SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion.

Slides:



Advertisements
Similar presentations
February 5 & 6, Spring Gas-Lift Workshop ASME/API Gas-Lift Workshop API RP 11V5 Continuing the Review of Recommended Practices for Operation,
Advertisements

ISO ESP Systems Task Group Leader, Shauna Noonan
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Unloading Water from Oil Wells Using Air.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
1 API Subcommittee 6 Plenary Meeting Resource Group on Materials Tim Haeberle Chairman – API SC6 Resource Group for Materials 6 February 2014.
OGP STANDARDS COMMITTEE MEETING Berlin, Germany Presentation of TC 23: current events and the agenda of the coming years V.V.Vernikovsky, executive.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
1 David Miller, PE, F.ASCE Director, Standards API ECS Reorganization Update.
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
20/5/20021 CEN/TC 12 and ISO TC67 SC4 Plenary meeting CEN/TC 12 and ISO TC67 SC4 Plenary meeting.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
API 17P TASK GROUP January 15, BACKGROUND NWI Initiated in 2006 NWI Initiated in 2006 API 17 P / ISO new recommended practice API 17 P.
SC18 TG5 Development of a Guidance Document for the implementation of API Specification Q2 Objective Create a guidance document for users of the API Specification.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC-18 Liaison Report TG-3: Definition of.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion.
API 11V Task Group 15 November, 2007 Houston, USA.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
1 Design Materials QC Validation HPHT Approach Why Needed? HPHT & Critical Applications – Defined by CFR for Surface Equipment as:  SITP at Wellhead of.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Report to Main C63 Committee Stephen R Whitesell Chair, SC5 November 12, 2015.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience Product Lifecycle Management.
January 26, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth,
API Task Group on GAS LIFT Equipment Chair - Jim Bennett ExxonMobil.
Liaison Update IEEE Computer Society Category A Liaison to JTC 1/SC 7 James W. Moore, CSDP The MITRE Corporation The opinions contained.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
Cost Effective Offset Well Frac-hit Protection Solution
API 19 CI Chemical Injection Devices for Downhole Applications
API 19 CI Chemical Injection Devices for Downhole Applications
TG Chair: Darren Bane (BHI)
Oil-Field Hydraulics Chapter 2 Production Equipment
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
Task Group API 19SS Sand Screens
API SC19 HPHT Template (Proposed as SC19TR1)
Task Group G Report January 17, 2003
Task Group Status January ,11, 2017
CEN/TC 12 and ISO TC67 SC4 Plenary meeting
TG Chair: Mark Brinsden Shell
Updates from SC18 Summer Meeting
Scope / History Well 25/11-G-18 was drilled nov The well has 7” Bakerweld 140 Screens and swell packers. The well is producing gas from the “heal”
API 14L Specification for Lock Mandrels and Landing Nipples
Task Group API 19SS Sand Screens
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
doc.: IEEE /479r0 Mika Kasslin TGh chair
ISO Gas-Lift Work Task Session Fall 2003 Gas-Lift Workshop
API RP 17A - Discussion Points
ISO Task Group Update Wayne Mabry.
Flow Network Construction
Status Update on API 16Q / 16R / 16F
2016 Exploration & Production Standards Conference Subcommittee 10
CHAIR - JIM BENNETT EXXONMOBIL
WG Technical Editor’s Report
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
WG Technical Editor’s Report
Gas Lift Workshop – 2003 ISO Update
API SC 10 WG15 Stage Cementing Collars
WG Technical Editor’s Report
API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
CHAIR - JIM BENNETT EXXONMOBIL
API SC6 Valves and Wellhead Equipment
Jim Raney, Director Engineering & Technology
Presentation transcript:

SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion Accessories, Liner Hangers, Test tools, chemical injection systems. 26 standards in revision or newly created, 4 published and one SR3 to submit Completion Equipment Documents – 14A – SCSSVs - recently published 14B – SSSV installation – ballot complete in resolution – publish Q2 2015 14L – SR3 submitted for next revision – HPHT requirements + updating 11D1 – Packers and Bridge Plugs – projected to publish in Q1 2015 19A – Completion Accessories – adopt-back of ISO 14998 – initial ballot in Q2 2015 19S – Sand Screens – adopt-back of ISO 17824 – initial ballot in Q3 2015 19L – Liner Hangers – in process – potential publication in 2016 19 TT1 – Downhole Well Test Tools – 95% complete – ballot in Q1 2015 19 OH – Openhole Isolation Equipment – New- two mtgs 19 CI – Chemical Injection Valves – New- three mtgs

SC19 report to SC18 January 2015 Gas Lift Equipment Documents – Gas-Lift Handbook – replaces 7+ RPs – plan to publish in Mid 2016 19 G1 – Side-pocket mandrels – SR3 was approved, TG assessing scope 19 G2 – Flow control devices – Ballot underway, 19 G3 – Run/pull/KOT/latches for SPM flow controllers, published 19 G4 – Practices used with SPM equipment, published 19 G5 – Operations Maintenance of GL - SR3 was approved, work progressing 19 G6 – Design of installations using IPO valves – 97% complete – initial ballot Q3 2014 19 G10 - Design and Operation of Intermittent Gas-lift – Review 90% complete, ballot by Q2 2015 19G11 – Dynamic Simulation of Gas-Lift Wells and Systems –failed ballot, resolving comments 19G12 – Gas-lift Automation – 30% Complete 19 G13– HP Gas-lift – 20% on hold 19 G14 – Liquid unloading of gas wells –05%

SC19 report to SC18 January 2015 Perforating Documents – 19B – Perforators – Revising by section 19B1 – Evaluation in Concrete Targets – Ready for ballot 19B2 – Evaluation under stress – Released 19B3 – Evaluation at temperature – In Process 19B4 – Evaluation of Flow Performance – Revision complete 19B5 – Debris Evaluation – Draft complete 19B6 -- Gun Swell – Ready to publish RP67 – Explosive Safety – revising entire document (just beginning, divided in 11 Task Groups) SC approved SR3 for 14L Locks and Landing Nipples to be presented to CSOEM for approval after SC 19 review and editing