International Atomic Energy Agency Workshop on Topical Issues on Infrastructure Development: Managing the Development of a National Infrastructure for.

Slides:



Advertisements
Similar presentations
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Advertisements

IAEA RER/9/111: Establishing a Sustainable National Regulatory Infrastructure for Nuclear and Radiation Safety Regional Workshop on Drafting Regulations.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
Hanoi, 22-23/5/2007 INTRODUCTION ON THE BIODIVERSITY LAW Presented by: Huynh Thi Mai Department of Environment - MONRE MINISTRY OF NATURAL RESOURCES AND.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Regulatory Body MODIFIED Day 8 – Lecture 3.
Role of Independent Regulatory Body for Safe Operation of NPPs Zia Hussain Shah Director, Centre for Nuclear Safety Pakistan Nuclear Regulatory Authority.
Nuclear program of Lithuania Dr. Vidas Paulikas, Radiation Protection Department VATESI Visaginas, 29 June 2009.
IAEA International Atomic Energy Agency Human Resources Development for Nuclear Safety J. Bastos NSNI/RAS.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
Governmental, Legal and Regulatory Framework in Azerbaijan Republic Aysel Hasanova, Akbar Guliyev, Emin Mansurov Regional Workshop - School for Drafting.
Thailand NUCLEAR POWER PROGRAM INFRASTRUCTURE AND STATUS OF IMPLEMENTATION: Regulatory Body Prof. Dr. Chaivat TOSKULKAO Secretary General Office of Atoms.
1 9/15/2015 Gogita Todradze National Statistics Office of Georgia Institutional Arrangements for Energy Statistics in Georgia.
Gustavo Caruso Section Head Regulatory Activities Section
IAEA International Atomic Energy Agency Overview of legal framework Regional Workshop - School for Drafting Regulations 3-14 November 2014 Abdelmadjid.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Kazakhstan.
MONRE UNEP-RISO NATIONAL WORKSHOP ON CAPACITY DEVELOPMENT FOR CDM Hanoi, 27-28/11/2002 Proposal for establishing National Authority on CDM in Vietnam Dr.
LEGAL FRAMEWORK & REGULATORY SYSTEM f or introduction of NPP into Vietnam Le Chi Dung (VARANS, Vietnam) Vienna, December 2008.
NUCLEAR POWER PLANT FINANCING IAEA - Infrastructure Technical Meeting Vienna, November 2007 Fanny Bazile Forecast Director Nuclear Energy Division.
19-20 March 2009 IAEA, Vienna RER/9/096 Regional Planning Meeting "Strengthening National Infrastructures for the Control of Radiation Sources" (TSA-1),
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
IAEA International Atomic Energy Agency Nuclear Energy Programme Implementing Organization (NEPIO) Anne Starz Nuclear Power Engineering.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Republic of Moldova.
GROUP 3:Bangladesh, Croatia, Egypt, Jordan, Montenegro, Namibia, Senegal, Syria, Vietnam and Yemen Moderator: Dr. I. Rotaru, IAEA consultant Reporter:
Human Resources Development for Sudan Nuclear Power Programme Presented by Prof. F.I.Habbani Technical Committee For Sudan NPP Ministry of Energy and Mining.
Ministry of Economy, Trade and Industry Experience and Future Activities for Introduction of Nuclear Power Masaomi KOYAMA Deputy Director Nuclear Energy.
JRC Information Day – May 11, 2006, Bucharest 1 Valică GOREA President of Nuclear Agency GOVERNMENT of ROMANIA Romanian Nuclear Programme Medium and Long.
1 THE INTRODUCTION OF THE FIRST NPP IN TUNISIA PROJECT STATUS Jomaâ Souissi Souad Baccouche Société Tunisienne d’Electricité et du Gaz Centre National.
VIETNAM STATISTICAL DEVELOPMET STRATEGY , VISION TO 2030 (VSDS) Presented by: Nguyen Van Doan Director, Institute of Statistical Science GSO December,
Human Resources Development TM/WS Infrastructure Development 9-12 February 2010 Breakout session – Group 1 Moderator: Mr. Biro Lucian (Romania) Reproter:
