John Arthur X-ray June 17, 2008 1 X-ray Overview XTOD current status XES current status Schedule to first experiments.

Slides:



Advertisements
Similar presentations
John Arthur X-ray October 12, 2004 X-Ray Detector Program Status John Arthur.
Advertisements

Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
James Welch October 30, FEL Commissioning Plans J. Welch, et. al. FEL Commissioning Plans J. Welch, et. al. Accelerator.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
John Arthur X-ray November 11, 2008 SLAC National Accelerator Laboratory 1 X-ray Overview LCLS Directorate structure.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project The Instrument Readiness Review Process John Arthur LCLS Experimental Facilities Division.
Stefan Moeller Revised XES April 7, 2005 Revised X-Ray Endstation Scope Stefan Moeller.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
John Arthur Photon October 18, 2005 LCLS Photon Systems Status John Arthur SLAC.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
1 Michael Rowen 1 SXR Instrument FAC SXR Instrument Michael Rowen – Engineering Physicist June 9, 2009.
John N. Galayda LCLS Facility Advisory 29 October 2007 Linac Coherent Light Source Overview 29 October 2007  Project.
John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur.
Richard M. Bionta X-Ray Transport, Diagnostic, & Commissioning September 22, 2004 UCRL-PRES Two Problems... LCLS Diagnostics.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Stefan Moeller X-Ray October 27, X-Ray Detectors Stefan Moeller.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
Hal Tompkins Photon October 30, LCLS Photon Systems Installation and Commissioning Presentation to Facility Advisory.
1 Sébastien Boutet 1 Coherent X-ray Imaging Instrument FAC Meeting, June Coherent X-ray Imaging Instrument Sébastien Boutet.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
John Arthur Photon Systems April 7, 2005 Photon Systems Overview John Arthur.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
Lawrence Livermore National Laboratory This work performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory.
1 E. Bong 1 XCS Final Instrument Design Review Engineering Status April 21, 2009 LUSI WBS 1.4 X-Ray Correlation Spectroscopy Final.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 1 From construction project to operating facility Structure.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
John N. Galayda DESY October 8, LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
Experimental Facilities Planning
LCLS Ultrafast Science Instruments
X-ray Pump-Probe Instrument
Hal Tompkins – Photon Beam Systems Deputy June 8, 2009
Linac Ops Budget Review LCLS Overview / Org Structure / Legacies
Stefan Moeller – XES Manager May 14, 2009
John N. Galayda – Director of LCLS Construction March 30, 2009
Installation of Photon Beam Transport to FEH
X-Ray Transport, Optics, and Diagnostics WBS Alan J
X-Ray Endstations Update
LUSI Controls and Data Systems W.B.S. 1.6
John Arthur – LCLS Experimental Operations
FEE Diagnostics and Commissioning
NEH - Status Stefan Moeller.
The Transition to User Operations
PIXEL Project Status John Arthur Photon Instrumentation for
Coherent X-ray Imaging Instrument WBS 1.3
X-ray Correlation Spectroscopy Instrument
Hal Tompkins – Photon Beam Systems Deputy May 14, 2009
DOE Review 7-9 February, 2006 Steve Lewis
Linac Coherent Light Source Transition to Operations 11 July 2007
X-Ray Endstation Design & Management/Commissioning
LCLS Lehman Review February 7-9, 2005
X-Ray Endstation Systems (XES) 2006 Schedule
LCLS Control System Personnel Linac & BC2 Controls progress
LCLS Instrument MIE Project: Staffing, Schedule
LCLS Photon Systems Overview
LUSI Controls and Data Systems W.B.S. 1.6
Presentation transcript:

John Arthur X-ray June 17, X-ray Overview XTOD current status XES current status Schedule to first experiments Coordination with LUSI Transition from project to facility Beyond the LCLS baseline John Arthur LCLS Photon Systems Manager

John Arthur X-ray June 17, Status in June 2008 XTOD is assembling instruments at LLNL All mirrors have been ordered Soft X-ray mirrors arriving; meet figure spec XES is working on final designs Stoppers and doors are being built 2d detector plan is updated; prototype under test at Cornell, SLAC working on packaging and interface to DAQ

John Arthur X-ray June 17, XTOD

John Arthur X-ray June 17, Solid Attenuator Gas Attenuator Slit Start of Experimental Hutches 5 mm collimator Muon Shield Hard X-Ray Offset mirror system Pulse Energy Thermal Detector Gas Detector e-e- Direct Imager Hard x-ray Monochromator (K Spectrometer) Soft X-Ray Offset mirror system LLNL Front end X-ray optics being assembled at LLNL  Optics/diagnostics through preliminary or final design review X-ray front end

John Arthur X-ray June 17, FEE Diagnostic Hardware Status Fixed Mask / Slit In house, Integrated testing Attenuator Under assembly Gas Detectors In house/integrating Thermal Sensor Vessel on order Sensors in fabrication Direct imager Vessel on order Cameras, scintillators, filters in house K monochromator in final design Pop-in Monitors in design Controls 4 of 5 FY08 FEE racks complete FEE Vacuum Rack >75% 98% of all other controls h/w received

