Il Project Cycle Management :A Technical Guide The Logical Framework Approach 1 1.

Slides:



Advertisements
Similar presentations
Gender Perspective in the Cycle of Operations
Advertisements

Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
PROJECT CYCLE MANAGEMENT (PCM)
Results-Based Management: Logical Framework Approach
INSTITUTO DE ESTUDIOS POLÍTICOS PARA ÁMERICA LATINA Y ÁFRICA LOGICAL FRAMEWORK APPROACH HUMANA.
Project Cycle Management (PCM)
Action Implementation and Evaluation Planning Whist the intervention plan describes how the population nutrition problem for a particular target group.
Results-Based Management: Logical Framework Approach
1 Module BASICS OF PLANNING. 2 Content Overview Planning principles Gantt charts.
Project Management Lecture 5+6 MS Saba Sahar.
CASE STUDIES IN PROJECT MANAGEMENT
Developing the Logical Frame Work …………….
Monitoring Evaluation Impact Assessment Objectives Be able to n explain basic monitoring and evaluation theory in relation to accountability n Identify.
Initiating and Planning Systems Development projects
Objective- and Strategic Analysis
CONCEPT PAPER RESULT BASED PLANNING. RESULT-ORIENTED PLANNING Overall Objective/ Goal Specific Objective/ Purposes Expected Result/ Output Activities.
TEMPUS IV- THIRD CALL FOR PROPOSALS Recommendation on how to make a good proposal TEMPUS INFORMATION DAYS Podgorica, MONTENEGRO 18 th December 2009.
This project is funded by the EUAnd implemented by a consortium led by MWH Logical Framework and Indicators.
Lesson 5 – Logical Framework Approach (LFA)
Evaluation methods and tools (Focus on delivery mechanism) Jela Tvrdonova, 2014.
1 RBM Background Development aid is often provided on a point to point basis with no consistency with countries priorities. Development efforts are often.
The role of assumptions
IPA Funds Programme Management sept Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
TEMPUS IV- Quick recommendations on how to make a good proposal Jordanian National Tempus Information Day 15/12/2010 Jordanian University.
Developing Indicators
Project design & Planning The Logical Framework Approach An Over View Icelandic International Development Agency (ICEIDA) Iceland United Nations University.
KEYWORDS REFRESHMENT. Activities: in the context of the Logframe Matrix, these are the actions (tasks) that have to be taken to produce results Analysis.
Results Based Management: Logical Framework Matrix (LFM) December 30 th, 2009 Abeer Shakweer, Ph.D., Planning and Monitoring Manager Science and Technology.
INTRODUCTION TO PROJECT PLANNING AND APPRAISAL LOGICAL FRAME WORK PREPARED BY GEORGE BOTCHIE.
IPA Funds Programme Management sept Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
The LOGICAL FRAMEWORK Scoping the Essential Elements of a Project Dr. Suchat Katima Mekong Institute.
An introduction to the Logical Framework Approach (LFA) Identi- fication Development Formulation and appraisal ApprovalInception Implemen- tation Closure.
MOD 6050 PROJECT MANAGEMENT AND FUND RAISING TOPIC – PROPOSAL WRITING AND FUNDRAISING (WK 6 &8) LECTURER: DR. G. O. K’AOL.
LOGICAL FRAMEWORK by Lorelyn T. Dumaug.
Promising Ideas and Issues to Consider in Reaching Reading and Literacy Goals Logistics of supervision, training, support to teachers Sakil Malik Director.
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Participatory Planning Project Cycle Management (PCM)
UK Aid Direct Introduction to Logframes (only required at proposal stage)
Screen 1 of 22 Food Security Policies – Formulation and Implementation Policy Monitoring and Evaluation LEARNING OBJECTIVES Define the purpose of a monitoring.
Preparing proposals for funding RIMC Research Capacity Enhancement Workshops Series : “Achieving Research Impact”
Project Management Learning Program 23 Mar – 3 Aprl 2009, Mekong Institute, Khon Kaen, Thailand Managing for Development Results Results-Oriented Monitoring.
Advanced Engineering Projects Management Dr. Nabil I El Sawalhi Associate Professor of Construction Management 1AEPM 4.
M&E TRAINING MODULES Different tools for different applications.
Logical Framework Slide 1 Mekong Institute & UNESCO Regional Office-Bangkok 23 February – 6 March 2009; Khon Kaen, Thailand Prepared by the Education Policy.
1 Tempus Tempus Workshop Sarajevo 7 June 2006 « Good practice in Preparing an Application » Anne Collette European Training Foundation Tempus Department.
0 ©2015 U.S. Education Delivery Institute While there is no prescribed format for a good delivery plan, it should answer 10 questions What a good delivery.
Grant Application Form (Annex A) Grant Application Form (Annex A) 2nd Call for Proposals.
Logical Framework Approach 1. Approaches to Activity Design Logical Framework Approach (LFA) – Originally developed in the 1970s, this planning process.
The Logical Framework (Log Frame). Programs & Projects Programs Broad areas of work required to implement policy decisions. Usually focused on a sector.
S3.1 session day 5 2 Programme management download resources from Approved by the Advisory Group: Programme management Programme and project.
Logical Framework Approach An Evaluation Toolbox Presentation
Folie 1 Sarajevo, October 2009 Stefan Friedrichs Managing Partner Public One // Governance Consulting Project Management in the Public Sector Monitoring.
WORKSHOP ON PROJECT CYCLE MANAGEMENT (PCM) Bruxelles 22 – 24 May 2013 Workshop supported by TAIEX.
Building an ENI CBC project
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 3. Session 9. Periodic data collection methods.
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 2. Session 5. Review of the organizational strategy.
Project Cycle Management
The Logical Framework Approach
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 2. Session 6. Developing indicators.
Day 2 The LogFrame.
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 3. Session 7. Managers’ and stakeholders’ information needs.
Logical Framework I want to design a project by planning out the logic
Session 9 Recap on LFM and IL.
Helene Skikos DG Education and Culture
Good practice in preparing an application
Logframe Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu.
Civil Society Facility and Media Programme Call for proposals: EuropeAid/162473/DH/ACT/Multi Webinar no. 3: Preparing effective Concept Note.
Integrating Gender into Rural Development M&E in Projects and Programs
How is an M & E framework derived from the logframe?
Presentation transcript:

