S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.

Similar presentations


Presentation on theme: "S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m."— Presentation transcript:

1 S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.

2 Welcome Purpose and explanation of public meeting Public meeting format Visit our sign-in table Informational handouts Submitting public comments Informal Q & A following formal presentation and comment session

3 Six district offices 3,543 employees $1 billion/annual capital expenditures 28,400 total roadway lane miles 5,300 INDOT-owned bridges Assists 42 railroads in planning & development of more than 3,880 miles of active rail lines Supports 69 Indiana State Aviation System Plan airports INDOT Profile

4 INDOT INDOT Mission INDOT will plan, build, maintain and operate a superior transportation system enhancing safety, mobility and economic growth INDOT Values Respect Teamwork Accountability Excellence

5 Public Meeting Sign-in attendance information will be added to project mailing list. A public meeting notice was mailed to known property owners within project area. Announcement of this public information meeting was posted to INDOT website at: http://www.in.gov/indot/2370.htm http://www.in.gov/indot/2370.htm Electronic notification via e-mail

6 Project Stakeholders Indiana Department of Transportation Indiana Division Federal Highways Administration Scott County City of Austin Elected Public Officials Community residents and local citizens Emergency Services Commuters Trucking Industry Commercial District / local businesses Schools

7 S.R. 256 Road Reconstruction Indiana Department of Transportation Indiana Division Federal Highway Administration Bill Read, INDOT Project Manager, Seymour District Office VS Engineering – Design Consultant

8 S.R. 256 Road Reconstruction Project information Plan status Right-of-way status Utility status Letting

9 Project Purpose Enhance safety and mobility of roadway users Improve traffic flow Improve roadway pavement and bridge condition Upgrade existing drainage Meet current INDOT geometric design standards for 55 mph design speed

10 Project Need Narrow travel lane widths Lack of shoulders Non-traversable ditch side slopes Substandard bridge safety Improve sight distance Improve roadside safety

11 Project Description City of Austin to 1,200 ft. east of S.R. 203 Total project length - 5.0 miles Two 12 ft. wide travel lanes 6 ft. wide usable shoulder (4 ft. paved) Driveway reconstruction Realigned S.R. 256 and Coffee Pot Rd. near Austin Cemetery Replace bridge over Hutto Creek

12 Project Description Small drainage structure replacement at various locations Public road approaches at intersections Passing blister and mailbox approaches Exclusive left turn lane at S.R. 203 Pavement markings & signage

13 Typical Section

14 Maintenance of Traffic Maintain local access to all residences, schools, and businesses during construction using side streets, temporary entrances, or other appropriate means Detour through-traffic to State maintained routes using portions of U.S. 31, S.R. 56, and S.R. 3 Close S.R. 256 to through-traffic during construction Local access maintained via local detour during bridge and culvert(s) construction

15 Maintenance of Traffic

16 Project Schedule Public Meeting - February 2014 Public Hearing – Late 2014 Real Estate Acquisition Activities – Spring 2014 thru Summer 2016 Bid Letting – Late 2016 Construction – 2017

17 Real Estate Acquisition

18 Uniform Act of 1970 as amended by the Uniform Relocation Act of 1987 All federal, state, and local governments must comply established standards Acquisition Process Appraisals Review Appraisals Negotiations Process requires just compensation INDOT real estate representatives will contact property owners and work with them through process

19 Submit Public Comments Submit public comments using the options described in 1 st page of information packet Public Comment Form Via e-mail Participating during public comment session via microphone INDOT respectfully requests comments be submitted to: INDOT Seymour District Customer Service Center,185 Agrico Lane, Seymour, Indiana 47274 Toll Free Phone 1-877-305-7611 E-mail: secommunications@indot.in.govsecommunications@indot.in.gov

20 Thank You Please visit with INDOT project officials Project Open House Project maps, displays, public comments table INDOT project officials available for informal Q & A Thank you for your attendance this evening http://www.in.gov/indot/2706.htm