Technology and Engineering Development (TED) Building (55) Occupancy.

Slides:



Advertisements
Similar presentations
IIT – Bailey Hall – Graduate Student Housing – Existing Conditions
Advertisements

Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Computer Class Procedures
Department of Forest and Ecosystem Science Student Induction.
School and Classroom Procedures Barren County Middle School
SETUP Chapter 6 Lead Abatement for Workers Course.
Construction Project Michael J. Bruno Bruno Construction Management.
Introductions: Tom Boyd – Tonn and Blank Construction, LEED Green Associate Tom Boyd – Tonn and Blank Construction, LEED Green Associate Sr. Martha Ann.
Fire Marshal & Medical Emergency Training Please Sign In
Residence Life. Four Residence Halls Seven Townhouse-style apartments areas Five Resident Directors 32 Resident Assistants Living with roommates University.
Presented by: Jane Briggs and Karen Mitchell October 11, 2007 The New LEED Building at Shady Grove.
3700 Centerpoint Emergency Action Plan Tenant Training.
Green Building Design Scott Lowe Professor Civil and Environmental Engineering Department Manhattan College.
Nova Website Emergency Instructions For Evacuation, Shelter In Place, Lab Safety, Flu and More….
School of Management Opening Faculty Meeting August 25, 2005 Welcome to Alger Hall.
Sustainable Design Energy Sciences Building. 2 Sustainability Regulations DOE final rule [10 CFR part 433] (30% better than ASHRAE) DOE Order 430.2b:
By: Chris Kerlin July 6, 2012 MAA 587.  Three parts  Sports Hall Improvement  Lower Gym Expansion  Swimming Pool Development.
Tour Stop 1: Outside The Building. Community Connectivity Encourages A Walkable Neighborhood At least 10 community services, and high density residential.
Moving Out of Mount Hall What you need to know. Move Out Schedule Currently: Media Services June 23: – Student Support Services (to Enarson) (Owens) –
BECOMING GREEN Santa Margarita High School Academic Building.
Bethany Ramey Trombley Architect, LEED AP ID+C September 10, 2010 UT’s Hearst Student Media Center LEED GOLD Renovation What Starts Here Changes The World.
Six Sigma Academy N Scottsdale Rd Suite 250 Scottsdale, AZ Phone: (480) Phone: (480) Between NOW and 1/24 take a little time.
Knocking The Rust Off The Rust Belt Calfee, Halter & Griswold LLP, The Calfee Building, 1405 East Sixth Street, Cleveland, Ohio Cleveland | Columbus.
David Redman, Director Facilities and Administrative Services Division April 4, HQ Renovation All Hands.
COLLEGE OF SAN MATEO BUILDING 36 – SCIENCE / PLANETARIUM Design Build and Sustainability Sustainability Conference: Butte Community College August 3 rd.
PBSD - Transportation and Maintenance Facility Project Status Report – 1460 Greensburg Road Plum Borough School District Richard Zucco & Michael Brewer.
Office Layout Techniques and Space Requirements
Safety Training Presentation
David Redman, Director Facilities and Administrative Services Division September 27, HQ Renovation All Hands Return to Floor 8.
1. 2  Place sharp objects away from the edge of workstation surface area  Store pencils flat  Use staple remover--not finger nails  Don’t eat or drink.
1 Hall Manager Nuts & Bolts Meeting Dooley Room Wednesday, May 4, 2011 OFFICE OF HOUSING 305 Main Building | Notre Dame, Indiana Phone:
7-8 th Grade Family: Procedures. volume levels Level 0 – Silent (hand raised and wait to be called on). Level 0 – Silent (hand raised and wait to be called.
David Redman, Director Facilities and Administrative Services Division March 7, HQ Renovation All Hands Relocation From 7 th Floor to 5 th Floor.
ENVELOPE. LIGHTING.
CURTIN PETROLEUM ENGINEERING Welcome Orientation Session ARRC – Australian Resources Research Centre Friday 1 st March pm – 3.00pm Health and.
Classroom Expectations and Procedures The following discipline procedures will be used in class!
The Austin Garden Project By: Cayla Walsh Joe Smrt Kyle Petty.
David Redman, Director Facilities and Administrative Services Division September 25, HQ Renovation All Hands Relocation From Floor 6 to 5.
Kindergarten Orientation August 13 6:00 pm. Welcome to the Vejar Family!
Welcome! 1. Look on note cards to find your seat. This is 2 nd block, so your name is after the Complete Bellringer. When you finish Bellringer,
1 Presentation to Technical Services Step 1 - Walk-through of new premises Step 2 – This presentation will focus on next steps to relocate staff and departmental.
Welcome to Mrs. Nadeau’s Class! Classroom Expectations & Procedures English Language Arts and Social Studies Building 16 Room 270.
Energy efficiency : Solar Panels heat 60% of our hot water.
Floor Wardens Safety Monitors & Guests. Overview.
Westbrook Middle School Move Class Welcome. MOVE TEAM  Move Leader - Brian Mazjanis  Move Coordinator – Theresa Brackett, Spaces Design Studio Office:
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Building 185 Orientation Briefing 101 Nelson Drive Offutt AFB,
Green Building Earth Day April 22, 2007 Environmental Awareness Project Westfield State College For More Information Visit… Globalgreen.org Buildingreen.com.
HEALTHY YOUTH SURVEY 2016 SURVEY COORDINATOR TRAINING.
WSMS Emergency Procedures:. Culture of Safety 1. Follow procedures when walking down the hall—Walk on the Right 2. Keep your hands to yourself 3. Cameras.
Tissue Banks International Move Presentation 1. Key Dates Monday, December 9 th - Packing & Relocation of Distribution Cage Wednesday, December 11 th.
David Redman, Director Facilities and Administrative Services Division June 13, HQ Renovation All Hands.
Means of Egress Don Ebert- Risk Manager (509)
Fighting Fire with Fire: Fort Bragg Goes Platinum with a new LEED Fire Station Kim M. Fowler Senior Research Engineer Sustainable Design and Development.
Jeremy Curry, Jeffrey Williams, Gary McCleod, Matt Gorecki, Drew Lattuca.
David Redman, Director Facilities and Administrative Services Division December 11, HQ Renovation All Hands Return to Floor 6.
White Pigeon Community Schools
SCHEDULER’S WORKSHOP.
2012 Environmental Symposium Opening Address
Sustainable Efforts in Housing
Case Study: Collaborative Connected Workplace Environment- Cisco
Welcome to DAU 6175 Guardian Gateway
City of Novato Move Presentation
Tissue Banks International Move Presentation
Facilities Services The Facilities Department is responsible for the overall management & maintenance of the buildings & grounds at the University of.
Manufacturing Facilities Design and Analysis:
TENANT TRAINING HURRICANE SEASON 2018
Nicholson Tower Move February 5, 2017.
Administrative and security issues
Recent Bond Accomplishments
Employee Move Guide for [company name here]
Presentation transcript:

