Presentation is loading. Please wait.

Presentation is loading. Please wait.

Edna Maguire School Modernization - Phase 1 Summer 2012.

Similar presentations


Presentation on theme: "Edna Maguire School Modernization - Phase 1 Summer 2012."— Presentation transcript:

1 Edna Maguire School Modernization - Phase 1 Summer 2012

2 Interim school Administrative office in leased portable Before After Old Administrative office

3 New parking lot, Interim Administrative Office in leased portable, construction fencing around active construction site of new campus Before After Old Administrative office, driveway, and leased pre-school

4 Interim school with leased portables, construction fencing around active construction site of new campus, warehouse demolished Before After Old parking lot, portable classroom, and warehouse

5 Construction continues on new campus Before After Old Campus

6 Removed warehouse to build interim school Before After Old parking lot and warehouse

7 New electrical transformer, gas service, driveway and interim Administrative offices, teacher’s workroom and restrooms Before After Old electrical transformer, portable classrooms, driveway, and leased pre-school

8 Leased classroom, new walkway, temporary railing, and new entry driveway Before After Leased classroom, and pedestrian entrance

9 Maintenance shop, interim school, and new school under construction in the background Before After Maintenance Shop, parking lot, and old school in the background

10 Tenant rental space, and warehouse removed Before After Tenant rental space, warehouse

11 Interim Classrooms with Emergency Vehicle Access Before After Alto Field


Download ppt "Edna Maguire School Modernization - Phase 1 Summer 2012."

Similar presentations


Ads by Google