John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur.

Slides:



Advertisements
Similar presentations
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
Advertisements

DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science OECM Limited-External Independent.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
John Arthur X-ray November 11, 2008 SLAC National Accelerator Laboratory 1 X-ray Overview LCLS Directorate structure.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project The Instrument Readiness Review Process John Arthur LCLS Experimental Facilities Division.
Stefan Moeller Revised XES April 7, 2005 Revised X-Ray Endstation Scope Stefan Moeller.
David Saenz FAC CF Oct 12-13, 2004 Experimental Facilities Overview - NEH 24” thick concrete 36” thick concrete 10m x.
John Arthur X-ray June 17, X-ray Overview XTOD current status XES current status Schedule to first experiments.
Diffraction studies of stimulated dynamics (pump-probe) Coherent-scattering studies of nanoscale fluctuations Atomic, molecular and optical science High.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
John Arthur Photon October 18, 2005 LCLS Photon Systems Status John Arthur SLAC.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
David Saenz CF Oct 30, CF MEP Commissioning.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
John N. Galayda LCLS FAC October Linac Coherent Light Source Overview and Charge Facility Advisory Committee.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
John N. Galayda LCLS Facility Advisory 29 October 2007 Linac Coherent Light Source Overview 29 October 2007  Project.
Stefan Moeller X-Ray October 27, X-Ray Detectors Stefan Moeller.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
Hal Tompkins Photon October 30, LCLS Photon Systems Installation and Commissioning Presentation to Facility Advisory.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
Stefan Moeller Exp. Areas Conventional October 24, Experimental Areas - Conventional Facilities Stefan Moeller.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
John Arthur Photon Systems April 7, 2005 Photon Systems Overview John Arthur.
24 April 2015 FY 2016 Budget Request to Congress for DOE’s Office of Science Dr. Patricia M. Dehmer Acting Director, Office of Science
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
LUSI Coordination with LCLS
Experimental Facilities Planning
LCLS Ultrafast Science Instruments
WBS 5.0 LCLS Strategic Projects Division
Stefan Moeller – XES Manager May 14, 2009
Development of LCLS Far Experimental Hall Hutches
Electron Beam Systems ETC and Methodology
X-Ray Endstation Design & Management/Commissioning
X-Ray Endstations Update
Conventional Facilities (WBS 1
Project Management Issues John N. Galayda, SLAC April 24, 2002
Endstation Systems, Installation Costs and Schedule J. Hastings
Experimental Program and Endstations System (WBS ) J
John Arthur – LCLS Experimental Operations
NEH - Status Stefan Moeller.
The Transition to User Operations
PIXEL Project Status John Arthur Photon Instrumentation for
Coherent X-ray Imaging Instrument WBS 1.3
Conventional Facilities Status
DOE Review 7-9 February, 2006 Steve Lewis
Linac Coherent Light Source Transition to Operations 11 July 2007
Conventional Facilities
X-Ray Endstation Design & Management/Commissioning
X-Ray Endstation Systems (XES) 2006 Schedule
LCLS Photon Systems Overview
Presentation transcript:

John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur

X-Ray Endstation April 29, 2004 The Endstation Systems will provide: Personnel protection systems (PPS) Keep people safe from x-rays, lasers, etc. Machine protection systems (MPS) Keep delicate machine safe from clumsy people Network and computer support Cables, networks, servers, data storage Beamline controls Hardware, software Synchronized laser system fs laser system synchronized to FEL Prototype detectors Basic experimental chambers Instrumentation for initial atomic physics experiments

John Arthur X-Ray Endstation April 29, 2004 Where the Endstation Systems are located Near Expt Hall Far Expt Hall 250 m

John Arthur X-Ray Endstation April 29, 2004 The Near Experimental Hall

John Arthur X-Ray Endstation April 29, 2004 The Near Experimental Hall FEL beam Experimental hutches Laser room above hutches Shops, setup space

John Arthur X-Ray Endstation April 29, 2004 The Far Experimental Hall

John Arthur X-Ray Endstation April 29, 2004 FEL beams Experimental hutches Laser room Office and shop space The Far Experimental Hall

John Arthur X-Ray Endstation April 29, ’ 9” 21’ The FEH is underground

John Arthur X-Ray Endstation April 29, 2004 Placement of the endstation systems

John Arthur X-Ray Endstation April 29, 2004 NEH North-Hutch South-Hutch Laser Room FEE Hutch 1Hutch 2Hutch 3 Atomic Physics Experiments FEH Tunnel Laser Room Center Hutch Controls System Inst. & Alignment Laser Systems Mechanical/Vacuum X-Ray Detectors Placement of the endstation systems

John Arthur X-Ray Endstation April 29, 2004 Work Breakdown Structure for the endstation systems

John Arthur X-Ray Endstation April 29, 2004 Principal divisions and staffing Management Controls Mechanical, Vacuum LasersDetectorsAtomic Physics J. Arthur S. Moeller 9 people2 people 1 person2 people Project Planning J. Scholes Science Advice J. Hastings

John Arthur X-Ray Endstation April 29, 2004 Staffing profile YearFY04FY05FY06FY07FY08 Total XES staff who is hiredmanagementgroup heads controls group everyone else Begin hiring additional staff needed for facility operations, using pre-ops funding 2030

John Arthur X-Ray Endstation April 29, 2004 Example of task schedule: FEE cabling Installation schedule tied to completion of conventional construction in 2007

John Arthur X-Ray Endstation April 29, 2004 COST Report – Construction, R&D Grand Total $17.9M work peaks in FY07

John Arthur X-Ray Endstation April 29, 2004 COST Report – Commissioning Grand Total $670k

John Arthur X-Ray Endstation April 29, 2004 Major endstation systems milestones Level 2 PPS certified in NEH10-07 PPS certified in FEH1-08 LCLS start operation Level 3 FY04 TDR Complete detailed schedule EIR review Complete 2D detector statement of work Award initial R&D funding for 2D detector FY05 Design review #1 for 2D detector FY06 Network final design review Laser final design review Order lasers Design review #2 for 2D detector FY07 Start installation in NEH Start installation in FEH Beamline controls final design review Laser operating in NEH Laser operating in FEH Complete installation in NEH FY08 Complete beamline controls Complete network and cabling Complete mech/vacuum Complete acceptance tests of detectors First atomic physics experiment