Technology and Engineering Development (TED) Building (55) Occupancy

Agenda Introductions General Information/Floor Plan Evacuation Plans Amenities Move In Getting Around Building Rules

Introductions Construction Project Manager – Keith Royston Construction Field Manager – Ken Mitchell Relocation Project Manager – Dennis Miner Relocation Project Coordinator – David Fazenbaker Data/Comms/AV Coordinator – Jason Willoughby Facilities Building Manager – Mike Davenport – Located in the building – Facilities' POC for any building issues – Issues – Let Mike know

Introductions Safety Wardens – SRF 1st floor: Chris Wilcox 2nd floor: Hui Tian – Engineering office spaces- Tonya Evans RF and DC Power spaces- Wesley Woodworth Cryo spaces- Isaac Snowburg EES support- Bill Formichelli Fire Evacuation Wardens - coordinated by Mike Davenport, Tim Minga, Tina Menefee

General Information Building is 70,000 + SF Once all moves are complete the TED will house ~ 200 people TED Building is designed and constructed to be Leadership in Energy and Environmental Design (LEED) Gold certified. – DOE Requirement for new construction – LEED certification provides independent 3 rd party verification that a building project is environmentally responsible and is a healthy place to work. – DOE also requires 15% of out buildings meet “High Performance Sustainable Building” requirements. The TED building along with the Test Lab and Test Lab Rehab will provide the bulk of square footage to meet this requirement

