Group New Projects Related to Decommissioning. 29 th May 2008 KNPP Richard Benbow – Head of Kozloduy PMU.

Slides:



Advertisements
Similar presentations
Revised Environmental Site Assessment Guidelines & Asbestos Inspection Guidelines for Bridges.
Advertisements

Background Presenters Work done in preparation for WHS changes
Decommissioning Plan for Kozloduy Nuclear Power Plant Units 1 & 2 E
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Scoping.
October In May 2000, Walkerton’s drinking water system became contaminated with deadly bacteria, primarily Escherichia coli O157:H7.1 Seven people.
Contractor Safety Management
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Licensing of Nuclear Power Plants in Pakistan
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Combined Heat and Power and Air Quality - Guidance for Local Authorities Ed Dearnley Policy Officer.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Nuclear program of Lithuania Dr. Vidas Paulikas, Radiation Protection Department VATESI Visaginas, 29 June 2009.
Decommissioning Nuclear Reactors. Background Before a company decides to close it’s power reactors the facility must be put in to a state that it no longer.
MODULE “STRATEGY DEVELOPMENT”
Bapetco NORM Control Case Study IDENTIFY ASSESS CONTROL & RECOVERY.
1 CHAPTER 9 MATERIAL MANAGEMENT Demeulemeester Yves BR3 Dismantling project SCKCEN.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
Safety Analysis Report for Decommissioning of KNPP Units 1 and 2 A
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
National Radioactive Waste Disposal Institute Bill Presentation to the NCOP Select Committee on Economic and Foreign Affairs October 2008.
TEAM 1 NONAMECOUNTRY 1SU RUI (LEADER)CHINA 2TENG IYU LIN (PRESENTER)MALAYSIA 3MUHAMMAD TARIQ AZIZ (RAPPORTEUR)PAKISTAN 4NORAISHAH PUNGUTMALAYSIA 5MOHAMMAD.
ERT 417 WASTE TREATMENT IN BIOPROCESS INDUSTRY W ASTE M INIMIZATION & M ANAGEMENT.
MODULE “PROJECT MANAGEMENT AND CONTROL” RADIATION PROTECTION SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Republic of Moldova.
MODULE “COST ESTIMATION, CALCULATION AND COST CONTROL” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da.
Important informations
Group Presentation to 27 th - 29 th May 2009 International Nuclear Forum BULGARIAN NUCLEAR ENERGY – NATIONAL, REGIONAL AND WORLD ENERGY SAFETY.
International Atomic Energy Agency IX.4.4. Pre-disposal waste management Safety Standards.
Clean-up of former nuclear sites and the role of the Planning regime Jim Cochrane.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Phare 2003 Sector: Economic and Social Cohesion Title: Water Supply and sewerage in tourism and resort settlements.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
MODULE “PROJECT MANAGEMENT AND CONTROL” WASTE MANAGEMENT SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
1 BULATOM - SUPPORT TO ENERGY POLICY OF GOVERNMENT OF ARMENIA SUPPORT TO ENERGY POLICY OF GOVERNMENT OF ARMENIA International Nuclear Forum Bulgarian Nuclear.
1 A Consultancy on management of large amounts of radioactive waste after an emergency situation ~ Experience on aftermath of Fukushima Daiichi NPS accident.
PH 8.01/99 - Seminar, Brussels, 9 November 2005 PH 8.01/99 – Seminar on “Dissemination of PHARE projects description and results” Overview of BG PHARE.
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
Calder Hall Sellafield Decommissioning Martin Adam Heriot-Watt Edinburgh 2008.
Ukraine Petro Nakhaba All-Ukrainian Public Organization “ Chysta Khvylya ” Deputy Head Kyiv, Ukraine Contaminated Sites Management Joint UMOE-DEPA Project.
F & A Advisory Group. Background Over 80 labs vacated as part to the ISC move and another 14 labs will be moving to University Hall These labs and ancillary.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
Plan Waste Assessment MWM01A. What is the purpose of a waste assessment?  The main aims of a waste assessment are to:  Identify each waste stream on.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
International Atomic Energy Agency V. Nys Definition and practical application of demonstration of operational and long-term safety for predisposal RWM.
Nassau County Disaster Debris Management Plan Debris Planning Team Meeting 1, April 24.
State Enterprise Radioactive Waste Presented by: Momchil Kazakov – Chief Technologist SD “Decommissioning 1-4 unit”, SERAW 15–17 June 2016 Golden Sands.
Planning and Realisation of Wind Farms
Preliminary Decommissioning Plan for the Canadian Light Source
Communication and Consultation with Interested Parties by the RB
RCF Plenary Session 21 September 2018
4th ISOE European Workshop on Occupational Exposure Management at NPPs Lyon, France, March 2004 Kirsi Alm-Lytz Radiation and Nuclear Safety Authority.
Operationalizing Export Certification and Regionalization Programmes
Legal and Regulatory Framework for Nuclear Installations in IRAN
Presentation transcript:

Group New Projects Related to Decommissioning. 29 th May 2008 KNPP Richard Benbow – Head of Kozloduy PMU

Group Contents  Background for PMU Establishment  New Projects  Summary

Group Background for PMU Establishment  Phare project (BG ) established basis for Decommissioning strategy and identified relevant supporting projects (final report December 2001)  Initial Projects for PMU scope were obtained from the Phare recommendations  IFT for PMU issued June 2002, Contract placed January 2003 between KNPP and a Consortium of British Nuclear Group, Electricité de France, supported by ENPRO Consult  Phase I completed April 2006, contract extension granted for additional Phase II work till March 2007 with the Consortium.  Phase III extension granted in April 2007, till March 2008, with Project Services supported by ENPRO Consult.  Phase IV extension granted in April 2008 for work till March 2011with VT Nuclear Services supported by ENPRO Consult