Il Project Cycle Management :A Technical Guide The Logical Framework Approach 1 1

The Project Cycle

Project has to be Project Cycle Management supportive relevant feasible sustainable 3

an analytical process and; a set of tools. The Logical Framework Approach is: an analytical process and; a set of tools. It is used to support project planning and management. It should be thought as an “aid to thinking” = it allows information to be analysed and organised in a structured way

Logical Framework Approach (LFA) Difference between: Logical Framework Approach (LFA) is an analytical process (involving stakeholder analysis, problem analysis, objective setting and strategy selection) Logical Framework Matrix (LFM) (while requiring further analysis of objectives, how they will be achieved and potential risks) also provides the documented product of the analytical process

Typical structure of a Logframe Matrix

LFA two main stages Analysis Phase Planning Phase Stakeholder analysis identifying and characterise potential stakeholders assess their capacity Problem analysis identifying - key problems - constraints - opportunities determining cause-effect relationships Objective Analysis developing solutions from the identified problems identifying means to end relationships Strategy Analysis identifying different strategies to achieve solutions selecting most appropriate strategy Planning Phase = the results of analysis are transcribed into a practical, operational plan ready to be implemented Developing Logical Framework matrix defining project structure testing logic and risks formulating measurable indicators of success Activity Scheduling determining the sequence and dependency of activities estimating their duration assigning responsibility Resource Scheduling from the Activity Schedule, developing input schedules and a a budget

The Planning stage Information contained in the Logframe Matrix

The necessary and sufficient conditions The Planning stage First Column (Intervention Logic) The necessary and sufficient conditions Achieving the purpose is necessary but not sufficient to attain the overall objective; Producing the project results is necessary but may not be sufficient to achieve the purpose; Carrying out project activities should be necessary and sufficient to achieve results; Inputs should be necessary and sufficient to deliver the results.

The Planning stage First Column (Intervention Logic) Writing objective statements Objective statements in the Logframe Matrix should be kept as clear and concise as possible. It is also useful to standardise the way in which the hierarchy of project objectives is described. A useful convention to follow in this regard is: has/have to be expressed in terms of Overall objective in terms of “to contribute to...” Purpose in terms of benefit to the target group being “increased/improved/etc” Results in terms of a tangible result “delivered/produced/conducted/etc” Activities in the present tense starting with an active verb such as “prepare, design, construct, research”

The Planning stage Fourth Column Assumptions

Objectively* Verifiable Indicators (OVI) The Planning stage Second and third columns Indicators and Source of Verifications Objectively* Verifiable Indicators (OVI) describe the project’s objectives in operationally measurable terms (quantity, quality, time, or QQT). They are formulated in response of the question: “How would we know whether or not what has been planned is actually happening or happened? How do we verify success?” *The meaning of Objectively Verifiable indicator s that the information collected should be the same if collected by different people.

Objectively Verifiable Indicators (OVI) The Planning stage Second and third columns Indicators and Source of Verifications Objectively Verifiable Indicators (OVI) OVI’s should be measurable in a consistent way and at an acceptable cost. OVI’s should be defined: during the Formulation Stage but they often need to be specified in greater detail during Implementation.

A good OVI should also be SMART: The Planning stage Second and third columns Indicators and Source of Verifications A good OVI should also be SMART: Specific to the objective it is supposed to measure; Measurable (either quantitatively or qualitatively); Available at an acceptable cost; Relevant to the information needs of managers; Time-bound – so we know when we can expect the objective/target to be achieved

Source of Verification (SOV) The Planning stage Second and third columns Indicators and Source of Verifications Source of Verification (SOV) It should be considered and specified at the same time as the formulation of indicators. It should specify: HOW the information should be collected and/or the available documented source; WHO should collect/provide the information; WHEN/HOW REGULARLY it should be provided The main point is to build it on existing systems and sources (where possible and appropriate) before establishing new ones.

Link between Logframe and Indicators Terminology The Planning stage Second and third columns Indicators and Source of Verifications Link between Logframe and Indicators Terminology Logframe Objective Terminology Overall Objective Purpose Result Indicator Terminology Impact indicators Outcome indicators Output indicators

Completing the draft Logframe Matrix Example of key elements

Exercise #4 The Logframe Matrix

Cristiana Turchetti http://www.eipa.eu Contact Address Seconded National Expert Tel. +31 43 3296 290 Fax +31 43 3296 296 E-mail: c.turchetti@eipa.eu Consult our EIPA web site: http://www.eipa.eu 19