AGENDA  PROJECT HISTORY  NORTHERN SECTION UPDATE  SOUTHERN SECTION OVERVIEW  INTERCHANGES  PROJECT SCHEDULE  UPCOMING ACTIVITIES  OPEN DISCUSSION.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

Tracy Lovell, PE A FOCUSED APPROACH TO SAFETY. Provide a Transportation System  Safe  Efficient  Environmentally Sound  Fiscally Responsible.
Statewide Traffic Engineers Meeting Rumble Strip(e) June 16, 2011 Simone Ardoin Assistant Road Design Engineer Administrator.
Oklahoma Department of Transportation Susan McClune Regulatory Services.
1 Canyonero Parkway Cost Estimate Review Close out presentation October 5, 2007.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
OPEN HOUSE PUBLIC MEETING FOR LA 86 & LA 320: ROUNDABOUT IBERIA PARISH State Project No. H Federal Aid Project No. H
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
New I-65 Interchange at Worthsville Road Welcome!.
State Aid Design-Build Project Delivery for Minnesota Cities and Counties.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
Corridor #5 Update United States Senate Briefing September 26, 2007.
Environmental Assessment Public Meeting
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Dowell Road Widening From South of HG Truman Road To South of Bean Road Calvert County, Maryland.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
Longmeadow Parkway Fox River Bridge Corridor
I-65 Added Travel Lanes Project in Tippecanoe County
ACEC CENTRAL CHAPTER DISTRICT 3-0 PROJECT PORTFOLIO FEBRUARY 2015 Sandra Tosca, P.E. District Executive.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
Highway 169 Phase 2 (Part 2) – Cross Range Expressway April 30, 2014 Public Information Meeting Taconite Community Center.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Oversight Team Meeting December 11, INTRODUCTIONS (15 MINUTES) Name and affiliation Purpose of meeting/ review agenda Edits to September’s Oversight.
CEAL January 31, Existing Alternative (Preferred Align) Objectives SR-76 Corridor Expand Mobility Improve Safety Enhance natural resources Synergy.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
1 C E T A S Purpose and Need Presentation Date Project Name Project location (city, county) ODOT Key Number:
1 C E T A S Triage Presentation, Date Project Name Project location (city, county) ODOT Key Number:
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Dane County Department of Public Works, Highway & Transportation Jerry Mandli, P.E. Commissioner/ Director.
HIGHWAY DEPARTMENT Tim G. Schulte, P.E. Richland County Engineer.
Mass Highway Department (MHD) Design Process Anticipate possible use of MHD funds Anticipate possible use of MHD funds New Design Guide for Project Development.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
STA Safety Project PID #76439 December 12, 2006.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
US 25 Corbin to London Citizens Advisory Committee Meeting December 2011.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
FACS-STIP Tool – Overview (Features, Attributes & Conditions Survey – Statewide Transportation Improvement Program) April 2010 Presentation for Roadway.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
New Jersey Turnpike Authority November 19, 2009 New Jersey Turnpike Interchange 6 to 9 Widening Program Presented by Lisa M. Kenney, P.E. 1.
PROPOSED US 34 IMPROVEMENT (4-LANE EXPRESSWAY). CARMAN RD. TO TR 111 (1350 E) – (8.1 MILES) Construction Plan Preparation – Funded (Strand Assoc.) Plan.
Geometric Design: General Concept CE331 Transportation Engineering.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
Transportation Improvement Board Urban Funding Opportunities June 2010.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
State Route 28/U.S. Highway Route 127 Improvements Project Fentress County, Tennessee Public Hearing March 15, 2011 South Fentress Elementary School 5018.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects the current highway location in order to continue.
Visit Our Website at: Click to edit Master title style.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
S.R. 30A / U.S. 98 / Panama City Beach Parkway
FOR LOCAL AGENCY FEDERAL AID PROJECTS
Public Information Meeting NW 100th Street Reconstruction Project
General Tab Project, Cost Schedule, and Work Limits Roadway Character
SR 25 – Hoosier Heartland Highway Lafayette to Logansport
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
FOR LOCAL AGENCY FEDERAL AID PROJECTS
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Presentation transcript:

AGENDA  PROJECT HISTORY  NORTHERN SECTION UPDATE  SOUTHERN SECTION OVERVIEW  INTERCHANGES  PROJECT SCHEDULE  UPCOMING ACTIVITIES  OPEN DISCUSSION & GROUP QUESTIONS  ONE-ON-ONE QUESTIONS (OPEN HOUSE) SR 15 SECTION 088 CSVT SOUTHERN SECTION

PROJECT HISTORY 1994– Studies initiated 2003 – Final Environmental Impact Statement (FEIS) approved – Record of Decision issued and project alignment established 2006– Northern Section final design initiated 2008– Project placed on hold 2013– Act 89 passed (funding identified) and project reactivated 2015– Southern Section final design initiated – Financial Plan submitted to Federal Highway Administration (FHWA) SR 15 SECTION 088 CSVT SOUTHERN SECTION

