D. Schultz FAC 6/17/08 1 Undulator Travel and Girder Assembly Undulator commissioning Translation limits Interference The plan.

Similar presentations


Presentation on theme: "D. Schultz FAC 6/17/08 1 Undulator Travel and Girder Assembly Undulator commissioning Translation limits Interference The plan."— Presentation transcript:

1 D. Schultz FAC ReviewDCS@SLAC.Stanford.edu 6/17/08 1 Undulator Travel and Girder Assembly Undulator commissioning Translation limits Interference The plan David Schultz

2 D. Schultz FAC ReviewDCS@SLAC.Stanford.edu 6/17/08 2 Undulator Commissioning We adopted the plan that initial Undulator beamline commissioning to the electron dump would be done without Undulator magnets on the girders. 1. Commission the line at 30 Hz with minimal risk to the Undulator magnets. 1. Commissioning includes the BLM MPS system. 2. Commissioning includes BBA. 3. Install 2 Undulator magnets per shift when ready.

3 D. Schultz FAC ReviewDCS@SLAC.Stanford.edu 6/17/08 3 Undulator Translation Stops In-position limits: (current plan) 7.0 mm hard stop 6.5 mm emergency shut-off 6.0 mm reversing switch 5.75 mm PV limit (software) (0.0 mm = nominal beam center) ±2.5mm good field region requires >3.75mm clearance

4 D. Schultz FAC ReviewDCS@SLAC.Stanford.edu 6/17/08 4 Undulator Vacuum Interference Estimate ~2 mm clearance, 2.0-1.25 mm usable range.

5 D. Schultz FAC ReviewDCS@SLAC.Stanford.edu 6/17/08 5 Girder Assembly Girder assembly is under way. We need to set the stops on the girders now. Any Undulator is mountable on any girder. Plan: Set all girders’ stops to the values on slide 3 Re-shim all undulators for full travel ~24 Undulators RFI by 3/1/09 33 Undulators RFI by 6/1/09