Presentation is loading. Please wait.

Presentation is loading. Please wait.

Task Group G Report January 17, 2003

Similar presentations


Presentation on theme: "Task Group G Report January 17, 2003"— Presentation transcript:

1 Task Group G Report January 17, 2003
Month 1998 doc.: IEEE /xxx January 2003 Task Group G Report January 17, 2003 Matthew B. Shoemake IEEE Task Group G Matthew B. Shoemake, Texas Instruments John Doe, His Company

2 Letter Ballot 50 Comment Resolution
Month 1998 doc.: IEEE /xxx January 2003 Letter Ballot 50 Comment Resolution Adopted resolutions on all 352 comments Comment resolutions are available in doc r2 Matthew B. Shoemake, Texas Instruments John Doe, His Company

3 January 2003 Status of the Draft Based on comment resolutions, the draft has been updated to 6.0r1 The draft meets the 4 hour requirement to be voted on at this session Matthew B. Shoemake, Texas Instruments

4 January 2003 Schedule The detailed IEEE g schedule is available in document As of today, current revision is r1 Matthew B. Shoemake, Texas Instruments

5 January 2003 Motion #1 Move to request a 15-day Working Group recirculation ballot on Draft 6.0 of IEEE g with an opening date of January 20, 2003 and a closing date of February 6, 2003. Passed in TGg: Matthew B. Shoemake, Texas Instruments

6 January 2003 Motion #2 Move to request an 802 ExCom ballot on the question of conditional approval to forward to sponsor ballot (Procedure 10) Draft 6.0 of IEEE g. Passed TGg: Matthew B. Shoemake, Texas Instruments

7 January 2003 Motion #3 Whereas IEEE Task Group G would like to have Sponsor Ballot comments to resolve at its March 10-14, 2003 session… Contingent upon obtain Procedure 10 approval for g and contingent upon execution of the 15-day recirculation ballot on Draft 6.0 and contingent upon meeting all the requirements of Procedure 10, reject all comments submitted on the 15-day recirculation ballot and request a 30-day Sponsor Ballot on g Draft 6.0 with a targeted starting date of February 7, 2003. Passed in TGg: Matthew B. Shoemake, Texas Instruments

8 January 2003 Motion #4 In response to the WFA letter to the IEEE 802 Executive Committee (doc ), move to forward the draft response in doc r2 to the IEEE Working Group. Passed in TGg: Matthew B. Shoemake, Texas Instruments

9 January 2003 Motion #5 Move to request that the ANA issue g three new status codes and one new element ID. (Status codes requested are and element ID number requested is 50.) Passed by Unanimous Consent in TGg Matthew B. Shoemake, Texas Instruments

10 January 2003 Motion #6 Move to request publication of draft 6.0r1 of IEEE g immediately following the January 2003 session. Passed in TGg: Matthew B. Shoemake, Texas Instruments

11 Next Meeting Objectives
January 2003 Next Meeting Objectives Review and resolve Sponsor Ballot comments Update to Draft 7.0 Request a Sponsor Recirculation Ballot Matthew B. Shoemake, Texas Instruments

12 January 2003 Backup Matthew B. Shoemake, Texas Instruments

13 History of 802.11g Balloting January 2003
Matthew B. Shoemake, Texas Instruments


Download ppt "Task Group G Report January 17, 2003"

Similar presentations


Ads by Google