TM/WS 9-12 February GROUP 3: Bangladesh, Croatia, Egypt, Jordan, Montenegro, Namibia, Senegal, Syria, Vietnam and Yemen Moderator: Dr. I. Rotaru,
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
IAEA International Atomic Energy Agency Summary and Overview of TECDOC Russel Edge Decommissioning and Remediation Unit Division of Radiation,Transport.
Thailand’s Preparation for Starting a Nuclear Power Program Mr. Pricha Karasuddhi Technical Advisor Nuclear Power Program Development Office(NPPDO) Ministry.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
Maria J Moracho Ramirez Regulatory Activities Section
Technical Meeting on Milestones for nuclear power infrastructure development Radiation Protection Khammar Mrabit Head, Regulatory Infrastructure and Transport.
Algerian nuclear power programme Status, needs and perspectives T/M on development of nuclear infrastructure of NP programme February, ,Vienna.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
IAEA International Atomic Energy Agency RER2006 RTC Establishing a Nuclear Safety Infrastructure for a National Nuclear Power Programme Wrap up, Where.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Kyrgyz Republic.
International Atomic Energy Agency Irina Sanda Education and Training in the Area of Safety Assessment Irina Sanda Safety Assessment Section Division of.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
23 January 2016 Gustavo C ARUSO Head, Regulatory Activities Section Division of Nuclear Installations Safety Department of Nuclear Safety and Security.
INDONESIA NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAMME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION Dr. A. Sarwiyana Sastratenaya Director, Center for.
Current Status of the National Nuclear Infrastructure and Human Resources Development in the Republic of Belarus TM/WS on Topical Issues on Infrastructure.
CAPACITY BUILDING AND E-LEARNING IN VIETNAM Le Dai Dien Nuclear Training Center – Vietnam Atomic Energy Institute Technical Meeting on the Use of the Global.
JORDAN ATOMIC ENERGY COMMISSION (JAEC) Building of National Safeguards Capabilities in Jordan IAEA’s Technical Meeting/Workshop on National Infrastructure.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
Practice of HOF regulatory oversight E.G. Kudryavtsev Department of Safety Regulation of Nuclear Fuel Cycle Facilities, Marine Nuclear Power Installations.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
The Egyptian Nuclear & Radiological Regulatory Authority (ENRRA)
IAEA International Atomic Energy Agency IAEA Safety Standards and Public Exposure to Radon Trevor Boal Radiation Protection Unit - NSRW.
International Atomic Energy Agency Workshop on Topical Issues on Infrastructure Development: Managing the Development of a National Infrastructure for.
BCĐT-ĐHN-NT1 Institute of energy NUCLEAR POWER DEVELOPMENT PLAN IN VIETNAM OVERVIEW, PROSPECTS AND CONCERNS 12/2009.
Egyptian Nuclear and Radiological Regulatory Authority (ENRRA)
Dr. Khammar Mrabit DG, AMSSNuR Vienna, 09 December, 2016
Governmental, Legal and Regulatory Framework in Azerbaijan Republic
Nuclear and Treaty Law Section Office of Legal Affairs
SESSION 3 Policy Framework
Radiation & Nuclear Safety and Security Aspects in Lao PDR
Nuclear and Treaty Law Section Office of Legal Affairs
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
Communication and Consultation with Interested Parties by the RB
RCF Plenary Session 21 September 2018
CAPACITY BUILDING AND E-LEARNING IN VIETNAM
Legal and Regulatory Framework for Nuclear Installations in IRAN
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
Regulatory system in Hungary
Presentation transcript:

