Electrical Quality Assurance Markus Friedl HEPHY Site Qualification, 6 August 2015
6 August 2015M.Friedl: Electrical Quality Assurance2 APVDAQ EQA Tests Ladder Tests Summary
6 August 2015M.Friedl: Electrical Quality Assurance3 APVDAQ EQA Tests Ladder Tests Summary
HEPHY Clean Room Installation 6 August 2015M.Friedl: Electrical Quality Assurance4 Linear LV power supplies VME Crate 2 x Keithley 2410 HV power supplies (software controlled) PC (under the table) Metal box with repeater boards Device under test (here: L5.904 wrapped in cloth) Barcode scanner
New Since January (Site Qualification 1) Metal box with repeaters mounted under shelf Was on table during test of L3 hybrids (cable pigtail) DAC boards installed for both p and n sides Software updates IntCal vs. Vsep scan APVDAQ: automatic recognition of strange channels IV Scan (new in end of July, thus no class B data yet) Generates CSV file for database Allows to go to standard bias (100V) after scan (0..200V) 6 August 2015M.Friedl: Electrical Quality Assurance5
APVDAQ Screenshots IntCal 6 August 2015M.Friedl: Electrical Quality Assurance6 IntCal vs. Vsep List of strange channels (also stored in log file) Download:
IV Scan Screenshot 6 August 2015M.Friedl: Electrical Quality Assurance7
6 August 2015M.Friedl: Electrical Quality Assurance8 APVDAQ EQA Tests Ladder Tests Summary
EQA During Ladder Assembly SBW and SFW APVDAQ test upon reception APVDAQ test once glued onto ribs Origami –z and ce flexes APVDAQ test at reception Origami sub-assembly (OSx.nnn) No more intermediate tests (not very conclusive) APVDAQ test for –z and ce once completed Completed ladder APVDAQ test for each sensor Full FADC test with source 6 August 2015M.Friedl: Electrical Quality Assurance9
What Is Tested? (1/2) APVDAQ Test In the clean room (1F) One sensor at a time Always: ADC delay scan FIR calculation 10k pedestal run IntCal run With sensor (in addition): IV scan IntCal vs. Vsep scan 6 August 2015M.Friedl: Electrical Quality Assurance10
What Is Tested? (2/2) FADC Test In the lab (4F) All sensors at once ADC delay scan FIR calculation 10k pedestal run IntCal run IV scan Source scan Work in progress… 6 August 2015M.Friedl: Electrical Quality Assurance11
Main Ladder Testing Ingredients Module test box Ladder on x-y stage 90 Sr source (1mCi) mounted inside box Already used for several beam tests (CERN, DESY) Flushing with dry air and CO 2 cooling possible, but not intended for ladder tests Readout system Will use FADC V1 components for a dedicated setup LV & HV power (replica of APVDAQ) Linear lab power supplies for LV 2 x Keithley 2400 for HV 6 August 2015M.Friedl: Electrical Quality Assurance12
Test Box with L5.903 (CERN, June 2015) 6 August 2015M.Friedl: Electrical Quality Assurance13
Ladder Testing: Outlook All hardware exists To do: DAQ firmware (Richard Thalmeier) & software (master student Lukas Bulla, with help by Hao Yin) Back-port recent firmware to V1 hardware Program motion path for x-y stage Adapt DAQ software for V1 hardware/firmware Integrate all functions and sequence Beta version ready until early September To do: Install & adapt Giulia’s analysis software (project student Daniel Lukic in September) 6 August 2015M.Friedl: Electrical Quality Assurance14
Origami Sub-Assembly Testing: Outlook Will do a source scan with APVDAQ in late August Qualification of new Origami & PA0 (batch 0) To be performed on OSA to minimize potential loss of valuable sensors Source/scintillator holder (Florian + machine shop) Operated in dark box Can manually slide along OSA in z direction 6 August 2015M.Friedl: Electrical Quality Assurance15
6 August 2015M.Friedl: Electrical Quality Assurance16 APVDAQ EQA Tests Ladder Tests Summary
Hit Profiles (1/2) Slides shown on 16 April 2015 FADC readout (full class B ladder) 4 measurements with source pointing ~at center of each sensor Profile is much wider than scintillator multiple scattering Shadow of ribs clearly visible (blurred outer edges) APV25 chips not visible 6 August 2015M.Friedl: Electrical Quality Assurance17
Hit Profiles (2/2) Features of Origami flex visible: Gap between green copper buses for power Gap between green and red parts (upper edge) Both are more pronounced for –z and bw because 2 Origamis are stacked there 6 August 2015M.Friedl: Electrical Quality Assurance18
More Data All plots (hit profile, noise, cluster width, signal-to-noise, etc.) can be found in the Twiki: Noise patterns all look as expected Most important conclusion: operating the full ladder simultaneously works as good as individual parts 6 August 2015M.Friedl: Electrical Quality Assurance19
Comparison APVDAQ – FADC Different readout chains (factor ~1.5 in gain) Figure of merit: IntCal Amplitude / noise (a kind of SNR) Similar numbers, FADC sometimes slightly better All data available in Twiki (link on previous page) 6 August 2015M.Friedl: Electrical Quality Assurance20
Pinhole Comparison APVDAQ – Sensor BW: No pinholes (consistent for APVDAQ & sensor) -Z: P-side pinholes: 19, 765, 766 (consistent) N-side pinholes: none (consistent) CE: P-side pinholes: 67,69, 750 (consistent), 68 (sensor only) N-side pinholes: 7,15,17, 277,284, 426 FW: P-side pinholes: 430,440,442,466,470,518,616,626,632,670 (consistent); several more (APVDAQ only); several more (sensor only) N-side pinholes: 199,296 (APVDAQ only); 312 (sensor only) Sensor measurements inconsistent between Vienna and Trieste 6 August 2015M.Friedl: Electrical Quality Assurance21
6 August 2015M.Friedl: Electrical Quality Assurance22 APVDAQ EQA Tests Ladder Tests Summary
Electrical Quality Assurance during series production APVDAQ well established DAC installed for both p and n sides IV scan added recently Will do source scan verification on OSA (batch 0) in late August FADC ladder testing: in progress Full ladder scan with 90 Sr source Will use dedicated V1 FADC hardware in electronics lab Needs some more software work for control, DAQ and analysis (manpower is assigned) 6 August 2015M.Friedl: Electrical Quality Assurance23
Further Reading C.Irmler: EQA during Ladder Assembly SVD QCG Group Meeting, 16 April 2015 ialId=slides&confId= ialId=slides&confId=18441 M.Friedl: L5.903 [class B ladder] Measurements SVD QCG Group Meeting, 16 April 2015 ialId=slides&confId= ialId=slides&confId= August 2015M.Friedl: Electrical Quality Assurance24
6 August 2015M.Friedl: Electrical Quality Assurance25