Alliant Energy Field Renovation. September 2005 Work area blocked off Pitching mound is flattened.

Similar presentations


Presentation on theme: "Alliant Energy Field Renovation. September 2005 Work area blocked off Pitching mound is flattened."— Presentation transcript:

1 Alliant Energy Field Renovation

2

3

4

5 September 2005 Work area blocked off Pitching mound is flattened

6 September 2005 Exterior wall removed on 6 th Ave. North Field is removed

7 September 2005 Future site of the berm Center field is removed and leveled

8 September 2005 Hot Box is demolished 3 rd Base Concession trailer removed

9 October 2005 View from Riverview Drive Field is level

10 October 2005 Removal of field drains Crushed stone pillars for foundation

11 October 2005 Irrigation lines laid out Future site of Baseball Office

12 October 2005 Trenches for drainage tiles Drainage coils laid out

13 October 2005 Field lay out for drainage tiles

14 November 2005 Parking lot entrance Aerial view of Picnic Garden

15 November 2005 Right Field demolition and construction Infield sod started

16 November 2005 Sod installation and first watering First snowfall on field

17 November 2005 Sod installation complete Drainage installation continued

18 December 2005 Continued work on Grill / Picnic Garden Foundation of Baseball Office

19 December 2005 Berm wall constructed Walls for Clubhouse / Batting Tunnel

20 December 2005 Continued construction on Clubhouse / Batting Tunnel

21 December 2005 Blocks being laid for Baseball Office View towards Left Field

22 January 2006 Baseball Office work continues Root growth on sod

23 January 2006 Berm wall construction continues Future expansion for Lumber Lounge

24 January 2006 Baseball Office roof installed Lumber Lounge expansion continues

25 January 2006 Front Entrance formed View from home plate to Right Field

26 January 2006 View from berm to Picnic Garden Clubhouse construction continues

27 January 2005 Lumber Lounge expansion continues

28 January 2006 Steps and ramp to Picnic Garden poured Inside the Baseball Office

29 January 2006 Front Entrance and Baseball Office construction continued

30 February 2006 Lumber Lounge expansion continued Grill being painted

31 February 2006 Front Entrance and Baseball Office construction continued

32 February 2006 Ground being prepared for cement

33 February 2006 Lumber Lounge expansion continues Front Entrance construction continues

34 February 2006 Grill stucco completed Concrete walkway to Picnic Pavilion poured

35 February 2006 Lumber Lounge expansion continued Sod taking shape

36 February 2006 Concourse cement poured Unique Left Field configuration

37 February 2006 Baseball Office wall construction 3 rd Base Concession remodeling

38 February 2006 Picnic Pavilion construction begins Picnic Garden cement poured

39 February 2006 Aerial of Picnic Garden Aerial of Baseball Office

40 February 2006 Aerial of Infield and Left Field Lumber Lounge expansion continues

41 March 2006 Stucco work completed on Front Entrance and Baseball Office

42 March 2006 Fence along home bullpen started Right Field wall installation

43 March 2006 1 st Base Concourse fence started Lumber Lounge expansion continued

44 March 2006 Lumber Lounge expansion continued

45 March 2006 Outfield wall construction Lumber Lounge expansion continued

46 March 2006 Front Entrance gates installed 1 st Base Concourse cement completed

47 March 2006 Outfield wall construction continued

48 March 2006 Lumber Lounge expansion near completion

49 March 2006 Clubhouse carpet installed

50 March 2006 Batting Tunnel near completion Baseball Office near completion

51 April 2006 Box seats removed

52 April 2006 Score board removed New mesh banner installed

53 April 2006 View of berm from Picnic Garden New box seats installed

54 April 2006 Front Entrance Parking lot entrance from 6 th Ave. North

55 April 2006 Front Entrance Locker installation in Clubhouse

56 April 2006 Landscaping started New windows in old Baseball Office

57 April 2006 Front Entrance completed New scoreboard installed

58 April 2006 View from bermPicnic Garden complete

59 April 2006 Field ready to go Lumber Lounge expansion completed

60 April 2006 1 st Base Concourse Front Entrance

61 Opening Day

62

63

64

65

66

67

68

69

70

71

72 Club House Player Locker Room

73 Club House Player Locker Room

74 Club House Coaches Office

75 Club House Managers Office Trainers Room

76 Club House Training Room / Weight Room

77 Batting Tunnel

78

79

80

81 Playing Field

82

83

84

85

86

87 LumberKing Fans

88

89

90

91

92

93

94

95

96

97

98

99

100

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115

116

117


Download ppt "Alliant Energy Field Renovation. September 2005 Work area blocked off Pitching mound is flattened."

Similar presentations


Ads by Google