1 September 9, 2009 Report on SWGWTP Deep Well Drilling Phase 2

2 SWGWTP Deep Wells Ph. 2 Engineer: Carollo Engineers with Bowen Collins & Assoc. Supplier: Zim Industries, Inc. Contract Award Date: 2/13/2008 Original Contract Amount: $1,097,300 Final Contract Amount: $1,118,451.50

3 SWGWTP Deep Wells Ph. 2 Change Order #1: $6,100 – DW7 final well design Change Order #2: $5,600 – DW7 Additional development Change Order #3: $3,040 – Additional well videos Change Order #4: $39,169 – DW6 Final well design Change Order #5: $9,440 – Additional air-lift development Change Order #6: ($41,797.50) – Project closeout

4 SWGWTP Deep Wells Ph. 2 DW6 – 9911 S. 2700 W. Depth: 602’ Feet of Screen: 152’ Diameter: 16” 24-hour Pump Test: 1,380 GPM Equipped Flow Rate: 800 GPM

5 SWGWTP Deep Wells Ph. 2 DW7 – 10940 S. 2700 W. Depth: 645’ Feet of Screen: 179’ Diameter: 16” 24-hour Pump Test: 2,400 GPM Equipped Flow Rate: 1,500 GPM