PROPOSED US 34 IMPROVEMENT (4-LANE EXPRESSWAY). CARMAN RD. TO TR 111 (1350 E) – (8.1 MILES) Construction Plan Preparation – Funded (Strand Assoc.) Plan.

Similar presentations


Presentation on theme: "PROPOSED US 34 IMPROVEMENT (4-LANE EXPRESSWAY). CARMAN RD. TO TR 111 (1350 E) – (8.1 MILES) Construction Plan Preparation – Funded (Strand Assoc.) Plan."— Presentation transcript:

1 PROPOSED US 34 IMPROVEMENT (4-LANE EXPRESSWAY)

2 CARMAN RD. TO TR 111 (1350 E) – (8.1 MILES) Construction Plan Preparation – Funded (Strand Assoc.) Plan Preparation has been put on hold due to levee decertification The Phase I study and Environmental Impact Statement (EIS) will be re-opened for this section during 2012 Currently working with FHWA to the define scope of work Cost estimates will be revised as the study progresses

3 TR 111 TO TR 190 E OF BIGGSVILLE WITH INTERCHANGE (4.7 MILES) Construction Plan Preparation – Funded (Poepping, Stone, Bach & Assoc.) Utility Adjustments – Funded Land Acquisition – Funded Construction Engineering – Funded Construction – Funded Plan Preparation and Land Acquisition are underway Anticipate Late Fall 2012 Letting Funded through the Illinois Jobs Now! Program

4 TR 190 EAST OF BIGGSVILLE TO S. OF KIRKWOOD (4.5 MILES) Construction Plan Preparation – Funded (Geotech Engineering & Testing) Plan Preparation nearing completion

5 S. OF KIRKWOOD TO US 67 AT MONMOUTH (6.7 MILES) Construction Plan Preparation – Funded (CMT) Plan Preparation nearing completion