Electrical Quality Assurance Markus Friedl HEPHY Site Qualification, 6 August 2015.

Slides:



Advertisements
Similar presentations
23 July 2012 Thomas Bergauer (HEPHY Vienna) Belle II SVD Construction Database 12 th B2GM Bad Aibling.
Advertisements

Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
The Belle II Silicon Vertex Detector Readout Chain Markus Friedl (HEPHY Vienna) TWEPP2012, 19 September 2012.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
21 Sept 2009 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting.
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
19 November 2009 Christian Irmler (HEPHY Vienna) APV25 and Origami Scheme 4 th Open Meeting of the Belle II Collaboration.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)
APV25 for SuperBelle SVD M.Friedl HEPHY Vienna. 2Markus Friedl (HEPHY Vienna)11 Dec 2008 APV25 Developed for CMS by IC London and RAL (70k chips installed)
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Noise and Capacitor M.Friedl, R.Thalmeier, H.Yin (HEPHY Vienna) 24 September 2015.
DAQ Scheme and Beam Test Results H. Asano, M. Friedl, H. Hyun, T. Higuchi, C. Irmler, Z. Natkaniec, W. Ostrowicz, M. Pernicka, T. Tsubuyama.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
WP9.4 baseline deliverable summary 10 December 2014 Thomas Bergauer (HEPHY Vienna)
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
8. February 2012 Thomas Bergauer (HEPHY Vienna) SVD Construction Database SVD-PXD meeting.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
2 Oct C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
APVDAQ Status Markus Friedl 22 January M.Friedl: APVDAQ Status2 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do.
SVD DAQ Status Koji Hara (KEK) 2012/7/19 DAQ workshop1.
SVD Cables & Pipes Markus Friedl (HEPHY Vienna) B2GM, 24 July 2012.
Class B ( L4.001 ) Data Base Tutorial Kamesh. 2 L4.xxx -- RS4.xxx ( check list ) OS4.xxx ( check list ) -- SPA4.xxx ( check list ) SBWxxx SFWxxx Check.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
Test beam preparations Florian Lütticke, Mikhail Lemarenko, Carlos Marinas University of Bonn (Prof. Norbert Wermes) DEPFET workshop Ringberg (June 12-15,
L5 Assembly 10 Sept C. Irmler (HEPHY Vienna) 8 th Belle II VXD Workshop OS5.905.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
QA Tests Tests for each sensor Tests for each strip Tests for structures Process stability tests Irradiation tests Bonding & Module assembly Si detectors1272.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
SVD Docks Markus Friedl (HEPHY Vienna) B2GM, 23 July 2012.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
SVD FADC SVD-PXD Göttingen, 25 September 2012
SVD Electronics Constraints
SVD Introduction Wetzlar SVD-PXD Meeting, 4 February 2013
Electronics & Machine Shop
Markus Friedl (HEPHY Vienna)
Update on the SVD construction
7th Belle II VXD Workshop, Prague
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
Mini-drawers, FE-ASIC , Integrator
Misc. Topics Markus Friedl (HEPHY Vienna) 22 January 2015.
UCSB Testing Status Anthony Affolder
UCSB Testing Status Anthony Affolder
UCSB Testing Status Anthony Affolder
BPAC, 17 October 2017 VXD GND/EMC Markus Friedl (HEPHY Vienna)
Class B Ladder assembly
US Module Testing Progress Report
Electronics Sub-Group
Setup for testing LHCb Inner Tracker Modules
US Module Testing Progress Report
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

Electrical Quality Assurance Markus Friedl HEPHY Site Qualification, 6 August 2015

6 August 2015M.Friedl: Electrical Quality Assurance2 APVDAQ EQA Tests Ladder Tests Summary

6 August 2015M.Friedl: Electrical Quality Assurance3 APVDAQ EQA Tests Ladder Tests Summary

HEPHY Clean Room Installation 6 August 2015M.Friedl: Electrical Quality Assurance4 Linear LV power supplies VME Crate 2 x Keithley 2410 HV power supplies (software controlled) PC (under the table) Metal box with repeater boards Device under test (here: L5.904 wrapped in cloth) Barcode scanner

New Since January (Site Qualification 1)  Metal box with repeaters mounted under shelf  Was on table during test of L3 hybrids (cable pigtail)  DAC boards installed for both p and n sides  Software updates  IntCal vs. Vsep scan  APVDAQ: automatic recognition of strange channels  IV Scan (new in end of July, thus no class B data yet)  Generates CSV file for database  Allows to go to standard bias (100V) after scan (0..200V) 6 August 2015M.Friedl: Electrical Quality Assurance5

APVDAQ Screenshots  IntCal 6 August 2015M.Friedl: Electrical Quality Assurance6  IntCal vs. Vsep List of strange channels (also stored in log file)  Download:

IV Scan Screenshot 6 August 2015M.Friedl: Electrical Quality Assurance7

6 August 2015M.Friedl: Electrical Quality Assurance8 APVDAQ EQA Tests Ladder Tests Summary

EQA During Ladder Assembly  SBW and SFW  APVDAQ test upon reception  APVDAQ test once glued onto ribs  Origami –z and ce flexes  APVDAQ test at reception  Origami sub-assembly (OSx.nnn)  No more intermediate tests (not very conclusive)  APVDAQ test for –z and ce once completed  Completed ladder  APVDAQ test for each sensor  Full FADC test with source 6 August 2015M.Friedl: Electrical Quality Assurance9