General Information TED Sustainable Building Features – 80% of the building heating and cooling requirements will come from 174 geothermal wells. The 10% “extremes” from conventional systems. – Solar hot water is used to heat domestic hot water with conventional system backup. – TED will operate using ~ 40,000 BTU/SF; Lab currently operates similar buildings using 100,000 BTU/SF – Toilets will be flushed using “gray” water (reclaimed water) – Restrooms use low flow water fixtures – Building has a “cool” roof; high insulation and reflectance. – Used products with a high recycle content – Improved indoor air quality by using low-emitting materials – Recycled construction debris

TED 1 st Floor

TED 1 st Floor Evacuation

TED 1 st Floor High Bay

TED 2 nd Floor

TED 2 nd Floor Evacuation

Additional Safety Items Emergency Drill – Evacuation drill planned for 1 st week of occupancy TLD Badge Racks will be installed on 1 st Floor First Aid Cabinets AED will be installed on 1 st Floor

TED Amenities 1 st Floor – Lobby – Front Desk – Restrooms (2 sets) – Break Rooms Refrigerator Vending Microwave Coffee Maker Icemaker 2 nd Floor – Restrooms (2 sets); one with lockers – Break Rooms Refrigerator Vending Microwave Coffee Icemaker – 8 conference rooms – High Density Storage – Future Exercise Room Bulletin Boards will be provided on both floors

Conference Rooms Conference rooms – Four large – Four Small – Reserved through the online calendar – One small ad hoc meeting room – not reserved A/V equipment – will be provided in 7 of the rooms Larger conference rooms have one wall painted to act as a white board “idea wall” Do not remove any conference room furniture from the rooms

Office Moves into TED - 1 Move Dates – SRF Office move date is 17 March – Engineering move date in April (TBD) Move Process – Packing should be complete by 5 PM on Friday before the move. – Movers will relocate to TED on Saturday. – Report to TED the following Monday after 7 AM. Enter through the front door What to move – Contents of desk, files, bookcase, office trash and recycling containers – Label all boxes with new room/workstation number What not to move – Furniture, equipment, or phones There will be a container for phones

Office Moves into TED - 2 Computers – Computer Center will set up a mini help desk in the lobby the Monday following office moves to assist in getting everyone connected Printers/Copiers – Shared units will be provided or relocated by computer center. The colorQube going in on the second floor will be named cs33 and cs12, which is moving in with SRF, will stay the same name. Phones – VoIP (voice over IP) phones will be provided. Instruction booklets are available online. – When you arrive the first morning call Ext 7155 from your new phone to have your phone transferred to the new location

Office Moves into TED - 3 Signage – Temporary Signs will be in place…permanent signs are on order and will arrive in about a month – Permanent signs will have a space number and room for an individual’s name and group name Mail – Initially mail will be delivered as internal to 1 st floor mail boxes. – Address changes will be provided separately – Eventually US Mail will also be directly delivered. – Wall mounted mail slots will be provided for work groups Others will Reuse your Move Boxes – There will be a designated place to stack them

Office Moves into TED - 4 Office Remaining Material – Monday Following Move – Usable furniture will be redistributed. Contact Lamont in there are needs – Pictures/etc will be removed from walls and stored until new location determined Items to be Moved into Test Lab Addition – Needs to be tagged with room number Excess Material/Storage for future use in Test Lab – Using Test Lab High Bay for staging – Items removed to off site storage weekly Keyboard Trays, Chair Mats, Task Lighting – Will be available through the Stockroom in 2-3 weeks

Technical Space Moves into TED SRF Technical Space Moves will occur the week following the office moves – David Fazenbaker will coordinate with each individual group

Getting Around Parking – CEBAF Center or EEL parking lots Service Yard – No privately owned vehicle parking – Delivery vehicles/GSA vehicles/Golf Carts During Transition – Marked walk path will be established between Test Lab and TED

Building Rules Visitor Entry – Initially front desk will be vacant – Recommend visitors call you to let them in the front door – Will need to sign in/out at front desk (Same procedure as VARC) – Will have a sign on the front door Lockers – 14 men’s and 14 women’s lockers provided – Locks applied only during use, not overnight Do Not Post items on walls or outside of workstations – Exception office/name signs No-Smoking – Within 25 feet of any door – In front of the building – Smoking Shed will be relocated

Wrap-up We will send out messages with any changes Please contact Mike Davenport with any building issues Please contact David Fazenbaker with any move questions Questions??