20.10.2006V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.

Slides:



Advertisements
Similar presentations
Questionnaire Response
Advertisements

CSC upgrade for LS1 USA-15 rack: layout, construction and installation 11 th February 2013.
André Augustinus 16 June 2003 DCS Workshop Safety.
LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
1 Daya Bay Muon system Installation Workshop, IHEP, July 14, Updated RPC Gas System Installation Plan Changguo Lu Princeton University.
1 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Daya Bay RPC Gas System Installation Plan Changguo Lu Princeton University.
September 2006Dirk Wiedner / Installation1 3-D Rackwizard How to keep track of cables to the detector.
Walls crates cables gas chambers electronics CERN adb.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Ken Wyllie, CERN Upgrade infrastructure, Feb LHCb Upgrade Electronics Infrastructure K. Wyllie & L. Roy.
Detector Cabling and Patching Rainer Schwemmer
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
Status of NA62 straw electronics Webs Covers Services Readout.
LKR Working group Introduction R. Fantechi October 27 th, 2009.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
Expt. Area meeting – December V. Bobillier1 Cabling installation status.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
SB 1 Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
V. Bobillier1 Cable installation status.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
Infrastructures and Installation of the Compact Muon Solenoid Data AcQuisition at CERN on behalf of the CMS DAQ group TWEPP 2007 Prague,
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Status of the NA62 network R. Fantechi 23/5/2012.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
Status of HO Installation Shashi Dugad Tata Institute of Fundamental Research India-CMS Collaboration Meeting, Chandigar April 2007.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Cabling for LHCb Upgrade
Rack Design Proposal as of 01/03/2013
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
DCS: Temperature Probes
Chamber Design and Integration RE3/1 and RE4/1
Fiber Installation for RUN 3&4
CSC Electronics Installation and Commissioning CSCE I&C
Needed for Team A on -End
Presentation transcript:

V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting

V. Bobillier2 Agenda Cable trays status Rack installation  Status  Missing information (rack layout) Long distance links  Status  Planning  Missing information (cable allowance)  Missing material (connectors and PP)  Tests foreseen From sub-det to PP rack cabling  What is foreseen (reminder)  Possible manpower issue Calorimeter commissioning meeting

V. Bobillier3 Cable trays installation status All long distance cable trays installed. Few additional cable trays in the Velo region still under installation. Cable trays to go from PP to Fixed Point for Calo and Muon still to be installed. Calorimeter commissioning meeting

V. Bobillier4 Racks installation status TELL1 racks in Counting House : TELL1 crates under installation when received at pit 8. All patch panels, heat exchangers, deflectors and turbines are installed. Remaining task : - Prepare patch cord cable installation in the rear of the TELL1 boards (can start when TELL1 are there). - Test of crate power and control (CAN interface). - Installation and test of TELL1 interfaces (ECS, DAQ, TTC). REMINDER : Optical patch cords are responsibility of sub-detectors. (OT: late change) All other racks (in counting house – D3B03 to D3B05) : All the mechanics still to be done (installation of sliding bars, turbine, heat exchangers, deflectors, side plates, etc). Information on rack layout is urgently required for that. Calorimeter commissioning meeting

V. Bobillier5 For the moment, these racks look like this : No side plates for air flow No internal support for cables No sliding bars No heat exchangers No flexible cooling pipes connecting HE No deflectors Already a turbine with rack monitoring and control (as we receive them and there is no much choice where to install them) Power distribution box installed. Goal: Have the racks prepared as much as possible so it can be nearly “plug and play” to install your equipment. If information is not received well in advance we will not be able to prepare your racks mechanically ! Planning: We need to know when you plan to come to pit 8 with the first equipment ?  Significant mechanical work still to be done in all other non-TELL1 racks (HV, LV and other equipments).  Sub-detectors must: Define the rack layout in rackwizard. Buy required equipment (deflector, heat exchangers, etc if standard recuperated ones are not ok). Rack internal cabling must be defined (equipment size, front/rear connection, air flow and other constraints must be taken into account). D3B03-05 racks in Counting House Calorimeter commissioning meeting

V. Bobillier6 The following items are now being installed in patch panel racks : ECS patch panels (SPECS) LVPS (both pwr and ctrl) DSS patch panels Those patch panels are connectorized NOW  This means no change in position will be possible afterwards ! Q2A01 patch panel rack in cavern Calorimeter commissioning meeting

