SiteManager Materials Division Auditor Meeting January 26, 2007.

Slides:



Advertisements
Similar presentations
RECORD KEEPING Cooperative Development of Operational
Advertisements

HIV Drug Resistance Training
MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager.
SiteManager Materials Materials Certification. SiteManager Support System SSS Data Base Two Ways To Access Now Useful Information.
SiteManager Materials Materials Certification Process Overview Presented at the Division Auditors Meeting Oklahoma D.O.T. Training Center April 12, 2007.
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
HalTrack 1.0 Session VII-a. halTRACK Web Order Manager halTrack is a product in the halFILE family which provides a Title Company with an Internet presence.
Meanwhile back at the ranch.. Sometimes “more” can present new challenges.
ISO 9000 Quality Standards ISO 9000 describes quality assurance elements in generic terms that can be applied to any business. It treats an enterprise.
TurnKey Project Management Services Capabilities Briefing.
Final/Shipout Inspection Approved for Public Release.
SITEMANAGER Frances J. Hood, P.E. Design/Materials/Construction Engineer Idaho Transportation Department.
11 This document contains DRS Technologies proprietary information. Copyright © 2012 DRS Technologies, Inc. All rights reserved. Halvorsen Parts Order.
SSO SMD – GDF Pocket Guide What is ISO 9000 The ISO 9000 Quality Systems Standard is a series of international standards providing guidance for developing.
Unraveling Web Development PRESENTERS: Bob Nakles and Paras Kaul, George Mason University.
ISO 9000 Certification ISO 9001 and ISO
Auditor Responsibilities January 16, 2014 State Training Webinar 2014 CSP Contract Compliance Audit 1 AD14002.
SQA Work Procedures.
Even More SQA: Work Procedures
NITAAC Customer Support Phone: Website: NITAAC.nih.gov Customer Guide for using the electronic Government.
Fundamentals of ISO.
1111 AS9104/1 and Potential Impacts to Your AS Registration November 16, 2012 Presented by Pete Kucan Director of PRI Registrar Operations.
AASHTO Trnsport SiteManager Materials Management in ALDOT October 15, 2004 Charlie Brown, ALDOT.
Overview and key features.  Each page will be embedded SEO friendly tag  Tags are editable for users.
© 2012 IBM Corporation Rational Insight | Back to Basis Series Documents and Record Control Liu Xue Ning.
Basics of OHSAS Occupational Health & Safety Management System
MURK Presented By Awni Alsous, MURK Engineer 2010.
Company Confidential Registration Management Committee (RMC) What’s Next for Oversight? 1 Other Party (OP) Assessor Workshop Palm Beach Gardens, Florida.
Closing Out a Federal Aid Construction Project Missouri Local Programs How to Close-Out a Federal Aid Construction Project.
Recording Transactions in a General Journal
ZHRC/HTI Financial Management Training Session 9: Stores and Supplies Management.
Training Your Users Introducing new Staff, Students and Employers on the system.
Version Advanced User Training. Instructions This training module contains additional key concepts that are an extension to the concepts in the.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
Integrating As-Built Policies and GIS Maintenance Procedures
Internal Auditing ISO 9001:2015
Guidelines for Simplified Acquisitions Keisha Eldridge March 7, 2007 Level I PIP Presentation.
Presents to Sir Ahmad Tisman Pasha Presenter Shah Rrukh roll#07-22 BIT7th.
Quality Standards ISO:9000 ISO:9000 Quality Systems Under ISO:9000 Quality Systems Under ISO:9000 ISO:14000 ISO:14000 ISO Certification Process ISO Certification.
Complete Ordering System for Promotional Literature and Samples Quick Reference and Training Guide.
Community Finance Division FORMS 1-13 CDBG APPLICATION.
Quality Management Supplier Quality Requirements Clarification Meeting Civil work at Dinaledi Sub Station Presentation By: Mothusi Itumeleng 16 July 2014.
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
ISO :2015 Documentation kit for Accreditation of Certifying Body - by Global Manager Group
1 Introduction to MBProject. 2 Part I: MBProject and how it is used. Part II: What MBProject might do in the future. Also, as-built data collection and.
Requirements of Documents for Quality Management System ISO 9001 Certification.
Part Approval / Compliance Data Submission via Jotform.com
Components of software quality assurance system overview
ISO/IEC
Module 6 Corrective Action Request (CAR) Overview
How to Implement an IG Manufacturing Quality Procedure System
PROCESS FOR EVALUATING THE EQUIVALENCE OF FOREIGN MEAT AND POULTRY FOOD REGULATORY SYSTEMS International Policy Division Food Safety and Inspection.
Definitions and Generic Procedures
ONUR AIR QUALITY DIRECTORATE
Recording Transactions in a General Journal
Michigan Department of Education
Overview of ISO 9001:2015 –Quality Management SysteM
Designers’ Manual Overview and Chapter Contents
Construction Management
The Certified Quality Process Handbook 2nd edition Ch. 1: pp
Administrator of Construction Todd Wilson Senior Project Manager
Product Development Scenario Overview
Management Verifications & Sampling Methods
Witness Assessment AS9104/2A
Records Destruction presented by Records Management
ISO-9001 Quality Management System
UNDERSTANDING FOR STANDARD
Components of software quality assurance system overview
Presentation transcript:

