March 9, 2011 Report on Construct & Equip Wells (Moniter, 6400 South, 1330 East)

Slides:



Advertisements
Similar presentations
Visalia WCP Trickling Filter Upgrade Project 1994/1995 Trickling Filters, Pump Station and Flow Control Box Modifications.
Advertisements

Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
City of Los Angeles Venice Dual Force Main Project
6 th Street Water Main And Street Reconstruction 2013.
Chemigation. Chemigation Chemigation is the process of applying pesticides and fertilizer through irrigation waterChemigation is the process of applying.
Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.
FRED POWELL POWELL & PARTNERS, ARCHITECTS West Contra Costa Unified School District.
BOB BROZ UNIVERSITY OF MISSOURI EXTENSION (573) ISE #78 WATER MANAGEMENT STRATEGIES FOR DROUGHT MITIGATION AND SUSTAINABLE AGRICULTURAL PRODUCTION.
Sustained Compliance for Public Water Systems, Chapter 2, Workshop Department of Environmental Conservation Drinking Water Program Anchorage, September.
Pump Operational Flexibility & Optimization Pat Carney Flow-Technics Inc. Flow-Technics Inc1.
The Piping and Instrumentation Diagram Schematic of a control system –more detailed than process flow diagram –does not include values of parameters Used.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
Hydraulic Power Units Eric Bornemann Fall Power Unit Basics Uses Uses Open and closed center systems Open and closed center systems Parts Parts-Pump.
Feedwater Systems Reliability Users Group Annual Meeting January 20-23, 2014 Feedwater Pump Thrust Bearing Failure Presented By: Kurt J. Weis Rotating.
Demystifying SelfSensing Pumps. Design Operating Point 300 Gallons Per Minute 53 Feet of Head System Curves 150 ton 12deg Delta T 60 GPM each.
EPANET FOR PRESSURIZED PIPE SYSTEMS
2006 Technical Affairs Water Projects Department.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
New England Association Of Fire Protection System Designers Rick Dumont.
Introduction to “Single Pipe” systems design elements.
POWER SAVING BY ROCKSOLID INDUSTRIAL SOLUTIONS SYSTEMS REQUIRING PUMPS USING VALVE CONTROL SYSTEMS REQUIRING FANS USING DAMPER CONTROL SAVE GOOD $MONEY$
WESTERN CARY WATER STORAGE TANK Town of Cary Preliminary Engineering Report Progress Meeting June 8, 2015.
Pasadena Water and Power Department INCREASE CONTRACT 20,013 WITH VCI TELCOM FOR CONSTRUCTION OF UNDERGROUND SYSTEM IN LOS ROBLES BY $300,000 August 9,
Remarks will print on the completed form Generate Quantity Book Entry Generate Pay Quantity.
Pumps and Lift Stations. Background Fluid Moving Equipment Fluids are moved through flow systems using pumps, fans, blowers, and compressors. Such devices.
September 9, 2009 Report on SWGWTP Deep Well Drilling Phase 2.
John F. Kennedy High School – Science Wing, Richmond, CA Progress Report POWELL & PARTNERS, ARCHITECTS WCCUSD FACILITY SUB-COMMITTEE MEETING March 12,
Committed to providing safe, high quality water and related business services earning customer trust and confidence. Louisville Water Company Capital Program.
Sanitary Engineering Lecture 14
Water Well Design August 6, 2015 AL/MS AWWA Ralph Hayes, P.E., BCEE Engineering Director MSDH, Bureau of Public Water Supply.
Barge Products Categories:
Energy and Water Savings Presented by Bill Power Power Services, Inc San Mateo County Ag Workshop December 5, 2014.
1 BROOKHAVEN SCIENCE ASSOCIATES CCW Plant Expansion & CCW Piping Thomas F. Joos, PE Lead Civil/Structural Engineer CFAC Review March 10-11, 2009.
Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Variable Speed Applied to Pumps. Life Cycle Costs - Courtesy of Hydraulic Institute and Europump Initial cost is not the only cost associated with a pump.
Pine Mountain Lake Dredging Project Moffatt & Nichol Project Engineers Cooper Crane & Rigging, Inc. Contractor The Right Contractor Adaptability Communication.
LPA Training Program. LPA Training Program: Construction/Contract Management Module 2.
 Project Capacity: 54 MGD  Water Purchase Agreement: 30-year take-if-delivered contract with San Diego County Water Authority for water purchase of.
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved.
North American Hydraulics Baton Rouge, LA Steve Gluck Cell:
Paper Machines Stock Prep Class 2 P&ID’s Blend Chests Through Machine Chests.
TRUMAN MIDDLE SCHOOL Presented by Counsilman ▪ Hunsaker Facility Audit.
WATER SYSTEM WORKSHOP February 27, 2012
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Turnkey Capabilities.
10 12 and 14 TR Advanced Glycol Chiller
CBETA Technical Review
Storage and Feeding Economics
Green With Briess A sustainability initiative
Well 38 Drilling & Testing Amendment
Hydraulic lift with the aid of energy storage (accumulators)
Troubleshooting Hydraulic Pumps
Perris Water Filtration Plant Membrane Upgrade – Phase I
10TR Nominal Glycol Chiller
The Watersheds of Harris and Montgomery Counties
Bensalem Township School District Business Affairs Committee Meeting
Vertical Pressure Filters
Estimating Capital Costs
Team 11 Adam Fisher Presented by: Mitchell Quetant Nathan Hammond
Pumps and Lift Stations
PPL1.6 Pumping Plant Project Overview
ARIZONA WATER COMPANY East Sedona Water Storage Facility
Well Testing Well Performance Tests Flow Profiles Packer Tests

Huntsville High School Sports Lighting Upgrades
Science Activity: Stnd 01 Date
Presentation transcript:

March 9, 2011 Report on Construct & Equip Wells (Moniter, 6400 South, 1330 East)

Construct & Equip Wells Engineer: Hansen, Allen & Luce, Inc. Contractor: Hills Construction, Inc. Contract Award Date: 2/19/2007 Original Contract Amount: $3,802,210 Final Contract Amount: $4,106,121

Construct & Equip Wells Change Order #1: $12,147 – upsize to 14” pipe at 1330 Change Order #2: $37,818 – upsize pump & motor to 3000 gpm at 1330 well Change Order #3: $60,503 – changes in 1330 E drain line Change Order #4: $21,724 – connect 8600 S 1300 E Well to 24” line Change Order #5: $99,660 – Site work changes Change Order #6: $72,059 – Site work, chemical feed changes, electrical changes

Construct & Equip Wells Moniter Drive Well Depth: 1160’ Diameter: 20” 1,000-hp Motor Equipped Flow Rate: 3,590 GPM

Construct & Equip Wells 6400 South Well Depth: 832’ Diameter: 20” 400-hp Motor, VFD Equipped Flow Rate: 2,442 GPM

Construct & Equip Wells 1330 East Well Depth: 1,100’ Diameter: 20” 700-hp Motor Equipped Flow Rate: 2,442 GPM