What Is Tested? (1/2)  APVDAQ Test  In the clean room (1F)  One sensor at a time  Always:  ADC delay scan  FIR calculation  10k pedestal run  IntCal run  With sensor (in addition):  IV scan  IntCal vs. Vsep scan 6 August 2015M.Friedl: Electrical Quality Assurance10

What Is Tested? (2/2)  FADC Test  In the lab (4F)  All sensors at once  ADC delay scan  FIR calculation  10k pedestal run  IntCal run  IV scan  Source scan  Work in progress… 6 August 2015M.Friedl: Electrical Quality Assurance11

Main Ladder Testing Ingredients  Module test box  Ladder on x-y stage  90 Sr source (1mCi) mounted inside box  Already used for several beam tests (CERN, DESY)  Flushing with dry air and CO 2 cooling possible, but not intended for ladder tests  Readout system  Will use FADC V1 components for a dedicated setup  LV & HV power (replica of APVDAQ)  Linear lab power supplies for LV  2 x Keithley 2400 for HV 6 August 2015M.Friedl: Electrical Quality Assurance12

Test Box with L5.903 (CERN, June 2015) 6 August 2015M.Friedl: Electrical Quality Assurance13

Ladder Testing: Outlook  All hardware exists  To do: DAQ firmware (Richard Thalmeier) & software (master student Lukas Bulla, with help by Hao Yin)  Back-port recent firmware to V1 hardware  Program motion path for x-y stage  Adapt DAQ software for V1 hardware/firmware  Integrate all functions and sequence  Beta version ready until early September  To do: Install & adapt Giulia’s analysis software (project student Daniel Lukic in September) 6 August 2015M.Friedl: Electrical Quality Assurance14

Origami Sub-Assembly Testing: Outlook  Will do a source scan with APVDAQ in late August  Qualification of new Origami & PA0 (batch 0)  To be performed on OSA to minimize potential loss of valuable sensors  Source/scintillator holder (Florian + machine shop)  Operated in dark box  Can manually slide along OSA in z direction 6 August 2015M.Friedl: Electrical Quality Assurance15

6 August 2015M.Friedl: Electrical Quality Assurance16 APVDAQ EQA Tests Ladder Tests Summary

Hit Profiles (1/2)  Slides shown on 16 April 2015  FADC readout (full class B ladder)  4 measurements with source pointing ~at center of each sensor  Profile is much wider than scintillator  multiple scattering  Shadow of ribs clearly visible (blurred outer edges)  APV25 chips not visible 6 August 2015M.Friedl: Electrical Quality Assurance17

Hit Profiles (2/2)  Features of Origami flex visible:  Gap between green copper buses for power  Gap between green and red parts (upper edge)  Both are more pronounced for –z and bw because 2 Origamis are stacked there 6 August 2015M.Friedl: Electrical Quality Assurance18

More Data  All plots (hit profile, noise, cluster width, signal-to-noise, etc.) can be found in the Twiki:  Noise patterns all look as expected  Most important conclusion: operating the full ladder simultaneously works as good as individual parts 6 August 2015M.Friedl: Electrical Quality Assurance19

Comparison APVDAQ – FADC  Different readout chains (factor ~1.5 in gain)  Figure of merit: IntCal Amplitude / noise (a kind of SNR)  Similar numbers, FADC sometimes slightly better  All data available in Twiki (link on previous page) 6 August 2015M.Friedl: Electrical Quality Assurance20

Pinhole Comparison APVDAQ – Sensor  BW: No pinholes (consistent for APVDAQ & sensor)  -Z:  P-side pinholes: 19, 765, 766 (consistent)  N-side pinholes: none (consistent)  CE:  P-side pinholes: 67,69, 750 (consistent), 68 (sensor only)  N-side pinholes: 7,15,17, 277,284, 426  FW:  P-side pinholes: 430,440,442,466,470,518,616,626,632,670 (consistent); several more (APVDAQ only); several more (sensor only)  N-side pinholes: 199,296 (APVDAQ only); 312 (sensor only)  Sensor measurements inconsistent between Vienna and Trieste 6 August 2015M.Friedl: Electrical Quality Assurance21

6 August 2015M.Friedl: Electrical Quality Assurance22 APVDAQ EQA Tests Ladder Tests Summary

 Electrical Quality Assurance during series production  APVDAQ well established  DAC installed for both p and n sides  IV scan added recently  Will do source scan verification on OSA (batch 0) in late August  FADC ladder testing: in progress  Full ladder scan with 90 Sr source  Will use dedicated V1 FADC hardware in electronics lab  Needs some more software work for control, DAQ and analysis (manpower is assigned) 6 August 2015M.Friedl: Electrical Quality Assurance23

Further Reading  C.Irmler: EQA during Ladder Assembly  SVD QCG Group Meeting, 16 April 2015  ialId=slides&confId= ialId=slides&confId=18441  M.Friedl: L5.903 [class B ladder] Measurements  SVD QCG Group Meeting, 16 April 2015  ialId=slides&confId= ialId=slides&confId= August 2015M.Friedl: Electrical Quality Assurance24

6 August 2015M.Friedl: Electrical Quality Assurance25