John Arthur X-ray June 17, InSync Serial Number P07112_1 (SOMS 1) 9nm Tangential axis, mm Sagittal axis, mm Figure, nm The first SOMS mirror meets its specification for long spatial period flatness Contour plot with 10x175 mm 2 mask Color map of 250x50 mm 2 SOMS 1 figure Total budget for long scale curvature is < 20 nm tangential, < 5 nm sagittal* - limits intensity asymmetry due to reflections to < 10% Allocation to fabrication errors was 10 nm tangential, 4 nm sagittal - contour plot shows SOMS 1 meets this requirement * See detailed figure budget in ESD , “HOMS & SOMS Opto-mechanical Design”

John Arthur X-ray June 17, Integrated EPICS control system under development

John Arthur X-ray June 17, X-ray Endstation Systems NEH nearly ready for occupants

John Arthur X-ray June 17, XES Status June 08 AMO Instrument final design phase Drawings >60% complete All ESDs are completed Controls PDR 4/08 AMO Preliminary Hazard Analysis Document being finalized Long-lead procurements starting Mechanical Systems PPS stoppers and hutch doors in fabrication Ready for installation in 7/09 XES laser system PRDs for Laser system and LSS completed ESD for Laser transport controls 3/08 PDR for laser and transport system May 21 Quotes are in hand for tables and laser components Laser SOP reviewed by LSO and LSC May 6 Installation Cable plant are being designed, contracts are being placed

John Arthur X-ray June 17, AMO Instrument John Bozek

John Arthur X-ray June 17, AMO Schedule Begin long lead procurements 5/08 Final Design complete 8/08 Procurements 10/08 Start Receiving hardware 12/08 Receive XES Laser 3/09 Install Laser 4-6/09 AMO Assembly and test 12/ /09 Install AMO (phase 1) in hutch 5/09 – 6/09 Test AMO 7/09 Final readiness test 7/09 1 st x-rays to AMO instrument 7/09 AMO Phase 2 installed by 11/09 → No float in schedule for early science in 7/09

John Arthur X-ray June 17, Cornell 2D Detector LDAC Review in May 08 showed good progress Demonstrated a working bump-bonded detector Detailed testing of chip is continuing Go-forward plan is being reviewed Integration with SLAC DAQ system Mechanical packaging will be done at SLAC Coordinated with CXI Received bump bonded chip at SLAC in May 08 Delivery of Final Detector at SLAC in Spring 2009

John Arthur X-ray June 17, Quadrant board Combines 16 ASIC’s 1 FPGA/quadrant Detector Mechanical Design Concept Light shroud (cover removed) Double detector package 4 ASIC’s 2 pixel array detectors Cooling coil Martin Nordby, Matt Swift PPA Mech. Eng.

John Arthur X-ray June 17, LCLS Installation and Commissioning Time-Line LTU/Und/Dump Install LTU/UndComm. Re-commission Inj/BC2 to SL2 First Light in FEE PEP-II run ends FEE/NEH Install PPS Cert. LTU/Dump FEH Install CD-4 (7/31/2010) X-Rays in NEH First Light in FEH NEH Operations/ Commissioning JJFFMMAAMMJJJJAASSDDJJFFMMAAMMJJJJAASSOONNDDJJFFMMAAMMJJJJ ON A A Down PPS A A M M now Linac/BC2 Commissioning FEEComm. April 18, 2008 FEH Hutch BO

John Arthur X-ray June 17, Coordination with LUSI Photon Systems working closely with LUSI Both managed by J. Galayda Close proximity in Bldg 280 Shared engineering/design resources Interface Working Group meets bi-weekly Formal relationship set by Interface Control Documents

John Arthur X-ray June 17, Transition from Project to Facility Responsibility for operation of LCLS instruments and LCLS X-ray science lies with the Experimental Facilities Division (XFD) Head, responsible for User outreach: Jochen Schneider Deputy, responsible for LCLS science:Jerry Hastings Responsible for User operations: John Arthur Group includes Photon Systems and LUSI staff (about 20 today) Growing quickly but thoughtfully (hiring now)

John Arthur X-ray June 17, Beyond the initial LCLS configuration Policy for outside groups which propose to add instrumentation to the LCLS facility Must offer a significant addition of general utility to LCLS Must get support of LCLS (with evaluation by SAC) Then group and LCLS negotiate with funding agencies Then group and LCLS decide final layout and timeline, sign MOU Some access priority can be negotiated, within limits which guarantee plentiful access by general users All new instrumentation reverts to LCLS ownership/management after early operation

John Arthur X-ray June 17, First example of addition to LCLS SXR instrument: Soft X-ray Materials studies Consortium led by Anders Nilsson (SLAC/Stanford) and Wilfried Wurth (CFEL/Univ Hamburg) Institutions: Stanford, Univ Hamburg, LBNL, BESSY Monochromatic soft-X-ray line to complement AMO line No end station in initial configuration (consortium will loan) Fast-track schedule: operation in late 2009 Status: preparing Design Report for LCLS review in July If approved, get MOU by September

John Arthur X-ray June 17, Plan 1, with AMO in Hutch 2 Plan 2, moving AMO to Hutch 1 Where to put SXR?

John Arthur X-ray June 17, Summary XTOD is building instruments at LLNL; XES is in final design phase This is a busy time for both groups The schedule to reach early science in July 2009 is tight, though risks to CD-4 milestones are very small LCLS is transitioning from project to facility SXR instrument is first example of a proposal for additional capability beyond LCLS baseline