Group Project 11 (a, b & c) Evaluation of the Radiological Inventory for Units 1 to 4 The project has now been split into 3 parts P11a - Initially equipment will be provided for KNPP to gather all data necessary to establish an inventory. P11b - A feasibility study will be carried out to ensure an optimal packing regime for all of the wastes is developed P11c - A specialist consultant will be engaged to calculate the activation of components in the reactor pressure vessel

Group Project 12 Supply of Size Reduction and Decontamination Workshops Project 12 is to provide a range of facilities and equipment for size reducing and decontaminating dismantled materials from the Turbine Halls and Auxiliary Buildings at Kozloduy NPP Units 1-4. The proposed facilities are envisaged to be used also for size reduction and decontamination of the dismantled materials from the other plant areas, including the Reactor Buildings. Tenders are currently being invited for this project

Group 13. Dismantling Tools and Equipment Background The Decommissioning and Dismantling of the reactors and ancillary plant will require tools and equipment that are not normally used at a reactor site. This project is to procure a range of tools and equipment for KNPP to use in the dismantling of Units 1-4. Tenders will be issued over the next 3 months

Group 15. Heat Generation Plant Background An additional source of steam for district heating for the town of Kozloduy will be required after the physical separation of the infrastructures of Units 1-4, to cover those situations when Units 5 and 6 are not in operation. This steam is also necessary for the processing of liquid radioactive waste and can be used to accelerate the restart of Units 5 or 6. Smaller quantities of steam are also necessary for processes like demineralised water production and local area heating.

Group Project 15 Heat Generation Plant Current proposal is for the supply of a steam and hot water generation plant fuelled by gas on the Kozloduy site. Site location is being finalised prior to Tendering.

Group Project 16 – Environmental Assessment for Decommissioning This project is to produce an Environmental Impact Assessment (EIA) for the Decommissioning of Units 1 and 2 According to Bulgarian legislation, the EIA must be completed by an independent Contractor Expressions of Interest are currently being sought from interested contractors

Group 19. Decay Storage Site for Transitional RAW Background  During the dismantling of the Turbine Hall and Auxiliary Buildings, a significant quantity of category 1 radioactive waste (RAW) will be generated. This RAW can be released from regulatory control after appropriate treatment and/or temporary storage for a period not longer than 5 years.  The objective of this project is to provide a site for the temporary storage of transitional radioactive waste for five years to allow sufficient radioactive decay to occur to permit subsequent controlled release.  This storage site will be situated on the KNPP site.

Group 20. Information Centres for Decommissioning. Background  The existing KNPP Information Centre is focussed on operations at Kozloduy. As the site moves into a decommissioning regime changes are needed to reflect this change in status, and the new operations and procedures that will be introduced to the site as a result.  The addition of an Information Centre in the House of Culture will allow free access to the decommissioning displays so that members of the public can have access.  The Informational displays in KNPP offices in Sofia will display the decommissioning activities so that key stakeholders may view.

Group 21. Storage Site for Conventional Waste from Decommissioning. Background During the dismantling of Turbine Hall and Auxiliary Building a significant quantity of solid waste will be generated and these wastes will be released of regulatory control. These wastes will need to be stored temporarily whilst waiting for removal. This storage facility will be for clean waste, but must comply with Bulgarian regulations for waste. The site may be inside or outside the existing KNPP boundary.

Group 23.Inventory, Treatment and Conditioning of Contaminated Soil. Background This project is for the provision of technology for both determining the inventory, and subsequent processing and conditioning of contaminated soil at the KNPP site. The project will be carried out in a number of key stages:  Procurement of the equipment for the development of the inventory.  Site surveying for the assessment of contaminated soils.  Development of a strategy for the treatment and conditioning.  Procurement of the equipment for treatment and conditioning of contaminated soil.  Treatment of the soil  Continued monitoring during the stages of decommissioning

Group 24. Concrete Core Sampling Analysis Background  The purpose of this project is the preliminary investigations on concrete in the buildings of KNPP Units The main objective is to obtain information about the contamination of the concrete of buildings (level of contamination, penetration depth, nuclide spectrum).  For this concrete and epoxy resin coating samples must be taken and evaluated (gamma-spectrometrically and partly total alpha). These data are necessary for the planning of the decontamination measures and free release measurements before the demolition or conventional use of buildings.

Group 25.Asbestos Removal Equipment. Background  This project is for the supply of equipment and materials for KNPP personnel to safely remove and store asbestos material from the Turbine Hall and other buildings during decommissioning. Asbestos represents a significant hazard to decommissioning personnel during the dismantling of redundant equipment, systems, and structures. Asbestos removal has been recognised in the Decommissioning Plan as a necessary early stage in dismantling activities. In addition a feasibility study will be carried out for the processing of asbestos through the HVRF

Group 26.Demolition Equipment. Background  This project is for the supply of heavy duty equipment for the demolition and cutting of reinforced internal concrete structures within the Turbine Hall, Reactor Buildings, and Auxiliary Buildings at KNPP Units 1-4 and other possible redundant structures during decommissioning.  Demolition of the external structures of the Turbine Hall, Reactor Buildings, and Auxiliary Buildings is outside the scope of the decommissioning strategy for the site.

Group Summary  The PMU has been established in support of the KNPP Decommissioning Department.  All of the Infrastructure Projects associated with Decommissioning have been identified and are being managed through the EBRD Procurement Process.  The status of the twenty seven projects is as follows:

Group Summary  Information on the projects and the PMU can be obtained through the following contact points: –EBRD Web site: –KNPP / PMU Web site: –PMU address: Projects in approval process (PIS)8 Project documentation being prepared5 Projects being tendered3 Projects in progress/contracted6 Projects completed5 Total27