Cultural Heritage in REGional NETworks REGNET Report on Content Group Meeting Extended Project Management Group Meeting 2002-06-26.

Slides:



Advertisements
Similar presentations
1 September 2010, Rome, Italy European Collected Library of Artistic Performance First requirements meeting Lotte Belice Baltussen TEL: +31 (0)
Advertisements

Cultural Heritage in REGional NETworks REGNET Market Preparation – D6.
Cultural Heritage in REGional NETworks REGNET Quality Assurance – D14.
Cultural Heritage in REGional NETworks REGNET The REGNET Demonstration (Trial service) – D10.
Cultural Heritage in REGional NETworks REGNET January 2002PMG03 Barcelona – Management Issues 2 Management Issues 0ctober 2001 – January 2002.
Cultural Heritage in REGional NETworks REGNET Validation and Preparation of Demonstration – D7.
Carlo DonzellaStatus Task 2.51 Status of Task 2.5 Carlo Donzella - TINC Barcelona, 28/01/02.
Cultural Heritage in REGional NETworks REGNET Project Management and Coordination.
Cultural Heritage in REGional NETworks REGNET January 2002PMG03 Barcelona - WP7 Status 2 WP 7 - Management Task 7.1 – Project Management Project.
Cultural Heritage in REGional NETworks REGNET Extended Project Group Meeting Den Haag,
Cultural Heritage in REGional NETworks REGNET Implementation of the version 2 of the REGNET-Demonstrator – D8 Implementation of the version 2 of the REGNET-Demonstrator.
Status Report for WP 1.1 and WP 1.2 Milestones, Results & Actual Work Josef Herget/Silke Grossmann (IMAC), Vic Haesaerts(TARX) Project Management Group.
Cultural Heritage in REGional NETworks REGNET Workplan Adherence.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET. June 2002REGNET Project 2 WP6 – Dissemination AIT ONB SR IMAC SUL TARX MUS MOT SPAC CC IAT ICCS ZEUS VALT.
Cultural Heritage in REGional NETworks REGNET Review Meeting (REV-01-01), , Brussels.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 WP7 - Project Management Software Development Plan Increment.
Florence Meeting, September 2001 Regnet CULTURAL HERITAGE IN REGIONAL NETWORKS Interim Report 6.1 – Information Dissemination D 13 – Information.
Content Group Meeting Josef Herget/Silke Grossmann (IMAC) Project Team Group Meeting
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 WP6 – Dissemination AIT ONB SR IMAC SUL TARX MUS MOT SPAC CC.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 Definition of supported Business Functions BUSINESS PROCESS MODELLING.
Cultural Heritage in REGional NETworks REGNET T3.2: Preparation of the demonstration.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 WP 5 - Overview Development of a Technological Implementation.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group Part 1: Usability Testing.
Cultural Heritage in REGional NETworks REGNET. July 2002Project presentation REGNET 2 Market Engineering - Status of work 1.History of 2.5 – Objectives.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET WP2: Implementation of the System and Preparation of Services and Product Generation Structure and deliverables.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET Status of Task 2.1 Project Management Group Meeting
Content Group Meeting Main Results & To Dos Project Team Group Meeting
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET. July 2002Project presentation REGNET 2 Project Management and Co-ordination Overall project status: The.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 Task 1.7: Identification of Market segments and User groups WP1:
Cultural Heritage in REGional NETworks REGNET. July 2002Project presentation REGNET 2 WP 2 – Task 2.3 Setup of the Legal Framework The REGNET non-profit.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group Part 2: Functional Testing.
Cultural Heritage in REGional NETworks REGNET T2.4: Business Process Re-engineering.
Cultural Heritage in REGional NETworks REGNET. 4. July 2002REV02 Luxembourg – Management Issues 2 Management Issues January 2002 – June 2002 Reporting.
Cultural Heritage in REGional NETworks REGNET. July 2002Project presentation REGNET 2 WP6 – Dissemination AIT ONB SR IMAC SUL TARX MUS MOT SPAC CC IAT.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group Results, open issues, workplan
07/06/2001ZEUS Consulting SA1 Title: Work Package 1 Work Plan Status Anastasia Pagoulatou.
February Extended Project Group Meeting Working Sessions Practical planning Session I: Thursday, 16: :30 Session II: Friday, 9: :30.
Cultural Heritage in REGional NETworks REGNET Den Haag Meeting (RN-PTG014) 21-22/11/2002.
Cultural Heritage in REGional NETworks REGNET WP 4 Demonstration, Assessment and Evaluation.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET. June 2002ONB / EPMG REGNET Sofia 2 ONB Status report Current content production Data (to be) delivered.
Cultural Heritage in REGional NETworks REGNET Status of WP 2 / WP 3 Extended Project Management Group Meeting
Cultural Heritage in REGional NETworks REGNET June 2002PMG04 Sofia – Management Issues 2 Management Issues January 2002 – June 2002 Reporting.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET. July 2002Project presentation REGNET 2 WP 7 - Management Task 7.1 – Project Management Task 7.2 – Quality.
Cultural Heritage in REGional NETworks REGNET REGNET System Operation – D9.
Cultural Heritage in REGional NETworks REGNET June 2002PMG04 Sofia - T2.3 Status 2 Development in Task 2.3 Refinement of REGNET partnership.
Cultural Heritage in REGional NETworks REGNET Technological Implementation Plan – D12.
Cultural Heritage in REGional NETworks REGNET Task 2.2 Implementation of REGNET System Version 1.
Cultural Heritage in REGional NETworks REGNET Trial Service and Recommendations – D11.
GSMP Franchise Working Session July 18, ©2005 GS1 2 GSMP: The Global Collaborative Forum Goal To enhance the GSMP Franchise Process and deliver.
Technical System Options
WP3. Evaluation, Monitoring and Quality Plan Dr. Luis Sobrado 27 th May 2011.
Project Scope Management
8 th IG-Meeting Coordinated Auctioning, Auction Office and Organisational Issues Christian Todem Vienna
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Further.
CoRe 2 Final meeting Introduction agenda Jenneke Lokhoff 12 & 13 August.
ETIS+: European Transport Policy Information System - Development and Implementation of Data Collection Methodology for EU Transport Modelling Funded by.
Module 12 WSP quality assurance tool 1. Module 12 WSP quality assurance tool Session structure Introduction About the tool Using the tool Supporting materials.
James A. Senn’s Information Technology, 3rd Edition
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
1st NRC Meeting, October 2006, Amsterdam 1 ICCS 2009 Field Operations.
Cultural Heritage in REGional NETworks REGNET Objectives and Progress (D15)
3rd NRC Meeting, 9-12 June 2008, Windsor ICCS 2009 Main Survey Field Operations.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 Work Package 1 Title: ‘Analysis of the State of the Art and Development.
HySafe Coordination Committee Meeting, October 18, 2005, Karlsruhe Status of WP5- The Hydrogen Incident and Accident Database Update October 2005 Christian.
Presentation transcript:

