1 Administrator of Construction Todd Wilson Senior Project Manager
David Borden Administrator of Construction Todd Wilson Senior Project Manager Public Works - Engineering 2/27/2018

2 Schedules/Timelines Contract Dates Intermediate Completion Substantial Completion Final Completion NTP Contractor Schedule

3 General Conditions Rules that we all abide by Owner Engineer RPR
Contractor

4 RPR Manual POLICY AND PROCEDURES MANUAL FOR INSPECTION OF LOCALLY FUNDED CONSTRUCTION PROJECTS New Version Released Today! Keep Readily Available

5 Gather Documents RPR Manual Chapter 2: Project Initiation
Scope of Work – Engineer’s Quantity Calcs, Geotechnical Report, Cores Bid Tabs Post-Bids, Contractor’s executed Agreement Contractor’s PO & NTP Key Project Personnel

6 Pre-Construction Conference
RPR Manual Chapter 4: Pre-Construciton Meeting RPR to conduct meeting Pre-Con Agenda from DPW PM Sign-In Sheet Distribute Meeting Minutes

7 Progress Meetings Typically Bi-Weekly Schedule Change Order Status
Issues/concerns

8 Dailies RPR Manual – Chapter 6 Template for approval by DPW PM
Accurate quantities Where? Stationing, offsets, plan page references Narrative

9 Capitol Outputs Obtain from DPW PM Tell the story
Capitol outputs updated upon project completion

10 Daily Progressive Record
Keep Excel workbook Record for each pay item Accurate Dates and Quantities

11 Weekly Reports Contract Completion Dates Contract Costs to date
Summary of work for previous week Summary of work proposed for next week Few photos Include previous week’s dailies

12 Pre/Post Photos Before and After, side-by-side Daily Activities
MOT Setup Damages

13 30th Street

14 Arlington Ave

15 I.A.S. Testing RPR Manual – Chapter 7 Frequency Manual on DPW website
I.A.S Testing Firm = “7NT” Contact Shawn Heilers

16 Maintenance of Traffic
RPR Manual – Chapter 8 IMUTCD Check Daily Notify Contractor of Deficiencies Pedestrians Flagging Operations Permit Requirements

17 Pay Estimates RPR Manual – Chapter 9
Contractor to provide pay estimate Verify quantities and unit prices All information on pay application PO # Invoice # Invoice Date Invoice Period Sub-Consultant Payment Report

18 Change Order Process RPR Manual – Chapter 10 Field Order
RFI (Request for Informaiton) From Contractor Keep RFI Submittal Log Initial Interpretation - RPR RFP (Request for Proposal) WDC (Work Directive Change) - template Change Order - template

19 Substantial Completion
All Pay Items Completed Contractor requests Substantial Completion Punchlist attached to Certificate of Substaintial Completion Days to complete Punchlist

20 Final Walk-through Contractor DPW RPR Designer Construction PM
Construction Administrator Design PM RPR Designer

21 Final Construction Record
Typical 45 days after Final Completion Date Project File Tree – RPR Manual Chapter 5 Electronic Copy – Flash Drive Red Line As-Builts Pipe and Structure Elevations pdf editor

22

23

24 Questions?