International Atomic Energy Agency Workshop on Topical Issues on Infrastructure Development: Managing the Development of a National Infrastructure for Nuclear Power Vienna, Feb

Le Thi Kim Dung Deputy Director, Division of Licensing Vietnam Agency for Radiation and Nuclear Safety (VARANS) An Overview on Building up National Infrastructure on the Way to Introduce Nuclear Power into Vietnam 2

Table of Contents I. Necessity of Nuclear Power for Vietnam II. Guiding Viewpoints in the Development of Atomic Energy Applications in Vietnam III.Establishment of Nuclear Infrastructure in Vietnam IV.Some Comments and Lessons Learned 3

4 Map of Vietnam Capital: Hanoi Area: 331,690 km 2 Population:86 mil. (2009) Coastal line: 3,260 km GDP $

Based on national strategy on industrialization, modernization and socio-economic development of the country: 1.All scenarios on energy demand have been studied intensively, comprehensively and systematically, then discussed and debated from working to policy-maker levels since 1990’s; I. Necessity of Nuclear Power for Vietnam 5

2. According to research results, the electricity demand under the base scenario (with GDP growth rate of 7.1%-7.2%/year for the period) will be 201 billion kWh by 2020 and 327 billion kWh by I. Necessity of Nuclear Power for Vietnam 6

3. Meanwhile, domestic conventional energy sources (hydro, coal, oil & gas, renewable) can supply only 165 billion kWh by 2020 and 208 billion kWh by In other words, according to the base scenario, our country will run short of 36 billion kWh by 2020 and nearly 119 billion kWh by The increasing shortage of electricity supply will continue in the subsequent periods. I. Necessity of Nuclear Power for Vietnam 7

4. To settle the demand-supply balance, the following options have continued to be studied to compare and consider, namely: Import electricity from the neighboring countries; Import coal, oil & gas for electricity production; and Introduce nuclear power. I. Necessity of Nuclear Power for Vietnam 8

5. Research results have also pointed out nuclear power is more advantageous than the other options in terms of economics, environment, energy security, and optimal mix. I. Necessity of Nuclear Power for Vietnam 9

As a result, after a long process of comprehensive and systematic study and intensive discussion, a well-informed decision has been officially made, that is: Nuclear power should be introduced in the country. I. Necessity of Nuclear Power for Vietnam 10

The decision to introduce nuclear power into Vietnam was officially stated clearly and openly in 02 following important documents: 1. Strategy for Peaceful Use of Atomic Energy up to 2020 (Jan. 2006, by Prime Minister), in which nuclear power is a main component in the Strategy); and 2. Strategy for Energy Development up to 2020, with a vision to 2050 (Dec. 2007, by Prime Minister); I. Necessity of Nuclear Power for Vietnam 11

Guiding and Consistent Viewpoints in the National Policy and Strategy for the Development of Atomic Energy Applications in Vietnam are: 1.Vietnam uses atomic energy for peaceful purposes exclusively; II. Guiding Viewpoints in the Development of Atomic Energy Applications in Vietnam 12

2. All applications should be ensured safely and securely at the highest level for the protection of people and the environment; 3. All applications should be conducted in an effective and efficient manner practically in service of sustainably socio-economic development. II. Guiding Viewpoints in the Development of Atomic Energy Applications in Vietnam 13

In order to stepwise realize the above-mentioned viewpoints, Vietnam has been trying its best to conduct the followings: 1. Studying and establishing a comprehensive legal and institutional infrastructure for atomic energy applications in conformity with international conventions/treaties and IAEA safety standards; II. Guiding Viewpoints in the Development of Atomic Energy Applications in Vietnam 14

2. Strengthening and encouraging investment in the development of nuclear technical infrastructure; 3. Promoting the training and development of nuclear human resources to step by step meet the requirements for the development of atomic energy applications, and II. Guiding Viewpoints in the Development of Atomic Energy Applications in Vietnam 15

4. Strengthening international cooperation both multilateral and bilateral, especially with IAEA and countries having advanced nuclear industries. II. Guiding Viewpoints in the Development of Atomic Energy Applications in Vietnam 16

In Vietnam, the hierarchy of legislative system consists of the following four levels: 1. Laws and Codes are promulgated by the National Assembly (NA); 2. Ordinances are promulgated by the NA Standing Committee; III. Establishment of Nuclear Infrastructure 17

3. Government Decrees are promulgated by the Government; 4. Prime Minister’s Decisions are promulgated by Prime Minister; and 5. Ministerial Circulars are issued by Minister/Ministers III. Establishment of Nuclear Infrastructure 18

