Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.

Slides:



Advertisements
Similar presentations
Update on FCPS Construction/Renovation Projects July 2009.
Advertisements

Wendover Renovation Presentation Presentation Overview Renovation Stages Before Now After How you will be affected Questions/Concerns.
Update on FCPS Construction/Renovation Projects May 2009.
JUNO BEACH PEACE GARDEN PROPOSAL April 15, 2011 Presented by Terron & Megan.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Summer DEPARTMENT ORGANIZATION Capital Improvement Program Capital Improvement Program Maintenance Custodial Environmental Management 2.3 millionsquare.
Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat.
Edna Maguire School Modernization - Phase 1 Summer 2012.
Pleasanton ISD Long-Range Master Plan for PreK-12 October 2014 Board of Trustees Meeting.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Update on FCPS Construction/Renovation Projects August 2009.
Public Restroom Facilities Public Restroom Facility Goal Goal Objective Objective Research Research.
Bryan Station Middle – Renovation Architect: Clotfelter-Samokar Architects General Contractor: Preston Construction Group Substantial Completion Date:August,
Herndon Station - North Pavilion Construction Town of Herndon – Town Council August 6, 2014.
Newark CSD Phase II Capital Improvement Project Board of Education Report August 2013.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Boren School Preparing an existing wall to receive structural improvements.
School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013 Castallo and Silky Education Consultants.
Alliant Energy Field Renovation. September 2005 Work area blocked off Pitching mound is flattened.
Futureview Solar Solutions Elysburg, Pa. Call
Bond Proposal May 12,  I.E.Clark Fine Arts Center – Problem – Consistent separation of walls and foundation over the years. Summary – The Fine.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
Blue Prints.
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Dan Packer Construction Management Senior Thesis April 16, 2002
Mary Lin Elementary School 586 Candler Park Drive Phasing Plan March 25, 2010.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Northwest ISD Lakeview Elementary School Additions and Renovations Lakeview Elementary School Additions and Renovations
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Looking east to Park Street Old tennis court area, looking south.
Building Plans.
FORT CALHOUN HIGH SCHOOL ADDITION/RENOVATION PROJECT PICTURES ALONG WITH DESCRIPTIONS.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. November 5, 2007 Prepared.
BUILDING UPDATE AUGUST 23,2014. BUILDING “A” NORTHEAST VIEW.
Affordable housing project
Capital Reserves. What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs – Stormwater pond repair,
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
F ACILITIES, P LANNING, AND C ONSTRUCTION December 14, 2015 – Monthly Construction Report.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Watch University Grow March 2008 Construction continues on University Hospital’s new Cardiovascular Center, a four-story, 199,000-square- foot facility.
SITE/PLOT PLANS APPLICATIONS OF TECHNOLOGY. DESIGNING A BUILDING ON A SITE Architects must consider the following about a site when designing a building.
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
South Greenville Recreation Center and Park Master Plan.
ITEM 9B Authorize a Commercial Developer Agreement with Keller Watermere, L.P., for South Village at Watermere, located south of West Southlake Boulevard.
Entrance/Exit onto West Grand Avenue 1 st Church of the Nazarene is the completed building at the top of the picture.
Building Committee Presentation March 03, MAIN ENTRANCE.
White Pigeon Community Schools
Bond Oversight Committee
Addition of Fire Alarm system. None existing.
Charlotte Douglas International Airport
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Environmental Assessment
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
HIGH SCHOOL ADDITIONS AND MODIFICATIONS
Dr. Joseph Meloche Superintendent of Schools Mrs
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT February 2017 Fast Facts
Progress Report 11/10/11.
INDUSTRIAL / COMMERCIAL Facility For Lease
The sport hall.
HISD Educational Learning Center STAFF PARKING Yellow Tag LOT
PROPOSED FACILITIES REFERENDUM
At ridge height for family room
Minuteman Vocational Technical Regional High School Progress
21st Century School Buildings Plan
Presentation transcript:

Architect Drawing of New Entrance

Location Location of Phase II Construction Project – Old tennis courts west of the existing building.

Location View from the bus barn.

Location Fenced in with temporary access road constructed on old track.

Building Footings are poured for new addition.

Utilities Sanitary sewer line connected.

Utilities Electrical lines connected.

Utilities Water line installed.

Parking House being moved to provide more parking.

Parking Additional parking will be located east of the maintenance building and existing tennis courts.

Building Construction begins on new band room walls.

Building Band room walls and hallway to existing building.

Building Pre-cast walls for new gym arrive and are unloaded.

Building Pre-cast walls being installed.

Building Pre-cast walls being installed.

Building Pre-cast walls.

Building Pre-cast walls viewed from the north.

Building Columns for front entrance being installed.

Building Roof trusses being installed.

Building Roof trusses being installed.

Building Roof trusses being installed.

Building Roof trusses installed.

Building View from the west on July 15 th.

New Tennis Court Location Three new tennis courts will be constructed west of the existing tennis courts.

4 Stall Garage 4 stall garage needs to be moved for construction of 3 new tennis courts west of existing courts.

4 Stall Garage Site cleaned up and prepared for paving of new slab and return of 4 stall.

4 Stall Garage Site prepared and ready for concrete.

New HS Restrooms The existing art room demo in preparation for new restrooms in the ninth grade hallway.

Hallway to New Addition and Storage Room Wall constructed in old chorus room to divide into hallway and storage space.