V. Bobillier7 Long distance links (from patch panels to counting house) current status What has been done for the Calo: All copper cables : pulled Connector installation (LVPS and SPECS, PP side) : installed Connector installation (LVPS ctrl, CH side) : installed Remaining main tasks for the Calo : Reaming connector installation (All HV, SPECS CH side + others) Tests of all copper cables Installation and test of all optical fiber cables Calorimeter commissioning meeting

V. Bobillier8 Long distance links (from counting house to PP) missing information HV Connectivity layout HV patch panels and connectors Optical fiber connectivity layout Rack layout for D3B To do: Enter final rack layout (with all equipments) in rackwizard. Enter all optical fiber connectivity layout (both ends) using rackwizard (good and reactive support is now provided by Dirk Wiedner). Make very clear cable drawings for sub-detector specific links (mainly HV, good example can be seen here Provide HV and other specific patch panels and connectors. Calorimeter commissioning meeting

V. Bobillier9 Long distance links (from counting house to PP) missing information Deadlines For all:Final rack layoutASAP Calorimeter : - HV Connectivity layoutOct. 25 (mid next week) - HV patch panels and connectorsSame - Optical fiber connectivity layoutEnd Oct. (31.10) Muon : - All connectivity layout for Muon S1Oct. 27 (end next week) - Optical fiber connectivity layout (except for L0 trig)End Oct. (31.10) - HV connectivity layoutOct. 27 (end next week) - HV patch panels and connectorsSame Outer tracker : - All connectivity layout (optical fibers included)Nov. 6 (copper), End Oct. (fibers) Silicon tracker : - All connectivity layout (optical fibers included)Nov. 13 (copper), End Oct. (fibers) - HV patch panels and connectorsNov. 13 Rich : - All connectivity layout (optical fibers included)Nov. 27 (copper), End Oct. (fibers) - HV patch panels and connectorsNov. 27 VELO/Pile up :- All connectivity layout (optical fibers included)Dec. 11 (copper), End Oct. (fibers) - Analog link cables ??? (cable delivery, (start/end point for LV needed ASAP) connectorized or not ?) In Technical board yesterday

V. Bobillier10 Calorimeter commissioning meeting

V. Bobillier11 Long distance links (from CH to PP) cable tests Copper cables: - Continuity and short tests (at LV) will be made on all cables - No HV tests - No cross-talk, bandwidth or other similar kind of tests Optical fiber links: - Total power loss (dB) measurement - No OTDR tests - REMINDER : All link users must be capable of performing BER test with GOL. Calorimeter commissioning meeting

V. Bobillier12 Patch cord cables (in CH and from sub-det to PP) In CH : only optical fiber patch cords (MPO). From sub-det to PPall cable types (readout, power, control, DSS, etc.) REMINDER “Who is responsible for what” : Cable ordering: Sub-detectors Cable installation: Sub-detectors with help from CERN (to be discussed case by case in more detail). Connectors: Sub-detectors with help from CERN (to be discussed in more detail). Exception : TELL1 and UKL1 boards: sub-detectors only have to take care of MPO patch cords (input of TELL1). Other patch cords in TELL1 racks are installed by CERN. Tests of DAQ, ECS and TTC links to TELL1s will be done by Online. Tests for these links for UKL1 can only be done by online if soft is compatible (see with online if not). REMINDER: Particular care must be taken with optical fiber cables and connectors ! Calorimeter commissioning meeting

V. Bobillier13 Patch cord cables (in CH and from PP to sub-det) Who does what: Rich: Cabling done by themselves OT: Same Calorimeter: Help from CERN needed (until FP, to be discussed more in detail) Muon: Not well defined yet. ST: Help from CERN needed (to be discussed more in detail) Velo: Help from CERN needed (to be discussed more in detail) Further discussions are needed with sub-detectors requiring help for installation ! Russian cabling team will be 100% occupied with long distance links until end of January at least.  Hiring of temporary labor should be envisaged when needed for this cabling part. This will be organized centrally Cabling people to be supervised by sub-detector groups Calorimeter commissioning meeting

V. Bobillier14 Very simple conclusion : Use rackwizard to enter all information concerning your rack layout and cabling. Make precise drawing of specific cables (with explanations when particular care must be taken) Get the connectors (and special tools when needed) for long distance links to pit 8. If all this is not done very soon we will be blocked at some point with our Russian team playing cards at pit 8 !!! If we do not have information on time, racks and cables might look like that when you come at pit 8 with your equipment…! Conclusion Calorimeter commissioning meeting

V. Bobillier15 Questions / Comments ??? Calorimeter commissioning meeting