In Vietnam, nuclear infrastructure development is approached and grouped into the following 03 sub- groups: 1. Legal and regulatory infrastructure development; 2. Technical infrastructure development; and 3. Human resource development. III. Establishment of Nuclear Infrastructure 19

According to well-specified functions, duties, powers and organization of each ministry, the Government or Prime Minister assigns each ministry to take the main responsibility for each specific duty in collaboration with related ministries, in particular: III. Establishment of Nuclear Infrastructure 20

1. Strategy for Peaceful Use of Atomic Energy up to 2020 (Jan. 2006, by Prime Minister); The Ministry of Science and Technology takes the main responsibility in collaboration with related ministries for formulation; III. Establishment of Nuclear Infrastructure 21

2. Master Plan (Comprehensive Plan) to implement the Strategy for Peaceful Use of Atomic Energy up to 2020 July. 2007, by Prime Minister); The Ministry of Science and Technology takes the main responsibility in collaboration with related ministries for formulation. III. Establishment of Nuclear Infrastructure 22

3. Strategy for Energy Development up to 2020, with a vision to 2050 (Dec. 2007, by Prime Minister); The Ministry of Industry and Trade takes the main responsibility in collaboration with related ministries for formulation. III. Establishment of Nuclear Infrastructure 23

4. Atomic Energy Law, Jun by the National Assembly, and into force since Jan The Ministry of Science and Technology takes the main responsibility in collaboration with related ministries for formulation. III. Establishment of Nuclear Infrastructure 24

The Law regulates comprehensively peaceful, safe and secure use of atomic energy in Vietnam, including the participation and implementation of international nuclear-related conventions/treaties and strengthening international cooperation. III. Establishment of Nuclear Infrastructure 25

5. Government Decree on Administrative Punishment in the Field of Atomic Energy (Dec. 2009, by the Government). 6. Government Decree Guiding the Implementation of Some Articles in the Atomic Energy Law (25 Jan. 2010). The Ministry of Science and Technology takes the main responsibility in collaboration with related ministries for formulation. III. Establishment of Nuclear Infrastructure 26

One (01) more Government Decree has been completely formulated and will be soon issued in 2010, namely: Government Decree on Nuclear Power Plant. The Ministry of Industry and Trade takes the main responsibility in collaboration with related ministries for formulation. III. Establishment of Nuclear Infrastructure 27

In addition, a comprehensive plan with a concrete road map for the study, formulation and issuance of Ministerial Circulars, National Technical Regulations and Technical Standards related to nuclear safety is actively under construction to submit to competent bodies for approval. The Ministry of Science and Technology takes the main responsibility in collaboration with related ministries for the formulation of almost all these documents III. Establishment of Nuclear Infrastructure 28

IAEA Safety Standards are the main reference documents in the study and formulation of Ministerial Circulars, National Technical Regulations and Technical Standards related to nuclear safety in Vietnam. III. Establishment of Nuclear Infrastructure 29

According to Master Plan (Comprehensive Plan) to implement the Strategy for Peaceful Use of Atomic Energy up to 2020 July. 2007, by Prime Minister), there are 23 projects should be formulated and approved in 2010 for implementation among which some projects are directly related to nuclear infrastructure development, namely: III. Establishment of Nuclear Infrastructure 30

Project No. 6: Long-term planning for nuclear power plants (NPP) development and building first NPP Ministry of Industry and Trade takes the main responsibility in collaboration with Ministry of Science and Technology and related ministries/lines. III. Establishment of Nuclear Infrastructure 31

Project No. 7: Planning human resource training and development for nuclear power progamme Ministry of Education and Training takes the main responsibility in collaboration with Ministry of Industry and Trade, Ministry of Science and Technology and related ministries/lines. III. Establishment of Nuclear Infrastructure 32

Project No. 8: Planning research and development of nuclear power technology (to build capacity for technology selection, as well as innovation of nuclear-related technologies in the long term) Ministry of Science and Technology takes the main responsibility in collaboration with Ministry of Industry and Trade and related ministries/lines. III. Establishment of Nuclear Infrastructure 33

