New Measure Proposal Review and Prioritization Jennifer Anziano, Adam Hadley, Mohit Singh-Chhabra, Christian Douglass Regional Technical Forum February.

Slides:



Advertisements
Similar presentations
Project Proposal: Multifamily Weatherization UES Scoping Study Regional Technical Forum June 1 st, 2011.
Advertisements

Sunset Date Extension: Manufactured Homes HVAC Measures Regional Technical Forum November 18 th, 2014.
SEEM Calibration: Revisited Revising the regression to use continuous heat loss variable Regional Technical Forum December 17, 2013.
The Saga Continues: Measure Interactions for Residential HVAC and Wx measures Regional Technical Forum April 23, 2014.
Ductless Heat Pumps in Manufactured Homes with Zonal Electric Resistance Heat Adam Hadley Regional Technical Forum February 18, 2015.
Oregon Energy Star Homes Measure Update New Measure Proposal April 22nd,
UES Measure Sunsets Regional Technical Forum December 17, 2013.
Deeming Savings for Ductless Heat Pumps in Manufactured Homes Regional Technical Forum January 4 th, 2011.
Prescriptive Duct Sealing UES Measure Proposal Regional Technical Forum Subcommittee July 8, 2013.
Manufactured Homes Calibration: Existing and New Homes Mohit Singh-Chhabra & Josh Rushton RTF Update March 17, 2015.
Industrial Pump Motor VFDs: Provisional Standard Protocol Christian Douglass Regional Technical Forum 5/12/2015.
Residential New Construction Montana House: UES Measure Update Adam Hadley Regional Technical Forum April 14, 2015.
Implementer’s Group April 2015 Meeting Debrief and Upcoming Meeting Prep April 24, 2015.
Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
Manufactured Homes Calibration: Existing and New Homes Mohit Singh-Chhabra & Josh Rushton RTF MH Calibration Subcommittee February 27, 2015.
Plans to bring Out-of-Compliance UES Measures back into Compliance: 1. Agricultural Irrigation Hardware UES 2. Agricultural Motors UES Regional Technical.
Implementer’s Group January Meeting Debrief and Upcoming Meeting Prep January 29, 2015.
Residential Weatherization and Ventilation Subcommittee: Infiltration Impact Research Plan Presentation to the Regional Technical Forum February 14, 2012.
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
Overview of the Regional Technical Forum Guidelines January 22, 2013.
RTF 2015 Mid-Year Progress Report and 2016 Work Plan Jennifer Anziano Regional Technical Forum July 21, 2015.
Residential Weatherization and Ventilation Subcommittee Presentation to the Regional Technical Forum August 30, 2011.
RTF Staff, Subcommittee and Work Updates October 23, 2012.
Applying SEEM Updates, Calibration, and Measure Interaction Decisions to: Manufactured Homes Weatherization UES Measures Regional Technical Forum June.
Delivery Verification Jennifer Anziano Regional Technical Forum March 17, 2015.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum June 16 th, 2015 Mohit Singh-Chhabra.
Washington Energy Star and Built Green Homes Measure Update New Measure Proposal August 12th,
RTF Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
RTF Management Update Jennifer Anziano Regional Technical Forum April 14, 2015.
Oregon ENERGY STAR Homes Measure Update Adam Hadley Regional Technical Forum March 17, 2015.
Residential Single Family and Manufactured Home Heat Pump Water Heaters Christian Douglass Regional Technical Forum 4/14/2015.
RTF Staff, Subcommittee and Work Updates November 1, 2011.
1 NORTHWEST ENERGY EFFICIENCY ALLIANCE March 18 th, 2015 Residential New Construction Standard Protocol Subcommittee Kick-off.
QC Follow-up for Single Family SEEM Calibration, HVAC UES Measures, and Weatherization Measures Adam Hadley Regional Technical Forum May 12, 2015.