Cultural Heritage in REGional NETworks REGNET Report on Content Group Meeting Extended Project Management Group Meeting

June 2002REGNET Status of work in WP 2 /3 (IMAC) 2 Working plan for the meeting Validation: Introduction of tools for testing (forms, questionnaires, software tools), agreement on test criteria, task assignment and scheduling. Definition of next steps. Preparation of data: Discussing and solving open issues regarding the data entry and data preparation for the REGNET demonstrator. Updated view of the data available (status reporting). (Further) Content Collection Discussion the necessity of further content (for the portal), responsibilities and content collection plan. Internationalization aspects. Discussion & working groups (Tuesday) Finalising concept and tools. Starting point for the validation. First tests? Feedback? Presentations & discussion (Monday) Preparation of Review Meeting and next report (2)

June 2002REGNET Status of work in WP 2 /3 (IMAC) 3 Report on Content Group Meeting 1. Available Content (quantitative dimensions) Object.. Themes.. Shop Items.. Status reporting could not be finished in Sofia. All presentations will be uploaded to the server in order to give each partner the possibility to inform about the status and data available!

June 2002REGNET Status of work in WP 2 /3 (IMAC) 4 2. Data Entry Issues Report on Content Group Meeting Content production should be stopped [Minimum standard: not only in native language, but in english also - this must be done and delivered] Available data will be processed in the way already started [Export, mapping, conversion] => All partners will get their own databases for testing (Content integrity and quality check) and usage (Start at the end of June!)

June 2002REGNET Status of work in WP 2 /3 (IMAC) 5 2. Data Entry Issues Report on Content Group Meeting Future scenarios: Solutions for online and offline data entry will be offered by the CSCs (parallel) to support different scenarios: - upload - edit records - local management (offline templates, maybe also databases, e. g. MySQL) This is a task not yet fully completed, tools must be refined in order to find a convenient solution.

June 2002REGNET Status of work in WP 2 /3 (IMAC) 6 3. Feedback to the tools (demonstrated during 1st/2nd day) Report on Content Group Meeting Data Entry Intensive discussion mainly about individual features (how it functions, is it possible?,...) and consequently a kind of further requirement definition. First requirements could be fixed (validation procedures etc.) but 1. Functionality must be tested intensively [CPs] 2. Usability must be tested intensively [CP expert group] 3. Synchronization is needed especially for the themes template (which is not an individual application, but a tool by used by each partner in the same way) [TARX, AIT,...]