Project No. 9: Strengthening technical capacity in service of nuclear power programme (to build technical capacity in safety analysis, assessment, appraisal for NPP, inspection in the process of construction, operation and maintenance for NNPP). Ministry of Science and Technology takes the main responsibility in collaboration with related ministries/lines. III. Establishment of Nuclear Infrastructure 34

Project No. 10: Planning sites for building NPPs and national radwaste repository Ministry of Natural Resources and Environment takes the main responsibility in collaboration with related ministries/lines. III. Establishment of Nuclear Infrastructure 35

Project No. 11: Planning investment for big construction corporations to strengthen their capacity in installation and training managers and skilled technicians/workers Ministry of Construction takes the main responsibility in collaboration with related ministries/lines. III. Establishment of Nuclear Infrastructure 36

Project No. 12: Planning emergency response and preparedness in case of nuclear and radiological incident/accident Ministry of National Defense takes the main responsibility in collaboration with related ministries/lines. III. Establishment of Nuclear Infrastructure 37

Project No. 13: Planning and establishing measures to ensure security in the field of atomic energy Ministry of Public Security takes the main responsibility in collaboration with related ministries/lines. III. Establishment of Nuclear Infrastructure 38

Project No. 14: Planning to participate in nuclear- related international conventions, treaties, agreements to ensure favourable international legal basis for nuclear power development Ministry of Science and Technology takes the main responsibility in collaboration with related ministries/lines. III. Establishment of Nuclear Infrastructure 39

Project No. 15: Survey, exploration and estimation of uranium resource reserves Ministry of Natural Resources and Environment takes the main responsibility in collaboration with related ministries/lines. III. Establishment of Nuclear Infrastructure 40

Project No. 20: Strengthening national capacity to ensure nuclear safety Ministry of Science and Technology takes the main responsibility in collaboration with related ministries/lines. III. Establishment of Nuclear Infrastructure 41

Project No. 23: Strengthening regulatory body on nuclear and radiation safety Ministry of Science and Technology takes the main responsibility in collaboration with related ministries/lines. III. Establishment of Nuclear Infrastructure 42

1. Vietnam has studied carefully and been following closely all the recommendations in IAEA publications “Considerations to Launch a Nuclear Power Programme (GOV/INF/2007) and “Milestones in the Development of a National Infrastructure for Nuclear Power” (No. NG-G- 3.1), at the same time, actively learned experiences of other countries through bilateral cooperation; IV. Some Comments and Lessons Learned 43

2. All aspects related to nuclear power introduction have been and being carefully considered, such as legal and technical infrastructure, human resources training and development, national electrical grid, technology selection, site selection, financial arrangement, environmental impact assessment, public acceptance, international environment, etc.), to ensure NPP will be built according schedule and put into operation in the safest, most secure and economic manner; IV. Some Comments and Lessons Learned 44

3. However, as presented above, in the organization and implementation of specific duties, Vietnam does its own way, for example Vietnam does not establish a separate Nuclear Energy Programme Implementing Organization (NEPIO). Each ministry according to its state management functions is assigned to take the main responsibility for each specific duty in collaboration with related ministries/lines; IV. Some Comments and Lessons Learned 45

4. According to our self-assessment, it can be said that Vietnam is standing somewhere in Phase 2 between Milestone 1 and Milestone 2. IV. Some Comments and Lessons Learned 46

5. Vietnam highly appreciates IAEA INIR methodology and misssion to the country. It is very important and useful for us. It is strongly requested more IAEA INIR missions should be conducted. It is also expected that comments/recommendations should be deeper, more specific and franker, not too much diplomatic, that is best way the IAEA can help us. IV. Some comments and lessons learned 47

6. It is very clear that nuclear power is not a single and pure economic issue, but a very complex and interdisciplinary issue - political, economic, social and environment, so in order to be able to successfully introduce nuclear power, some key factors would be:  Political will should be strong, consistent and transparent; IV. Some comments and lessons learned 48

 Government’s leadership and direction should be strong, concerted and drastic in the organization, implementation, supervision, inspection and assessment of related duties; IV. Some comments and lessons learned 49

 High public acceptance should be gained; and  Good international cooperation should be established and strengthened. IV. Some comments and lessons learned 50

Thank you very much for your kind attention! 51