CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG.

Slides:



Advertisements
Similar presentations
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
Advertisements

CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
2009 Wyoming Street and Utility Improvements Neighborhood Informational Meeting December 18, :00 P.M. – 8:00 P.M. 6:00 P.M. – 8:00 P.M. Mark A. Erichson,
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
6 th Street Water Main And Street Reconstruction 2013.
City of Bloomfield Hills 2015 Road Improvement Program.
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
S.R. 1 Intersection Improvement Project Wells County Public Library, Bluffton, IN 6:00 p.m. Presentation Thursday, April 24, 2014.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Learning Outcomes Identify safety issues unique to local and rural areas. Identify common challenges to improving road safety. Explain why road agencies.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
State Road 5 over Eel River Bridge Rehabilitation DES# South Whitley Community Public Library Thursday, February 5, :30 p.m. Please silence.
Quality Avenue “Safe Streets” Improvements City of Lakeland, Minnesota Paul Pinkston Hamline University August 18, 2015.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
STA Safety Project PID #76439 December 12, 2006.
City of Madison Engineering Division Joylynne Drive and Douglas Trail Assessment District-2010 Pflaum Road to Tompkins Drive Joylynne Drive to Herro Lane.
I-495 NORTHERN SECTION SHOULDER USE PROJECT State Project No , P101, C501 CITIZEN’S INFORMATION MEETING UPC NOVEMBER 19, 2013.
PUBLIC INPUT SESSION OCTOBER 27, 2015 City of Asbury Sun Valley Dr. and Sun Ridge Ct. Reconstruction Project.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
PUBLIC INPUT SESSION NOVEMBER 10, 2015 City of Asbury Birchwood Drive Reconstruction Project.
Engineering Study Griffin View Drive & Harbor Hills Blvd. Prepared for Lake County Public Works Engineering 437 Ardice Avenue Eustis, Florida Purchase.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
City of Belmont Pavement Reconstruction Project October 15, 2014.
Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.
Maintenance and Temporary Traffic Control
S.R. A1A SIDEWALK PROJECT SR A1A Sidewalk FPID Pre-Design Public Information Meeting July 13, 2011 Presented By: Derek Dixon, FDOT.
CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS – SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
Welcome Open House Public Information Session Reconstruction Project Brunswick Avenue (Guelph Street to Blucher Street) Guelph Street (Ellis Avenue to.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
MD 30 (Hanover Pike) at Mt. Gilead Road
2016 Mill and Overlay Project
2nd Street Drainage and Paving Improvements
The I-465 West Leg Reconstruction Project
Street Improvement Plan
City of Bloomfield Hills
IA 122 RECONSTRUCTION PRE-BID MEETING
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
SE 12th Street Roadway Improvements February 8, 2005.
PROJ. 566(17) LOR PID MAJOR WIDENING
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
S.R. 26 Road Rehabilitation in Clinton County
Meadow Lane – Brandon Road Improvements Welcome!
Walker Street Reconstruction Project 25% Design Public Hearing
Robincrest/Elmgate/ Linneman Improvements Welcome!
Presentation transcript:

CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG OPEN HOUSE Thursday, November 20, 2014 Please sign in on the sheet provided. Feel free to walk around and view the display material. Project representatives are available to answer any questions. A brief project presentation will begin at 7:30 pm followed by a question and answer period.

PROJECT BACKGROUND In 2015, the City of Vaughan is proposing the replacement of watermain in the Kleinburg area: The existing 150mm diameter metallic watermain on Napier Street, John Street and Kellam Street and the existing 200mm diameter metallic watermain on Stegman’s Mill Road are aged, substandard and in need of replacement. As a result of their age, the existing metallic watermains are susceptible to cracks and corrosion which may lead to watermain breaks and service interruption. www.climatetechwiki.org

PROJECT BACKGROUND The project will also include roadworks: The City’s Pavement Management Program has identified Napier Street, John Street and Kellam Street as requiring reconstruction. These road sections are deficient as a result of poor road surface conditions including cracks, potholes, areas of settlement and drainage issues. Stegman’s Mill Road requires rehabilitation with pavement modifications and traffic calming measures around the curved sections. Existing street lighting along Stegman’s Mill Road is substandard. Street lighting will be upgraded to address lighting deficiencies and improve visibility and safety.