PROJECT PURPOSE (from 2003 FEIS):  Reduce Congestion and Accommodate Growth: –By 2020, traffic is anticipated to more than double on area roadways, and without CSVT, nearly all primary roadways will be congested.  Improve Safety: –6 miles of primary roadways exceed statewide average crash rate, and 8 miles exceed statewide average fatal crash rate.  Separate Trucks and Through Traffic from Local Traffic: –Over 50% of autos and over 90% of trucks pass through project area. –Nearly 50% of accidents involve a truck. SR 15 SECTION 088 CSVT SOUTHERN SECTION

SR 15, SECTION 088 CSVT SOUTHERN SECTION

NORTHERN SECTION SR 15, SECTION 088 CSVT SOUTHERN SECTION

NORTHERN SECTION SR 15, SECTION 088 CSVT SOUTHERN SECTION FINAL DESIGN RIGHT-OF-WAY ACQUISITION UTILITY COORDINATION PERMIT- TING FEIS REEVAL. RIVER BRIDGE CONSTRUCTION EARTHWORK AND NON-RIVER STRUCTURES CONSTRUCTION PAVEMENT CONSTRUCTION

PROPOSED WEST BRANCH SUSQUEHANNA RIVER BRIDGE SR 15 SECTION 088 CSVT SOUTHERN SECTION

DESIGN TEAM

TYPICAL SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION

CSVT QUICK FACTS SR 15 SECTION 088 CSVT SOUTHERN SECTION  7.2 Miles of New Roadway  4.27 Million CY of Excavation  13 New Bridges  319,000 SY of Pavement Fill Beaver Stadium over 5 Times Pave 50 football fields (plus endzones)

A COUPLE OF NOTES BEFORE WE LOOK AT THE ALIGNMENT… SR 15 SECTION 088 CSVT SOUTHERN SECTION  No major alignment changes anticipated  Design team currently looking at adjustments  Reasons for future adjustments  Embankment, excavation slopes  Minimizing impacts  Improving intersection/interchange efficiency  Making bridges more efficient  Unexpected conditions  Stormwater management development

REVIEW OF CSVT SOUTHERN SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION

INTERCHANGES SR 15 SECTION 088 CSVT SOUTHERN SECTION  Selinsgrove Interchange  Route 61 Connector Interchange  Shamokin Dam Interchange

Selinsgrove Interchange

SR-61 Connector Interchange

Shamokin Dam Interchange

o Prior to starting construction o Report new and substantial impacts, applicable new laws/regulations, noteworthy changes in existing condition o Bridges o Clear land o Earthwork o Drainage o Earthwork, bridges, paving, signals o Paving o Guiderail o Signs and Signals o Ultimate objective - contract documents and plans o Major components - roadway, bridges, soils, traffic, environmental PROJECT SCHEDULE SR 15 SECTION 088 CSVT SOUTHERN SECTION o On-going process. o Approximately 30 parcels acquired; 60 parcels remain o Several utilities affected by CSVT o Examples; proposed UGI gas line, Aqua wells, PPL – ash basins and transmission/distribution. o Earth disturbance permit – PADEP, Snyder County Conservation District. o Permit for wetlands/waterways from PADEP and USACE.

WHY SEPARATE CONSTRUCTION CONTRACTS?  More competitive bidding  Fits with anticipated funding levels  Through traffic on CSVT before Connector Construction SR 15 SECTION 088 CSVT SOUTHERN SECTION

IMPACT TO THE PUBLIC DURING DESIGN AND CONSTRUCTION  Survey Crews  Soil Boring Crews  Traffic Control During Construction SR 15 SECTION 088 CSVT SOUTHERN SECTION

 Public Meetings  Sound Barrier Coordination  Well Survey, Blasting Inspection  Right-of-Way Acquisition SR 15 SECTION 088 CSVT SOUTHERN SECTION OTHER COORDINATION WITH PUBLIC

WHAT IF MY LAND IS NEEDED?  “Just Compensation” = Fair Market Value + Other Benefits  PennDOT Right-of-Way Staff …  present tonight to answer questions  will personally contact every affected landowner at appropriate time to begin the process. SR 15 SECTION 088 CSVT SOUTHERN SECTION

UPCOMING ACTIVITIES  Develop Alternatives – Now  Survey – Underway  Soil Borings – Beginning late Summer 2015  Subsurface Utility Engineering – Summer 2015 SR 15 SECTION 088 CSVT SOUTHERN SECTION

HOW DO I GET INFORMATION?  Attend Public Meetings  Visit Project Web Site – csvt.com  Contact PennDOT Project Manager Maggie Jackson SR 15 SECTION 088 CSVT SOUTHERN SECTION

OPEN DISCUSSION & GENERAL QUESTIONS SR 15 SECTION 088 CSVT SOUTHERN SECTION