RTF Management Update Jennifer Anziano Regional Technical Forum May 12, 2015.
RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
Path for Multi-Family (MF) Weatherization and NC Measures Christian Douglass 8/18/2015.
Applying SEEM Updates, Calibration, and Measure Interaction Decisions to: Single Family Weatherization and HVAC UES Measures Follow-up from August RTF.
2011 RTF Projects RTF Input on SOW Outlines: - Deemed Measure Reviews - Measure Life Guidelines -Measure Cost Guidelines Regional Technical Forum April.
Research Strategy Review: Advanced Power Strips MH HVAC Related Measures Jennifer Anziano RTF R&E Subcommittee August 6, 2015.
Implementer’s Group July 2015 RTF Meeting Debrief and Upcoming Meeting Prep July 29, 2015.
Proposed 2015 RTF Work Plan September 16, Work Plan Development Process RTF 2015 work plan ProcessDate Develop draft work plan and present to Operations.
Implementer’s Group June 2015 RTF Meeting Debrief and Upcoming Meeting Prep June 23, 2015.
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
SEEM Calibration for Manufactured Housing Regional Technical Forum December 13, 2011 Analysis Performed ByAdam Hadley Cursory Reviews ByTom Eckman, Ben.
Residential Weatherization and Ventilation Subcommittee: Infiltration Impact Research Plan Presentation to the Regional Technical Forum December 13, 2011.
Implementer’s Group May 2015 Meeting Debrief and Upcoming Meeting Prep May 19, 2015.
PTCS Commissioning, Controls & Sizing Update of UES Measure Category and/or Status Regional Technical Forum July 15, 2014.
Working Towards Better Savings Estimates for HVAC and Weatherization Measures Regional Technical Forum September 16, 2014.
ENERGY STAR and Eco-Rated Homes: Planning Estimates and Research Strategy Regional Technical Forum December 8 th, 2015 Josh Rushton & Mohit Singh-Chhabra.
Applying SEEM Updates, Calibration, and Measure Interaction Decisions to: Manufactured Homes Weatherization UES Measures Regional Technical Forum December.
RTF Management Update Jennifer Anziano Regional Technical Forum August 18, 2015.
RTF Management Updates Jennifer Light Regional Technical Forum December 8, 2015.
Idaho and Montana Residential Single Family New Construction Measures Mohit Singh-Chhabra Regional Technical Forum October 20 th, 2015.
RTF Management Update Jennifer Anziano Regional Technical Forum June 16, 2015.
RTF New Homes Subcommittee February 11, 2016 Next Step Homes Update.
Planning UES Measures: Prescriptive Duct Sealing SF Performance-based Duct Sealing SF Performance-based Duct Sealing MH Adam Hadley & Josh Rushton Regional.
RTF Management Update Jennifer Anziano Regional Technical Forum July 21, 2015.
Non-Residential Network Computer Power Management Christian Douglass Regional Technical Forum January 21, 2016.
Non-Proven Residential Duct Sealing Measures: Research Strategy Josh Rushton and Adam Hadley Research and Evaluation Subcommittee October 7, 2015.
Exterior LED Area Lights
Implementer’s Group December Meeting Debrief and Upcoming Meeting Prep January 6, 2015.
RTF Management Update Jennifer Anziano Regional Technical Forum March 17, 2015.
Implementer’s Group October 2015 RTF Meeting Debrief and Upcoming Meeting Prep October 29, 2015.
RTF Management Updates Jennifer Light Regional Technical Forum February 17, 2016.
Mohit Singh-Chhabra, Josh Rushton RTF Presentation March 15, 2016 New Homes Standard Protocol Update.
RTF’s Engagement with Research Jennifer Light RTF Policy Advisory Committee February 19, 2016.
Manufactured Homes: Heat Pump Related Measures Regional Technical Forum Presentation August 18 th, 2015.
Presentation transcript:

New Measure Proposal Review and Prioritization Jennifer Anziano, Adam Hadley, Mohit Singh-Chhabra, Christian Douglass Regional Technical Forum February 18, 2015

Overview Today, we are seeking RTF feedback on our proposed path and prioritization of new measure proposals Prioritization criteria Suite of existing measures New measure proposals – Overview of measure and plan for next steps 2

Prioritization Criteria Seeking to weigh these criteria to inform relative priority of new measure development, in light of existing measure work: Regional interest Potential regional impact Ideal timeline and how this fits into our existing work RTF resource requirements 3

Existing Measures 4

New Measure Proposals Residential Low E Storm Windows Residential Duct Insulation Residential Prescriptive Air Sealing Non-Residential Lighting Code Compliance Next Step Homes Standard Protocol 5

Residential Low E Storm Windows 6

Measure Background Measure Name:Low E Storm Windows Measure Category:Proven or Provisional UES Measure Sector:Residential End-Use:Single Family, Existing Proposing Party:BPA, PNNL Interested Party:BPA Regional Potential:Medium/High 7

Measure Development History, Timeline Measure Specification: Install low-e storm window over ___ type of window. Savings Estimation Procedure: Calibrated Engineering (SEEM) Jan 2015 – BPA submits measure request and asks for RTF decision by June or July Proposed Next Steps – BPA to contract with PNNL, set up spec and u-value outputs – RTF CAT to estimate savings and put together measure proposal 8

Residential Duct Insulation 9

Measure Background Measure Name:Duct Insulation Measure Category:Proven UES Measure Sector:Residential End-Use:Single Family, Existing Proposing Party:BPA, SBW Interested Party:BPA Regional Potential:Low/Medium 10

Measure Development History, Timeline Measure Specification: Insulate to R-11 ducts with existing insulation of R-2 or less, located in unconditioned space. (This is a summary; a detailed specification document will accompany the measure proposal.) Savings Estimation Procedure: Calibrated Engineering (SEEM, with measure interactions) February 2014 – Complete package submitted to RTF CAT for review. – Decision to wait until RTF finalizes its SEEM96 calibration and measure interaction analysis (Option 3). December 2014 – RTF finalized its SEEM analysis for SF homes (Wx and HVAC)…finally Next Steps – Placeholders were included in the SEEM96 (Option 3) analysis for duct insulation, so assembly of a final proposal package should be straightforward 11

Residential Prescriptive Air Sealing 12

Measure Background Measure Name:Prescriptive Air Sealing Measure Category:??, UES Measure Sector:Residential End-Use:SF and MH, Existing Proposing Party:SBW, BPA Interested Party:BPA Regional Potential:Low/Medium 13

Measure Overview Measure Specification: Prescriptive air sealing for individual home components (attic, window, floor) to support existing RTF single family and manufactured home weatherization insulation measures. Savings Estimation Procedure: Calibrated Engineering (SEEM, with measure interactions) 14

Measure Development History, Timeline February 2014 – Research plan submitted to RTF CAT for review 3 options considered, but no practical solution Identified Proposal at the time was to estimate savings using SEEM, but make an estimate on the leakage reduction – CAT was uncomfortable with the “guess” and suggested looking at the results of the ETO study (prescriptive attic air sealing) – not available at the time – Decision to wait until RTF finalizes its SEEM96 calibration and measure interaction analysis (Option 3) December 2014 – RTF finalized its SEEM analysis for SF homes (Wx and HVAC)…finally Next Steps – Savings were estimated in SEEM96 (Option 3) for air sealing (kWh/CFM50reduction); the primary missing piece is an estimate of CFM50 reduction – ETO study: Projects completed end of 2014; data available this Spring Also… 15

More History February 2012 – The RTF adopted the “Residential Weatherization Research Data Collection Plan for Determining the Impact of Prescriptive Air Sealing on Ventilation and Infiltration Resulting from the Implementation of the RTF Residential Weatherization Measure Specifications”Residential Weatherization Research Data Collection Plan for Determining the Impact of Prescriptive Air Sealing on Ventilation and Infiltration Resulting from the Implementation of the RTF Residential Weatherization Measure Specifications Scope: “This research plan, approved by the RTF at the February 14, 2012 meeting, outlines data collection and analysis intended to examine the impact of implementing weatherization measures meeting the RTF weatherization specifications. This will be a one-year data collection effort commencing once RTF Residential Weatherization Specifications are adopted by regional utilities and implementation has begun. It calls for pre-and post-weatherization project blower door tests and other basic house characteristic data collection…” To Date: We haven’t heard of any data collection/study 16