June 2002REGNET Status of work in WP 2 /3 (IMAC) 7 3. Feedback to the tools (demonstrated during 1st/2nd day) Report on Content Group Meeting Search & Retrieval (Multi-Site-Search) Further testing necessary for detailed feedback E-Publishing Most of the comments were related to the interface & output: - The use for content providers became not transparent (How could products look like? Different outputs are necessary, e. g. virtual galleries, print products, presentations) - Interface (& speed) must be improved - Editing facilities must be enhanced: actually the publisher has no control Proposal/Agreement: Further effort to develop an interface for the integration of external applications (optional for CPs)

June 2002REGNET Status of work in WP 2 /3 (IMAC) 8 Report on Content Group Meeting 4. Validation schedule: Start on 1st of July 2002 ! Step-by-Step approach Sofia Meeting Test finalising Functional tests Usability tests (heuristic, scenarios) 06/28/0207/05/0207/19/0215/08/2002 Which functionality is available ? Content (integrity and quality) tests Red light: external solution Orange light:improvements necessary/possible before carrying out further tests Green light: go for usability tests

June 2002REGNET Status of work in WP 2 /3 (IMAC) 9 Strategy for pragmactic testing High-level testing - functionality available or not? [Could be done in Sofia?] If yes, using test cases already available? If no test cases available, they must be modelled 4. Validation approach Discussion about procedure is still needed (VALT, IMAC, MOT). Report on Content Group Meeting

June 2002REGNET Status of work in WP 2 /3 (IMAC) 10 Report on Content Group Meeting Already assigned tasks: E-Shop/Catalogue Management/Auction System MUS, NRM, LMG, GRAN Topic Map Generator, Viewer MECH, CC, ALI, GRAN Data Generation (Entry) SUL, ONB, KVA Search & Retrieval ICCS, ONB, MECH, CC Portal ICCS, KVA, ALI Multilinguality TARX, MUS, IAT For functional tests, scenario definition, translation, card sorting experiments

June 2002REGNET Status of work in WP 2 /3 (IMAC) 11 Report on Content Group Meeting Already assigned tasks: Heuristic Tests ALI, CC, KVA Language Check (English) IAT, ONB, TARX, MUS Expert Groups Validation PM Methodology Coordination Reporting IMAC Responsibilities for generating new content must be assigned.

June 2002REGNET Status of work in WP 2 /3 (IMAC) Validation - What is needed! Report on Content Group Meeting Stop & Go- decision Stop of technical development and also of content production! Available content must be processed firstly! Definitive access information [URL, Login, Password] Documentation ! In order to get familar with the tools

June 2002REGNET Status of work in WP 2 /3 (IMAC) To answer occured questions... Report on Content Group Meeting Language check Could be added to the content quality assurance sheet Should be carried out for the portal (structure) by an expert group (not only the individual partners for their languages) Check the language(s) in context! Content collection plan Procedures to assure the gathering and integration of new content for the portal: gathering could be done with the help of the content tracking sheet. Integrating - is a technical problem.

June 2002REGNET Status of work in WP 2 /3 (IMAC) Other Issues Report on Content Group Meeting Next Meeting Content Provider Meeting September 2002 Mechelen (Belgium) Carry out missing tests (offline) End of validation phase (?)- Reporting and critical review

June 2002REGNET Status of work in WP 2 /3 (IMAC) Reporting: D7 Validation of the REGNET System operation & Preparation of the demonstration phase Report on Content Group Meeting Part 1: Validation 1. Validation process 2. Description of user groups 3. Methodology of the validation process 4. Results of the validation process Due until Part 2: Preparation of Demonstration Phase 1. Set up of legal framework 2. Set up of the technical infrastructure 3. Set up of databases, services, products 4. Test of relevant business processes 5. Training of core user groups 6. Marketing efforts IMAC WP 3.1 VALT WP 3.2 First version possible until ?

June 2002REGNET Status of work in WP 2 /3 (IMAC) Review Meeting Planning: Content related issues WP 2.1 Presentation of content cases (30 minutes) 1. Introduction - Tasks, work done, status (IMAC) 10 minutes 2. Tools for (offline) data entry (TARX) 5 minutes 3. Topic map structuring (TARX) 5 minutes 4. Content Cases 1 - SUL 5. Content Cases 2 - TARX (MECH/GRAN) 6. Content Cases 3 - ICCS Technical partners should prepare demos using real data. Already fixed for E-Shop (NRM, LMG, GRAN) [ZEUS] Final preparation (after lunch) Report on Content Group Meeting