Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010.

Slides:



Advertisements
Similar presentations
Public Works: Building Sustainable Communities
Advertisements

200 E 400 N to 1250 N Reconstruction 200 E 400 N to 1250 N Phases.
PUBLIC WORKS DEPARTMENT
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
EA204 Environmental Technology Pavement Drainage Stormwater Sewer Design.
The Challenges & Opportunities for Better Neighborhood Flood Protection in New Orleans Jeffrey J. Thomas, JD.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
6 th Street Water Main And Street Reconstruction 2013.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
Steve Varnedoe Condition Assessment & Funding Needs for North Carolina’s Highway System North Carolina Department of Transportation Report to the Joint.
Mississippi DOT Roadsides, Drainage & Vegetation Management Standards.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
DEPARTMENT OF TRANSPORTATION. Mission Statement Plan, Design, Construct, Operate and Maintain the roadway system under the jurisdiction of Lee County.
Engineering and Technical Plans Description, process and standards Dh 2005.
City of Salem Streets and Bridges 539 miles of paved streets 53 bridges 263 signalized intersections 195 school zone flashers 7,100 street lights 125,000.
LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public.
Public Works Roads & Maintenance. Employees Supervisor- Perfecto “Perch” Valdez Assistant- Francisco Ruiz Coordinates: Community Detail Program (La Tuna)-
Nick Johnson, PE Senior Project Manager October 1, 2012.
What does PWD do for our City?. Administrative Services Engineering Operations.
Infrastructure – Condition Assessment Overview & Purpose Infrastructure Condition Assessment – General Findings/Conditions –Streets/Sidewalks/Parking Lots.
Condition Assessment & Funding Needs for North Carolina’s Highway System Report to the Joint Legislative Transportation Oversight Committee December 12,
Municipal Maintenance Activities Presented on April 24, 2006.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Planning and Design in Rockford: West State Street Corridor Overview 315 North Main Street · Rockford IL
1 Department of Public Works and Engineering FY11 Budget Presentation.
Denver Area Transportation Issues and the Future of Transit Development in the Denver Metro Area Sertoma Club January 12, 2012.
TCC Budget Highlights Capital Budget - $190.43M Operating Budget - $384.9M Total Budget – $575.33M.
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
Heavy Construction Association March 20, 2013 Robert Sharon, Director of Community Services Kit Woods, P. Eng., Manager of Environmental Services Allan.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
STA Safety Project PID #76439 December 12, 2006.
Presentation to the Chamber of Commerce Friday, April 23, 2010.
Public Works Department Operation & Maintenance Budget FY Budget Worksession July 15, 2013.
Stormwater Budget Overview Just a Reminder. Infrastructure Inventory for Stormwater Drainage System 19 Major Canal Control Structures 19 Major Canal Control.
PUBLIC INPUT SESSION OCTOBER 27, 2015 City of Asbury Sun Valley Dr. and Sun Ridge Ct. Reconstruction Project.
Stormwater Commitments Categorical Exclusion Training Class.
DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.
Department of Public Works Approval of a Journal Voucher Amending Projects in the FY 2011 Capital Improvement Program Budget and Appropriate $125,000 in.
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: July 10, 2006.
City of New Brighton Department of Public Works City Services Task Force Presentation April 17, 2003.
Town of Oro Valley Oro Valley Stormwater Utility Commission Overview.
September 28, 2015 PUBLIC WORKS 101. sandyspringsga.gov Adopted City Priorities – FY
Steven Peene, PhD Director of Water Resources Applied Technology and Management, Inc. Overview of FDOT’s Statewide Stormwater Management Plan (SSWMP)
ITEM 9B Authorize a Commercial Developer Agreement with Keller Watermere, L.P., for South Village at Watermere, located south of West Southlake Boulevard.
Public Works/Municipal Utilities Department FY City Council Budget Workshop June 15, 2015 Presented By: Glen W. C. Kau, PE Director of Public Works/Municipal.
Public Works. Strategic Plan Presentation Department Organization Strategic Goals relating to Public Works Department Issues.
ORDINANCE # Authorizing $372,760 for traffic signal interconnect at 47 th Street and Emanuel Cleaver II Boulevard Start of project End of project.
Public Works Capital Projects FY Projects Completed FY 2014.
Arturo Cervantes, P.E., Director of Public Works/City Engineer June 7, 2016.
Region’s Core Services 202/17/2014 Integrity ∙ Excellence ∙ Respect Provide leadership, administrative support, procurement and budgetary and financial.
FLORIDA DEPARTMENT OF TRANSPORTATION MAINTENANCE RATING PROGRAM.
City Council Storm Water Presentation March 6, 2014.
STRONG NEIGHBORHOOD INITIATIVE Public Works Department January 30, 2007 Agenda item 8.01.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
Town of Brighton, Department of Public Works
Environmental Services
Manchester’s CSO Program: A Look Behind and a Look Ahead
Infrastructure Investment Needs
DICKINSON AVENUE RECONSTRUCTION
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
SW Gage Blvd - Street Repair Project
Project Scope of Work Project Contacts
Public Works Planning and Design Division
Walker Street Reconstruction Project 25% Design Public Hearing
Department of Public Works OVERVIEW
Regional Stormwater 2016 Operations, Maintenance, & Projects
Presentation transcript:

Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

Overview – Stormwater Drainage System 2,800 miles of Roadside Storm Ditches 3,600 miles of Storm Sewer Line 14 Stormwater Pump Stations 1,900 Outfalls 9 Detention Basins

Overview – City Streets and Bridges 16,000 lane-miles 2,400 lane-miles –Major Thoroughfares 5,600 lane-miles - Collectors 8,000 lane-miles - Local Streets 1,619 Bridges 2,400 Traffic Signals

Storm Drainage Maintenance Major Off-Road Ditch Inspection & Maint. $2,408, miles Herbicide Application $424,395 16,000 Acres

Off-Road Drainage Easement Mowing $388, miles Remove Litter From Drainage Easements $1,200,000 8,500 Cubic Yards Storm Drainage Maintenance

Roadside Ditch Maintenance (De-silt & Re- Grade) $12,584, miles Right-of-Way Mowing $3,498,716 6,784 miles

Storm Drainage Maintenance Storm Water Inspections $1,574,212 1,400 Inspections Outfall Inspections & Representative Monitoring $483, Inspections Inlet/Manhole & Line Inspections $3,218,296 60,000 Inlets / Manholes 240 miles of Line

Storm Drainage Maintenance Inlet/Manhole & Line Cleaning and Repair $8,728,408 21,788 Manholes and Inlets 89 miles of Line Gutter Sweeping $1,507,459 21,500 lane-miles

Street Maintenance Pothole Repair $936,026 2,000 Tons Skin Patching $6,552,185 14,000 Tons

Street Maintenance Concrete Repair $6,347, ,000 Cubic Feet Overlay $9,693, Lane lane-miles

Bridge / Barricade Maintenance $3,044,741 5,350 Total Street Maintenance: Bridges

Maintain Traffic Signs $2,675,114 40,000 Units Maintain Pavement Markings $1,315,276 4,300,000 Linear Feet Maintain Traffic Signals $5,839,346 6,450 Units Maintain Freeway Lighting $1,263,543 15,000 Units Street Maintenance

Maintenance Total O & M FY11 Storm: $33.0 M Street: $48.8 M

Stormwater: Design & Construction Drainage Improvement Projects $50,700,000 1,628 Acres LDP (Local Drainage Program) $2,400, Sites Detention $4,500,000 Subregional Design

Street Construction MT Overlay $7,000, lane-miles MT Reconstruction $79,900, lane-miles MT Construction $14,140, lane-miles

Street Construction: Neighborhood Street Reconstruction Curb & Gutter $15,000, lane-miles

Street Construction: Bridges Wooden Bridge Structure Replaced with Wood or Concrete $1,186,059 8 Structures Total – 4 wood, 4 concrete

Capital Totals CIP FY11 Storm: $57,600,000 Street & Bridge: $87,170,000 (PIB & Metro) Total: $144,770,000

Select FY 11 Capital Projects: Storm Drainage Local Drainage Projects Kirkwood Drive (Briar Forest) Whiteheather, Phase III Astoria Boulevard (Scarsdale) Brays Village Bellaire West

Select FY 11 Capital Projects: Street & Bridge NSR 450 (East End) Morningside Improvements Yale Paving: Tidwell to Parker Sabo Paving: Kingspoint to Fuqua Cambridge Paving: Holly Hall to IH 610 Hirsch: Kelley to Crosstimbers Little York: TC Jester to Alabonson Parker: Hardy to Eastex

Capital Projects CIP FY 11 to 15 Storm: ~$57M per year Street: ~$100M per year

Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010