PROJECT DESCRIPTION Proposed Watermain Replacement The proposed watermain replacement will include: New 150mm diameter PVC watermain on Napier Street, John Street and Kellam Street. New 200mm diameter PVC watermain on Stegman’s Mill Road from Islington Avenue to Valley Road. New 300mm diameter PVC watermain on Stegman’s Mill Road from Windrush Road to Ravendale Gate. New 25mm (1”) water services to streetline including new curb stops.

LOCATION PLAN Proposed Watermain Replacement

COMMON QUESTIONS AND CONCERNS Proposed Watermain Replacement Will there be any interruptions to my water during construction? Some water interruptions may occur during construction of the new watermain. Residents will be given 24-48 hours notice prior to the interruption. Will temporary water be required? Temporary water may be required during the construction of the new watermain. How will the installation of the new water service to streetline affect my landscaping? All disturbed boulevard areas will be restored in kind. Every effort will be made to restore to original conditions.

COMMON QUESTIONS AND CONCERNS Proposed Watermain Replacement Will I have access to my driveway and property throughout construction? Driveway and property access will be maintained with the exception of minor interruptions. Residents will be given 24-48 hours notice prior to the interruption. How long will construction take? Construction start is anticipated in spring 2015 pending budget approval with completion anticipated by early fall.

PROJECT DESCRIPTION Proposed Roadworks – Napier St. , John St PROJECT DESCRIPTION Proposed Roadworks – Napier St. , John St. & Kellam St. The proposed roadworks on Napier Street, John Street and Kellam Street will include: Full depth road reconstruction based on Geotechnical recommendations. Removal of existing asphalt Excavation of road granular material to subgrade New granular road base New roadway asphalt Restoration of all asphalt, interlock, concrete and gravel driveways, private walkways and boulevard areas within the limits of construction disturbance.

LOCATION PLAN Proposed Roadworks – Napier St. , John St. & Kellam St.

COMMON QUESTIONS AND CONCERNS Proposed Roadworks – Napier St. , John St. & Kellam St. Will I have access to my driveway and property throughout construction? Driveway and property access will be maintained with the exception of minor interruptions. Residents will be given 24-48 hours notice prior to the interruption. Will there be any road closures? Existing roads may be reduced to one lane or full road closure during construction. Acceptable signage and detours will be posted in advance of any closures. How long will construction take? Construction start is anticipated in spring 2015 pending budget approval with completion anticipated by early fall.

COMMON QUESTIONS AND CONCERNS Proposed Roadworks – Napier St. , John St. & Kellam St. How will the roadworks affect my property and landscaping? All disturbed boulevard areas will be restored in kind. Every effort will be made to restore to original conditions.

PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St. & Kellam St. As part of the design process, three cross-section alternatives were considered for the reconstruction of Napier Street, John Street and Kellam Street. Option 1 – Modified Rural Cross-Section Reconstruction to a modified rural cross-section with minor drainage improvements, including shallow swales and additional boulevard catchbasins.

PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St. & Kellam St. Option 1 Typical Cross-Section for Napier Street, John Street and Kellam Street

PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St. & Kellam St.

PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St. & Kellam St.

PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St. & Kellam St.

PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St. & Kellam St. Option 1 – Modified Rural Cross-Section Advantages Minimize limits of driveway and boulevard restoration. Disadvantages Higher construction costs compared to Option 3 Approximately $960 per metre of roadworks. Increased maintenance costs. Only minor improvements to existing surface drainage is achieved. Shorter life span of road due to lack of drainage. No clear definition of roadway versus boulevard. Edge of asphalt limits will deteriorate over time. Snow removal and road maintenance may damage adjacent boulevard areas. Potential standing water due to existing grade conditions.

PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St. & Kellam St. Option 2 – Full Rural Cross-Section Reconstruction to a rural cross-section with ditches and driveway culverts.

PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St. & Kellam St. Option 2 Typical Cross-Section for Napier Street, John Street and Kellam Street

PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St. & Kellam St.

PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St. & Kellam St. Option 2 – Full Rural Cross-Section Advantages Improved surface drainage and conveyance through ditches. Disadvantages Higher construction costs as a result of ditch and driveway culvert excavations. Approximately $1,100 per metre of roadworks. Increased maintenance costs. Increased construction schedule. Increased disruption of driveways and boulevards. Likely encroachment onto private property to facilitate construction of ditches. Potential standing water in ditches. Likely utility conflicts and relocations. Possible tree/shrub removal and greater impact on landscaping.

PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St. & Kellam St. Option 3 – Modified Semi-Urban Cross-Section Reconstruction to a modified semi-urban cross-section, including semi-mountable curb and narrow gutter with additional catchbasins for improved drainage.

PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St. & Kellam St. Option 3 Typical Cross-Section for Napier Street, John Street and Kellam Street

PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St. & Kellam St.

PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St. & Kellam St.

PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St. & Kellam St.

PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St. & Kellam St. Option 3 – Modified Semi-Urban Cross-Section Advantages Semi-mountable curb with narrow gutter offers a unique approach to an urban section. Lowest construction cost of all three options. Approximately $870 per metre of roadworks. Clear definition of roadway versus boulevard. Lower maintenance costs. Improved drainage for road base and surface runoff. Maximize life span of road. Minimize limits of driveway and boulevard restoration. No standing water. Disadvantages Potentially changes the character of the area.

PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St PROPOSED DESIGN ALTERNATIVES Proposed Roadworks – Napier St. , John St. & Kellam St. Recommended Design Option 3 Reconstruction to a modified semi-urban cross-section including, semi-mountable curb and narrow gutter with additional catchbasins for improved drainage. The recommended approach – Option 3 – is shown on the display plans around the room. The anticipated limits of disturbance have been identified for both driveways and boulevard areas. Single plans for Options 1 and 2 are also displayed for illustration purposes.

PROJECT DESCRIPTION Proposed Roadworks – Stegman’s Mill Road The proposed roadworks on Stegman’s Mill Road will include: Road rehabilitation from Islington Avenue to the end of the curb west of Windrush Road. Full depth asphalt removal and replacement Partial depth asphalt removal and replacement across the bridge deck. Pavement modifications and traffic calming measures from east of Ravendale Gate to west of Teston Road. Centreline rumble strip White edge line pavement markings Chevron road signage through the curves

PROJECT DESCRIPTION Proposed Roadworks – Stegman’s Mill Road Street lighting upgraded to comply with City Standards from Islington Avenue to Ravendale Gate. New lighting proposed on the south and east side of Stegman’s Mill Road. Existing hydro poles used where possible with new luminaires. Addition of some new poles with luminaires. LED luminaires will be considered.

LOCATION PLAN Proposed Roadworks – Stegman’s Mill Road

Stegman’s Mill Road - Photo Rendering Traffic Calming Measures PROJECT DESCRIPTION Proposed Roadworks – Stegman’s Mill Road Stegman’s Mill Road - Photo Rendering Traffic Calming Measures

PROJECT DESCRIPTION Proposed Roadworks – Stegman’s Mill Road

PROJECT DESCRIPTION Proposed Roadworks – Stegman’s Mill Road

Questions or Comments? QUESTIONS OR COMMENTS? Project Contact Information: Mr. Pat Marcantonio, C.E.T. Project Manager City of Vaughan, Engineering Services 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 E-mail: pat.marcantonio@vaughan.ca Mr. Terry Hoehn, C.E.T. Ainley Group 550 Welham Road Barrie, ON L4N 8Z7 E-mail: hoehn@ainleygroup.com