1 Arturo Alarcon 1 Undulator Controls Status FAC Undulator Controls Status Arturo Alarcon June 9, 2009.

Slides:



Advertisements
Similar presentations
Yokogawa Network Solutions Presents:
Advertisements

Configuring APACS & AAN Controllers
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
Development of a Linux- based small-size controller using PoE technology T. Masuda, T. Fukui, R. Tanaka SPring-8 ICALEPCS2005, Oct , Geneva, Switzerland.
X-Ray Survey of The ATLAS SCT. The ATLAS Semi-Conductor Tracker.
Ernest Williams FAC November 2008 Control Systems Software Section 1 Controls System Installation Status Ernest Williams for Controls Department.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
Geoff Pile FAC Review - Undulator 12 November 2008 LCLS Undulator System Overview and Fabrication Geoff Pile.
Geoff Pile FAC Review - Undulator 17 June 2008 LCLS Undulator System Status and Schedule Geoff Pile.
Undulator Control Module Facility Advisory Committee Review, October 30th 2007.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
D. Schultz FAC 6/17/08 1 Undulator Travel and Girder Assembly Undulator commissioning Translation limits Interference The plan.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
1 E. Carrone 1 FEE PPS Status FAC FEE PPS Status Enzo Carrone June 8, 2009.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Arturo Alarcon FAC, Undulator June 17, 2008 Undulator Control Module Facility Advisory Committee June 17, 2008 SLAC -
Microprogrammes control the KOMBIS TMM8003. For the reliable operation of its systems and devices there are several programs located in two controllers.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
Pioneering Science and Technology Office of Science U.S. Department of Energy Joseph Xu, apsctl, anl LCLS Motion Control Architecture Motion Drive/Devices.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
DataLogger Operation - 1 DataLogger ® Operation Procedures.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
1 PAC530 | Output Controller. 2 The Output Controller (PAC530) provides the local connection on an RS-485 network between an Access and Alarm Server (PAC500)
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
SPEAR Insertion Device Controls Upgrade Status Arturo Alarcon January, 2014.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM & HLS Status and Schedule Franz Peters, Georg Gassner.
 AUTOMATION  PLC  SCADA  INSTRUMENTATION  DRIVES & MOTORS.
LCLS Undulator Positioning Control System Shifu Xu, Joseph Xu, Josh Stein Control Group, AES/APS, ANL June 15, 2006.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
November 18, 2002Richard Talaga1 Target Hall Instrumentation NuMI Neutrino Beam Devices Instrumentation Review Instrumentation &Communication Overview.
Joshua Stein LCLS Undulator 20 Feb 06 LCLS Undulator Controls ANL LCLS All-Hands Meeting February 20, 2006 Josh Stein Argonne.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
K. Luchini LCLS Controls, July 1, 2005 SLAC Aware IOC EPICS Magnet Functional Requirements Introduction Magnet Functions.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Internet 0 for Industrial Applications Fred Cohn 13-Dec-07.
ATF2 Mover Software 19 June 2008 Janice Nelson, Doug McCormick (SLAC) Glen White (LAL/SLAC) Justin May (no longer at SLAC)
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Chiller control system Lukasz Zwalinski – PH/DT.
Ethernet I/O Set-Up This presentation will step through a typical configuration of the CON-DVT-IOE. Intellect 1.5 is used for the software portion. NEXT.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Mar 18, 2003PFIS CDR1 Control System Summary of Changes Since PDR All the motors, drivers, sensors, switches, etc. have been chosen Built up a mechanism.
The Master Monitor for the Green Bank Telescope’s Active Surface Amy L. Shelton Digital Engineer Green Bank, West Virginia  Initial design and coding.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
FPD SOFTWARE TEST MOTIONS / CONNECTIONS / CONFIGURATION / SOFTWARE / TESTS / CONCLUSION Lionel Peyrichoux 14 March 2001.
Josh Stein 29-Apr-08 Undulator Controls Undulator Controls Status Update Josh Stein LCLS Undulator Controls CAM/TL.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
Adrian Oates Graham Cox Daresbury Laboratory MICE Control System DL Contribution June 09.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
BaBar Transition: Computing/Monitoring
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
LTU/Undulator Installation Status
Control System Summary of Changes Since PDR
Testing and deployment
Undulator Controls Breakout
LCLS Undulator System Production Management
LTU/Undulator Installation Status
LCLS Undulator System Status and Schedule
LCLS Undulator Controls Status
LCLS Control System Personnel Linac & BC2 Controls progress
Presentation transcript:

1 Arturo Alarcon 1 Undulator Controls Status FAC Undulator Controls Status Arturo Alarcon June 9, 2009

2 Arturo Alarcon 2 Undulator Controls Status FAC Undulator Controls Scope 33 segments each containing 5 cam motors, 5 rotary potentiometers 7 10mm linear potentiometers 2 translation stage motors, limit switches, and mm linear potentiometers 12 temperature sensors, RTDs Beam Finder Wire actuation controls 4 emergency stop buttons Controls hardware VME crate containing EPICS IOC and digital/analog/motor- communication cards Undulator Controls Module Interface, UCMI, for power distribution, RTD conditioning, interlocking Undulator Module Power Interface, UMPI, power supplies. Electronics Interface Assembly, EIA, cable junction box. 49 control cables, and 3 network cables AC distribution Controls software, EPICS, displays, data archiver, and alarms

3 Arturo Alarcon 3 Undulator Controls Status FAC Undulator Controls Scope Undulator Segment (Aisle side) T10 T11 T05T04 T06 TM2 TM1 CM5 CM2 CM3 RP5 RP3 RP2 LP2-Y LP3-X LP6-Y LP7-X LP8-TRLP4-TR CMx = CAM Motor TMx = Translation Motor RPx = Rotary Potentiometer LPx = Linear Potentiometer Txx = Temperature RTD T07 T12

4 Arturo Alarcon 4 Undulator Controls Status FAC Undulator Controls Scope Undulator Segment (Wall side) T03 T02 T01 T08 T09 CM1 CM4 RP4 RP1 LP1-Y LP5-Y CMx = CAM Motor TMx = Translation Motor RPx = Rotary Potentiometer LPx = Linear Potentiometer Txx = Temperature RTD

5 Arturo Alarcon 5 Undulator Controls Status FAC Status Installation is complete Checkout is done All motors, RTDs, and potentiometers are functional and calibrated Translation stages have been fiducialized and checked for proper travel; limit switches, hardstops, and skew interlocks are set All BFWs actuate

6 Arturo Alarcon 6 Undulator Controls Status FAC Status Girder motions checkout is complete Selected girders were checked against alignment data to verify proper motions Physicists have also checked using their own software applications Every single girder has had an undulator roll- in test on the Coordinate Measuring Machine, CMM

7 Arturo Alarcon 7 Undulator Controls Status FAC Status Controls software is complete, and checked out All 33 iocs are online All devices are controlled properly All readbacks have been checked All required functions are available Software alarms are active Displays are available All appropriate data is being archived Naming convention fits LCLS standards

8 Arturo Alarcon 8 Undulator Controls Status FAC On-going Improvements Improve motor software driver Automate motor position recovery after a power failure Automate generation of global status displays Physicists requests Documentation Software user manual, help files Hardware documentation and drawings are not complete Update checkout procedures

9 Arturo Alarcon 9 Undulator Controls Status FAC Control Displays

10 Arturo Alarcon 10 Undulator Controls Status FAC Control Displays

11 Arturo Alarcon 11 Undulator Controls Status FAC Control Displays

12 Arturo Alarcon 12 Undulator Controls Status FAC Control Displays

13 Arturo Alarcon 13 Undulator Controls Status FAC Control Displays