Non-Residential Lighting Code Compliance 17

Measure Background Measure Name:Non-Residential Lighting Code Compliance Estimation Method: Provisional Standard Protocol Measure Sector: Commercial End-Use: Lighting Proposing Party:RTF(?) Interested Party: Unknown Regional Potential:Low/Medium 18

Proposed Standard Protocol Overview A Non-Res Lighting Provisional Standard Protocol for projects that trigger a “Lighting Power Allowance (LPA) or Lighting Power Density (LPD) requirement in the applicable building code” 1 This definition includes the following scenarios: – A new building or new addition to an existing building – A change in Building Use Area as defined by building code – A “major renovation”, as defined in the Protocol document Savings are computed relative to the LPA required by code 1 From draft provisional protocol document, “Draft Provisional Protocol for Non-Residential Lighting with Current Practice Baseline,” July 23,

Provisional Protocol Development Timeline From past subcommittee presentation, it appears that a single lighting protocol was split into two separate protocols in 2013:presentation – “Retrofit” (mostly pre-conditions baseline) – “Lighting Code Compliance” 1 (current practice baseline) Since then, “Retrofit” has been the primary focus Questions for the RTF: – Are there subcommittee members who recall why the code compliance protocol stalled? – Is this still a feasible protocol to pursue, and is there interest in bringing this back under development? 1 Also referred to as “LPA Required” 20

Next Step Homes Standard Protocol 21

Measure Background Measure Name:Next Step Homes Measure Category:Provisional Standard Protocol (??) Measure Sector:Residential (SF) End-Use:New Construction Proposing Party:NEEA, CLEAResult Interested Party:NEEA Regional Potential:Unknown 22

Proposed Standard Protocol Overview Objective: To test the feasibility of estimating energy savings for Next Step Homes (NSH) using a Northwest specific version of REMRate – NSH will employ a suite of new construction whole building measures to achieve savings target The proposed protocol will test REMRate by comparing REMRate energy consumption and resulting savings estimates through calibrated SEEM and primary data collection – The NSH pilot projects provide a unique opportunity to collect data on 38 new construction homes and test the feasibility of using REMRate for savings estimation – Possible access to 500+ REMRate files and corresponding billing data from ETO – The exact methodology will evolve as NEEA, CLEAResult and CAT work to develop the provisional protocol 23

Proposed Standard Protocol Overview: Contd. An approved protocol may enable Northwest REMRate with standardized input assumptions to be used as an RTF new construction energy savings estimation tool in the region. – REMRate is a popular tool in the construction and energy rating industry – NEEA seeks to leverage this market facing tool to streamline utility involvement in new construction and ensure savings claimed by market actors are real 24

Provisional Protocol Development Timeline Proposed provisional protocol to be brought to the RTF in December, 2015 – This protocol development process will require a technical subcommittee NEEA will provide necessary resources to develop the protocol and the research plan – NEEA funders have expressed interest and willingness to staff a technical subcommittee 25

Staff Feedback Significant resources will be required to: – Calibrate heating energy consumption estimate from chosen software – Review and (possibly) improve savings algorithms for conventional measures (insulation, infiltration etc.) and non-conventional measures (e.g. radiant heating floors) – Develop standard protocol and research plan Other options might be less resource intensive – Potential path: Estimate a coarse adjustment factor for REMRate using billing data 26

New Measure Summary 27 Measure Regional Interest Regional ImpactTarget Date Resource Requirements Relative Priority Residential Low E Storm WindowsBPAMed/HighJune 2015Low/MedHigh Residential Duct InsulationBPALow/MedunknownLow/MedMedium Residential Prescriptive Air SealingBPALow/MedunknownMedium Non-Residential Lighting Code ComplianceunknownLow/MedunknownMed to HighLow Next Step Homes Standard ProtocolNEEAunknown December 2015 HighMedium

Proposed Motion “I _________ move that the RTF allocate staff resources towards developing: (select all that apply) a residential Low E Storm Windows UES measure, and/or a Residential Duct Insulation UES measure, and/or a Residential Prescriptive Air Sealing UES measure, and/or a Non-Residential Lighting Code Compliance Standard Protocol, and/or a Next Step Homes measure.” 28