SiteManager Materials Division Auditor Meeting January 26, 2007

The Audit Cycle Say what you do. Say what you do. Do what you say. Do what you say. Auditors check this.

Construction Control Directive Sampling & Testing Requirements Sampling & Testing Requirements 5000 Series Field Acceptance Methods 5000 Series Field Acceptance Methods Approved Products Lists Approved Products Lists Reports Reports

Sampling & Testing Requirements CCD Material Sampling & Testing Requirements defined in SiteManager for Pay Items supersede requirements established in the published Sampling guide…. Material Sampling & Testing Requirements defined in SiteManager for Pay Items supersede requirements established in the published Sampling guide…. Test Methods – (templates)Test Methods – (templates) FrequenciesFrequencies

Sampling & Testing Requirements Customized for a project (contract) OIL – Outstanding Item List OIL – Outstanding Item List Generate Materials Generate Materials Sampling Checklist Sampling Checklist

Sampling & Testing Requirements Material Documentation CCD OIL – Material Acceptance requirements for Pay items on the OIL shall be documented using established Non-SiteManager processes. OIL – Material Acceptance requirements for Pay items on the OIL shall be documented using established Non-SiteManager processes.

Outstanding Item List

Sampling & Testing Requirements Material Documentation CCD Sampling Checklist – Sampling and Testing requirements are satisfied by documenting sample information in a sample record and test results in material test templates. Sampling Checklist – Sampling and Testing requirements are satisfied by documenting sample information in a sample record and test results in material test templates.

Sampling Checklist

Sampling & Testing Requirements Instructions

Policies and Procedures

Quick Reference Guides – QRGs

5000 Series Field Acceptance Methods Materials not sampled and tested on projects Materials not sampled and tested on projects Existing acceptance procedures are fuzzy. Existing acceptance procedures are fuzzy. Utilize SiteManager to track materials Utilize SiteManager to track materials Develop streamlined and meaningful acceptance procedures. Develop streamlined and meaningful acceptance procedures.

5000 Series Field Acceptance Methods CCD Field acceptance methods for materials/products that are pre- delivery (shop) inspected, come from pre-approved stock or source, acceptable by certification, approved listing, field observations, etc. Field acceptance methods for materials/products that are pre- delivery (shop) inspected, come from pre-approved stock or source, acceptable by certification, approved listing, field observations, etc.

5000 Series Field Acceptance Methods How do they work? Common reference: Common reference: Sampling checklist Sampling checklist Web site Web site Template names (test methods) Template names (test methods) Approved Lists Approved Lists

Sampling Checklist

Web Page – Approved List for Hydraulic Cement Web site updated nightly with SiteManager data.

AM5001 SiteManager material test template

Approved list has a link that describes the Acceptance method Link

Description of AM5001 procedure – published on web site.

Reports Sampling checklist Sampling checklist Small quantity material acceptance Small quantity material acceptance Sample information (if a hard copy is needed) Sample information (if a hard copy is needed) IAS Summary IAS Summary A summary of just about any kind of data in SiteManager can be created. What are the needs?

Small Quantity Acceptance Report