INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 BLM SystemComments LINAC2 8 movable detectors.

Similar presentations


Presentation on theme: "INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 BLM SystemComments LINAC2 8 movable detectors."— Presentation transcript:

1 INJECTORS BLM BI-TB on Proton Injector start-up

2 Summary of actions 2 13/02/2014christos.zamantzas@cern.ch BLM SystemComments LINAC2 8 movable detectors with BLECFT; no budget for new system PSB Legacy Calibration of ACEMs on-going New Under deployment; in parallel to legacy system PS Legacy Calibration of ACEMs on-going New ACQ Cables ready; responsibility of acq. system under BI-SW Diamond 2 detectors operational; no more cables available SPS Refurbishment of crates; new HV power supplies; work in LSS1

3 LEGACY SYSTEMS

4 LINAC2 | PSB & PS Legacy Systems LINAC2 ► Possibility for a new system briefly discussed, but finally no official request or budget allocation. ► Currently, 8 detectors with the BLECFT portable measurement system. PSB & PS legacy systems ► All ACEMs removed for calibration ► Approx. two more weeks needed ► Afterwards, 2-3 days per machine for re-installation. ► 22 new detectors used (last batch available; end-of-life) 4 13/02/2014christos.zamantzas@cern.ch E. Effinger

5 PS new acq. | SPS system PS new acquisition system ► New cables ready to be installed (< 1h) ► Some small reduction in sensitivity to be expected ► Remaining tasks are with BI/SW PS Diamond based system ► Two Diamonds available (pos. 16 & 42) ► New position requested (pos. 15), but no cable is available SPS system ► Refurbishment of all crates ► Replacement of HV power supplies ► Some cable changes in LSS1; with deprecation of one monitor 5 christos.zamantzas@cern.ch J. Emery E. Effinger

6 NEW SYSTEM FOR PSB

7 Cabling Diagram 7  Screen of HV BNC is open on the IC side to assure there is no ground loop.  Internal screen to shield low frequency noise (GND only on electronics side, IC is floating).  External screen to shield high frequency noise. BNC SMA TRIAX Connector Types: 13/02/2014 7 christos.zamantzas@cern.ch Ionization Chamber 50 ÷ 200 m~ 1 m CKC50 BNCSMA Acquisition Card (BLEDP) External Screen 2 Internal Screen 1 Signal HV Power Supply (~1500 V) HV BNC BNC Patch-cords

8 BLM Cable installation in PSB New cable (CKC50) production run on tight schedule: ► Modification of the CKB50 specs ► Completed and delivered on-time Re-installation in PSB ► Conformity measured (developed a test-bench) ► Completed on-time Patch-Cords ► Several types needed (length and connector type) ► Currently under production HV CablesSignal Cables Signal and HV Patch-Cords 13/02/2014 8 christos.zamantzas@cern.ch

9 BLM Detector Installation in PSB 9 PeriodPositionStatusComment 1 Internalok 2 Internalok 3 Internalok 4 Internalok 5 Internalok 6 Internalok 7 InternalokBPM pickups 8 Externalpartiallycustom support 9 Internalok1230uSv 10 Internalok 11 Externalnotcustom support 12 Internalnotno access at the moment 13 InternalokRF cavity 14 Externalokdisplaced due to ion pump 15 ExternalnotExtraction custom support 16 Internalok  Three periods require special supports due to space restrictions.  will be installed during technical stops  Patch-Cords not yet connected to the detectors  planned for next week  No access in period 12 due to crane renovation  scheduled for last week of February Support with Detectors configuration Tunnel installation: Very tight integration 13/02/2014christos.zamantzas@cern.ch

10 Status of PCB Development All prototypes verified and functional. Pre-Series production will need to cover needs till LS2. Contracts for the Acquisition and Mezzanine modules ready – to be launched around March 2014. 10 Name Acrony m Number of Components 201020112012201320142016/7 Prototype DevelopmentPre-SeriesSeries Acquisition Module BLEDP1934 First Prototype (1 piece) V1.0 (2 pieces) V2.0 & V2.1 (3 pieces) - Production V3.0 (20 pieces) Production V3.x (60-100 pieces) Acquisition Backplane BLEBP1173- V1.0 (2 pieces) V2.0 (1 piece) Production V3.0 (7 pieces) - Production V3.0 (10-15 pieces) Processing Mezzanine BLEPM210- V1.0 (1 pieces) -- Production V2.0 (20 pieces) Production V2.x (60-100 pieces) Crate Main Panel BLEMP52- First Prototype (2 pieces) V1.0 (2 pieces) Production V2.0 (7 pieces) - Production V2.0 (10-15 pieces) Crate Control Unit BLECU180- First Prototype (1 pieces) Second Prototype (1 pieces) Production V1.0 (7 pieces) - Production V1.0 (10-15 pieces) Acquisition Crate BLEAC200- First Prototype (1 pieces) V1.0 (2 pieces) Production V2.0 (7 pieces) - Production V2.0 (10-15 pieces) Crate Programmer BLEJP160-- First Prototype (1 pieces) Production V1.0 (7 pieces) - Production V1.0 (10-15 pieces) High Voltage Distribution BLEHV100--- Production V1.0 (7 pieces) - Production V1.0 (10-15 pieces) 13/02/2014christos.zamantzas@cern.ch

11 BLM Electronics installation in PSB All large components have been installed: ► Processing crate (VME64) ► Acquisition crate ► HV Distribution crate ► Fan-trays ► CIBUS To be installed (currently under production): ► Electronic cards ► HV Power Supply crate ► Signal Patch-cords (SMA-to-TRIAX) Rear viewFront view Rack in BAT42 13/02/2014 11 christos.zamantzas@cern.ch

12 Dust issue in PSB rack under the floating floor there is wood dust ► probably from cutting the panels when the new floor support was installed (?) cooling fans will deposit it in the electronics Asked help from the PSB responsible (David Hay) 12 christos.zamantzas@cern.ch13/02/2014

13 Thank you 13 christos.zamantzas@cern.ch

14 Reserved Slides 14 13/02/2014christos.zamantzas@cern.ch

15 New BLM System Overview 15

16 Acquisition module (BLEDP) 16 Backplane connection Analogue inputs, power and control SFP connectors Gigabit optical and/or Ethernet links FPGA Altera Cyclone IV JTAG connection Local programming and diagnostics Acquisition digitisation of 8 channels Completed verification of version 2 of the printed circuit board Completed verification of version 2 of the printed circuit board Completed design of version 3. - Noise reduction Completed design of version 3. - Noise reduction 13/02/2014christos.zamantzas@cern.ch


Download ppt "INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 BLM SystemComments LINAC2 8 movable detectors."