiener MPOD How many Unit9U Power in 220V (VA) Power in 380V (VA)NO Other Power?NO Normal NetworkYES Diesel NetworkNO UPS NetworkNO Comments Cooling and Ventilation Requirements Power needed (KW)33.6 Type of coolingAIR Other Cooling???? CommentsWater? Cable and Fibres between Detector and Rack Nb of HV cableNO8 Ø for 1 HV cableNO5mmNO Nb of LV cableno16 Ø for 1 LV cable 10mm Nb of fibreNO Ø for 1 fibreNO Nb of signal cable120NO Ø for signal cable12mmNO Other cablesNOSense wires Comments Auxiliary Equipment Type equipmentPC Power in 220V (VA)400 Power in 380V (VA)NO Power needed (KW)20 Type of coolingAIR We have foreseen to have – 2 MPODs – 1 VME 9U – 1 TEL62 – CANBUS patch panel Our racks are housing also other equipment Need to add another rack for the technical run Maybe also for other chambers